PERFORMANCE MANAGEMENT SYSTEM 6.1 The Performance Plan (Annexure A) to this Agreement sets out – 6.1.1 The standards and procedures for evaluating the Employee’s performance; and 6.1.2 The intervals for the evaluation of the Employee’s performance. 6.2 Despite the establishment of agreed intervals for evaluation, the Employer may in addition review the Employee’s performance at any stage while the contract of employment remains in force; 6.3 Personal growth and development needs identified during any performance review discussion must be documented in a Personal Development Plan as well as the actions agreed to and implementation must take place within set time frames; 6.4 The Employee’s performance will be measured in terms of contributions to the goals and strategies set out in the Employer’s Integrated Development Plan (IDP) as described in 6.6 – 6.12 below; 6.5 The Employee will submit quarterly performance reports (SDBIP) and a comprehensive annual performance report at least one week prior to the performance assessment meetings to the Evaluation Panel Chairperson for distribution to the panel members for preparation purposes; 6.6 Assessment of the achievement of results as outlined in the performance plan: 6.6.1 Each KPI or group of KPIs shall be assessed according to the extent to which the specified standards or performance targets have been met and with due regard to ad-hoc tasks that had to be performed under the KPI, and the score of the employer will be given to and explained to the Employee during the assessment interview. 6.6.2 A rating on the five-point scale shall be provided for each KPI or group of KPIs which will then be multiplied by the weighting to calculate the final score; 6.6.3 The Employee will submit his self-evaluation to the Employer prior to the formal assessment; 6.6.4 In the instance where the employee could not perform due to reasons outside the control of the employer and employee, the KPI will not be considered during the evaluation. The employee should provide sufficient evidence in such instances; and 6.6.5 An overall score will be calculated based on the total of the individual scores calculated above.
Performance Tests Contractor shall perform Performance Tests in accordance with Section 11.2 of the Agreement and Attachment S.
Technical Support Services 2.1 The technical support services (the "Services"): Party A agrees to provide to Party B the relevant services requested by Party B, which are specified in Exhibit 1 attached hereto ("Exhibit 1").
Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester. 7.2.2 No later than thirty (30) Days prior to the earlier of the Scheduled Substantial Completion Date or Substantial Completion, Design-Builder shall provide to Owner for review a detailed testing plan for the Performance Tests (other than for air emissions). Owner and Design-Builder shall agree upon a testing plan that shall be consistent with the Performance Test Protocol contained in Exhibit A hereto. After such agreement has been reached, Design-Builder shall notify the Owner five (5) business days prior to the date Design-Builder intends to commence the Performance Tests and shall notify the Owner upon commencement of the Performance Tests. Owner and Independent Engineer each have the right to witness all testing, including the Performance Tests and any equipment testing, whether at the Site or at the Subcontractor’s or equipment supplier’s premises during the course of this Agreement. Notwithstanding the foregoing sentence, Owner shall bear the costs of providing a witness to any such testing and all such witnesses shall comply at all times with Design-Builder’s, Subcontractor’s or equipment supplier’s safety and security procedures and other reasonable requirements, and otherwise conduct themselves in a manner that does not interfere with Design-Builder’s, Subcontractor’s or equipment supplier’s activities or operations. 7.2.3 Design-Builder shall provide to Owner a Performance Test report (excluding results from air emissions testing), including all applicable test data, calculations and certificates indicating the results of the Performance Tests and, within five (5) business days of Owner’s receipt of such results, Owner, Independent Engineer and Design-Builder will jointly inspect such Work and review the results of the Performance Tests to verify that the Performance Guarantee Criteria have been met. If Owner or Independent Engineer reasonably determines that the Performance Guarantee Criteria have not been met, Owner shall notify Design-Builder the reasons why Owner determined that the Performance Guarantee Criteria have not been met and Design-Builder shall promptly take such action or perform such additional work as will achieve the Performance Guarantee Criteria and shall issue to the Owner another notice in accordance with Section 7.2.2; provided however that if the notice relates to a retest, the notice may be provided no less than two (2) business days prior to the Performance Tests. Such procedure shall be repeated as necessary until Owner and Independent Engineer verifies that the Performance Guarantee Criteria have been met. 7.2.4 If Owner, for whatever reason, prevents Design-Builder from demonstrating the Performance Guarantee Criteria within thirty (30) Days of Design-Builder’s notice that the Plant is ready for Performance Testing, then Design-Builder shall be excused from demonstrating compliance with the Performance Guarantee Criteria during such period of time that Design-Builder is prevented from demonstrating compliance with the Performance Guarantee Criteria; provided however that Design-Builder will be deemed to have fulfilled all of its obligations to demonstrate that the Plant meets the Performance Guarantee Criteria should such period of time during which Design-Builder is prevented from demonstrating the Performance Criteria exceed thirty (30) Days or extend beyond the Final Completion Date.
