Phase III Retail Space Sample Clauses

Phase III Retail Space. The Redeveloper shall construct not less than fourteen thousand six hundred seven (14,607) ± square feet of retail space (the “Phase III Retail Space”) on the ground floor of the Phase III Improvements. The Phase III Retail Space shall have its principal public façade oriented to the street, and provide for pedestrian access from the street sidewalk. All storefronts shall have a minimum of seventy-five (75%) percent glazing in the street facing elevation.
AutoNDA by SimpleDocs

Related to Phase III Retail Space

  • Storage Space Effective as of the Second Floor Commencement Date, Landlord hereby leases to Tenant certain additional space containing approximately 1,000 rentable square feet in such areas as more particularly designated on Schedule X- 0 xxxxxxxx hereto. In addition, Landlord hereby grants to Tenant the right to lease certain additional storage space in such areas of the Project as are designated for storage by Landlord on a first-come, first-served basis (the initial storage space and additional storage space leased to Tenant by Landlord, if any, are collectively the "Storage Space"). Tenant may exercise its option to lease additional Storage Space from time to time throughout the term of the Lease by giving written notice to Landlord of its desire to lease the same, which notice shall be conditioned upon the availability of the desired space. Tenant shall pay Landlord an annual rental for the Storage Space (the "Storage Rent") equal to $10.25 per rentable square foot of GLA of the Storage Space, adjusted annually at the rate of 2 1/2% per annum. The Lease Years for Storage Space shall be concurrent with the Lease Years for the Premises. No janitorial or trash removal services shall be provided to the Storage Space. No other charges shall be applied, as Additional Rent or otherwise, to the Storage Space, except for charges incurred by Landlord in enforcing its rights relating to the Storage Space under this Lease, in accordance with the terms of this Lease. The Tenant shall have the option, exercisable at any time during the Term, to cancel its lease of the Storage Space, upon thirty (30) days' prior written notice to the Landlord. Except as provided in this Section 2.1(b), the terms and conditions of Tenant's occupancy of the Storage Space shall be as set forth in this Lease. The Storage Space shall be leased in its absolute "AS IS" condition. There shall also be no core factor for the Storage Space (i.e., the usable areas shall be equal to the rentable area).

  • Meeting Space and Facilities The Employer’s offices and facilities may be used by the Union to hold meetings, subject to the agency’s policy, availability of the space and with prior authorization of the Employer.

  • Project Commencement The Grantee shall begin the grant-funded project <<on or before insert date>> <<within 90 days of the original start date of the grant term or grant execution date, whichever is later,>>, unless otherwise approved by System Agency. If project commencement is delayed, the Grantee must submit in writing to the assigned contract manager, the steps taken to initiate the project, the reasons for the delay, and the expected start date. System Agency may require Grantee to take immediate remedial or corrective action in response to any delay.

  • Pre-Commencement Phase Services The services required to be provided by the Contractor for the Pre- Commencement Phase of the Project in accordance with the Contract Documents.

  • Phase 2 Phase 2 is expected to consist of Member Nodes and a select number of Nodes operated by non-Members. The non-Member Nodes will be required to comply with Node hosting terms as set forth by the Council, which may be amended from time to time (the “General Node Terms”).

  • Vacating Premises (i) If the Assuming Bank elects not to purchase any owned Bank Premises, the notice of such election in accordance with Section 4.6(a) shall specify the date upon which the Assuming Bank's occupancy of such premises shall terminate, which date shall not be later than ninety (90) days after the date of the Assuming Bank's notice not to exercise such option. The Assuming Bank promptly shall relinquish and release to the Receiver such premises and the Furniture and Equipment and Fixtures located thereon in the same condition as at Bank Closing, normal wear and tear excepted. By occupying any such premises after the expiration of such ninety (90)-day period, the Assuming Bank shall, at the Receiver's option, (x) be deemed to have agreed to purchase such Bank Premises, and to assume all leases, obligations and liabilities with respect to leased Furniture and Equipment and leased Fixtures located thereon and any ground lease with respect to the land on which such premises are located, and (y) be required to purchase all Furniture and Equipment and Fixtures owned by the Failed Bank and located on such premises as of Bank Closing.

  • School Improvement Plan As permitted under IC § 20-10.2-3-1.5, the Charter shall serve as the Charter School's strategic and continuous school improvement and achievement plan (hereafter, the "School Improvement Plan"). To the extent that IC § 20-10.2 applies to the Charter in its function as the School Improvement Plan, the Organizer shall comply with the requirements under IC § 20-10.2.

  • Parking Space The address required to find and physically park the Lessee’s vehicle is mandatory for this agreement to be valid. Section II. Term (7)

  • School Improvement Plans The School shall develop and implement a School Improvement Plan as required by section 1002.33(9)(n), Florida Statutes and applicable State Board of Education Rules or applicable federal law.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!