Phase I and Phase II Plants Sample Clauses

Phase I and Phase II Plants. (a) Seller has constructed a one hundred (100) oven metallurgical coke making plant and related facilities and equipment located at Haverhill (Franklin Furnace), Ohio (the “Site”) owned and operated by Seller based upon heat recovery technology that is proprietary to Seller and its Affiliates (hereinafter referred to as the “Phase I Plant”). The Phase I Plant is designed to produce approximately five hundred fifty thousand (550,000) Tons of Coke based upon the processing of the Base Case Coal Blend into Coke. The Phase I Plant does not produce electrical energy. (b) Seller has constructed an additional one hundred (100) oven metallurgical coke making plant and related facilities and equipment located at the Site utilizing the heat recovery technology that is proprietary to Seller and its Affiliates (the “Phase II Plant”) and an associated cogeneration plant also located at the Site (“Cogeneration Plant”). The Phase II Plant is designed to produce approximately five hundred fifty thousand (550,000) Tons of Coke based upon the processing of the Base Case Coal Blend into Coke. The Cogeneration Plant will produce electrical energy by utilizing flue gas from the Phase II Plant.
AutoNDA by SimpleDocs
Phase I and Phase II Plants. (a) Seller has constructed a one hundred oven metallurgical coke making plant and related facilities and equipment located at Haverhill (Franklin Furnace), Ohio (the "Site") owned and operated by Seller based upon heat recovery technology that is proprietary to Seller and its Affiliates (hereinafter referred to as the "Phase I Plant"). The Phase I Plant is designed to produce approximately 550,000 Tons of blast furnace coke per year based upon the processing of the Base Case Coal Blend into blast furnace coke. The Phase I Plant does not produce electrical power. (b) Seller is to develop an additional one hundred oven metallurgical coke making plant (the "Phase II Plant") and an associated Cogeneration Plant at the Site utilizing such proprietary technology. The Phase II Plant is designed to produce approximately 550,000 Tons of blast furnace coke per year based upon the processing of the Base Case Coal Blend into blast furnace coke, and will produce electrical power by utilizing the flue gas generated from the coke plant portion of the Phase II Plant.

Related to Phase I and Phase II Plants

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Phase I In Phase I, the project will be connected as a tap to the Transmission Owner’s 230kV transmission line MWP-2 via one 230kV circuit breaker in series with one of two ring bus breakers for stuck breaker protection (one in each direction) and a tie-line breaker, as shown on the one-line diagram labeled CL-E-IA-01 attached to this Appendix A as Figure 1. The changes to the existing MWP-2 line protection for this arrangement are described in Phase I System Upgrades in Section II of this Appendix A.

  • PHASE is a distinct portion of the Work to be provided under this Agreement, as specified in the Statement Of Work.

  • Project Completion The Contractor agrees to schedule a final job walk with the County. If required, the County will prepare a list of incomplete items, the “Punch List”. The Contractor agrees to complete the “Punch List” corrections and schedule a final project completion job walk. The County will sign the “Punch List” as completed when determined, the project is finished. The Contractor agrees to submit the following along with its final payment request:

  • Phase 2 Phase 2 is expected to consist of Member Nodes and a select number of Nodes operated by non-Members. The non-Member Nodes will be required to comply with Node hosting terms as set forth by the Council, which may be amended from time to time (the “General Node Terms”).

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in xxxxx, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

  • Construction Phase Fee Contractor’s Construction Phase Fee is the maximum amount payable to Contractor for any cost or profit expectation incurred in the performance of the Work that is not specifically identified as being eligible for reimbursement by Owner elsewhere in this Agreement. References in the UGSC to Contractor’s “overhead” and “profit” mean Contractor’s Construction Phase Fee. The Construction Phase Fee includes, but is not limited to, the following items: 9.1 All profit, profit expectations and costs associated with profit sharing plans such as personnel bonuses, incentives, and rewards; company stock options; or any other like expenses of Contractor.

  • Project Completion Date It is agreed between the Parties that the Project Completion Date is <END DATE, YEAR>. If the Project is not completed by such date then, subject to an amendment agreed to between the Parties, Alberta Innovates may elect to terminate this Investment Agreement. In such event, Alberta Innovates will notify the Applicant of its decision to terminate as soon as reasonably practical and shall advise the Applicant of the effective date of termination. Alberta Innovates will have no liability or obligation to reimburse the Applicant for any Project Costs incurred after the effective date of termination and may require the Applicant to return any portions of the Investment which were spent on Ineligible Expenses. Additionally, any portion of the Investment not used and accounted for in accordance with this Agreement as of the Project Completion Date or earlier termination is repayable by the Applicant to AI at AI’s request.

  • Production Phase contract period in which the Development and the Production are to be performed.

  • Construction Phase Part 1 –