Performance of Work a. Contractor shall perform all Work in a good and workmanlike manner. Contractor shall maintain sufficient staff and crews to perform all Work in an expeditious manner consistent with the interests of the Park District. Contractor shall promptly notify the Park District immediately in writing: (i) of any information required from the Park District and necessary for Contractor to complete its Work in a timely manner; and (ii) of any Work requested by the Park District or required for the project that is not included in the scope of Work reflected in the Contract Documents. Contractor shall be solely responsible for means and methods selected in performing the Work. Contractor shall supervise all Work so that it is performed in a safe and expeditious manner. Contractor shall be solely responsible for the Work of its employees and its subcontractors’ and suppliers’ employees. Contractor shall keep all documents and information related to the project confidential and, except as required by law, shall not disclose such documents or information to any person or other party except the employees of Contractor and its subcontractors who need such documents or information to perform the Work and complete the project. b. Contractor shall confine all equipment, the storage of materials and the operations of its workers, to limits indicated by law, ordinances, permits, or directions of the Park District and shall not unreasonably encumber the project site with such materials. The project site shall not be utilized for the storage of vehicles, materials, equipment, or fixtures not intended for the Work to be performed. c. Contractor shall notify all utility companies, public and private, as necessary in advance of commencing performance of the Work. The responsibility for moving water lines, gas lines, wire lines, service connections, water and gas meter boxes, water and gas valve boxes, light standards, cable ways, signals and all other utility appurtenances which are within the limits of the proposed construction will be assumed by the Contractor, at no additional compensation. The Contractor shall verify the location of all utilities prior to the start of construction and shall be responsible for the preservation of existing utility installation and the cost of providing precautionary supports, braces, or other equipment to insure against damage to said utility installation. The cost to repair and replace any new or existing utilities damaged will be paid for by the Contractor. d. If Contractor uncovers or discovers any concealed condition differing materially from conditions depicted in the Contract Documents or differing from conditions reasonably anticipated or inherent in the Work, Contractor shall immediately stop the Work and notify the Park District of the condition in writing. The Park District shall then issue written directions. Contractor shall not proceed with the Work until the Park District has issued written directions. The contract time and Contract Sum shall be equitably adjusted if necessitated by such directions of the Park District.
Development Program RWJPRI shall be [**] and have [**] in consultation with the JDAC, to select LICENSED COMPOUNDS which shall then be designated PRODUCTS for further DEVELOPMENT by RWJPRI and marketing by ORTHO and its AFFILIATES. RWJPRI shall provide KOSAN with written notice of its decision to select a LICENSED COMPOUND for DEVELOPMENT. Once a PRODUCT has been selected for further DEVELOPMENT, RWJPRI, with the advice of the JDAC, shall have the [**] right to develop the PRODUCT through STAGES O, I, II and III and shall have the [**] right to prepare and file, and shall be the owner of, all applications for MARKETING AUTHORIZATION throughout the world. During such DEVELOPMENT efforts, KOSAN will assist RWJPRI as may be mutually agreed, at RWJPRI's expense, in chemical development, formulation development, production of labeled material and production of sufficient quantities of material for STAGE O and initial STAGE I studies. RWJPRI shall exercise diligent efforts, commensurate with the efforts it would normally exercise for products with similar potential sales volume and consistent with its overall business strategy, in developing such PRODUCT in accordance with the DEVELOPMENT PLAN established by RWJPRI. In the course of such efforts RWJPRI shall, either directly or through an AFFILIATE or SUBLICENSEE to which the license shall have been extended, take appropriate steps including the following: (i) in consultation with the JDAC, select certain LICENSED COMPOUNDS for STAGE O DEVELOPMENT; and (ii) establish and maintain a program reasonably designed, funded and resourced to obtain information adequate to enable the preparation and filing with an appropriate and properly empowered national regulatory authority all necessary documentation, data and [**] CERTAIN INFORMATION IN THIS EXHIBIT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THE OMITTED PORTIONS. other evidence required for IND non-rejection to commence and conduct human clinical trials of such PRODUCT. (iii) proceed following IND non-rejection to commence PHASE I, II, and III clinical trials, associated studies and such other work which RWJPRI reasonably deems to be required for subsequent inclusion in filings for MARKETING AUTHORIZATION; (iv) after such submissions are filed prosecute such submissions and file all reasonably necessary, reports and respond to all reasonable requests from the pertinent regulatory, authorities for information, data, samples, tests and the like.
TECHNICAL EVALUATION (a) Detailed technical evaluation shall be carried out by Purchase Committee pursuant to conditions in the tender document to determine the substantial responsiveness of each tender. For this clause, the substantially responsive bid is one that conforms to all the eligibility and terms and condition of the tender without any material deviation. The Institute’s determination of bid’s responsiveness is to be based on the contents of the bid itself without recourse to extrinsic evidence. The Institute shall evaluate the technical bids also to determine whether they are complete, whether required sureties have been furnished, whether the documents have been properly signed and whether the bids are in order. (b) The technical evaluation committee may call the responsive bidders for discussion or presentation to facilitate and assess their understanding of the scope of work and its execution. However, the committee shall have sole discretion to call for discussion / presentation. (c) Financial bids of only those bidders who qualify the technical criteria will be opened provided all other requirements are fulfilled. (d) AIIMS Jodhpur shall have right to accept or reject any or all tenders without assigning any reasons thereof.
Software Development Software designs, prototypes, and all documentation for the final designs developed under this agreement must be made fully transferable upon direction of NSF. NSF may make the software design, prototype, and documentation for the final design available to competitors for review during any anticipated re-competition of the project.
Project Management Plan 3.2.1 Developer is responsible for all quality assurance and quality control activities necessary to manage the Work, including the Utility Adjustment Work. Developer shall undertake all aspects of quality assurance and quality control for the Project and Work in accordance with the approved Project Management Plan, Good Industry Practice and applicable Law. 3.2.2 Developer shall develop the Project Management Plan and its component parts, plans and other documentation in accordance with the requirements set forth in Section 1.5.2.5
Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.