Phase One CEAS Sample Clauses

Phase One CEAS compliance with the right of the child to health Having set out the normative and core content of the right of the child to health, this sub-section explores whether the relevant CEAS instruments are consistent with both or at least the minimum standard. The relevant CEAS instruments are the RCD and the QD. Given the complexity of the provisions on health care in each directive, it is convenient to devote a subsection to each directive.
AutoNDA by SimpleDocs
Phase One CEAS compliance with the right of the child to an adequate standard of living
Phase One CEAS compliance with the right of the child to be heard According to Article 12 CRC, the right of the child to be heard pertains to ‘any judicial and administrative proceedings affecting the child’. A large number of asylum proceedings (or ‘procedures’ to use the lexicon of the CEAS) can be identified as relevant to this right. Two sets of procedures are not covered by the APD: procedures for determining the Member State responsible under the DR and the procedures in the RCD for the reduction or withdrawal of reception conditions. The bulk of procedures, however, are governed by the APD, which will be the focus of this section. The procedures in the APD may, with some shoe-xxxxxxx, be classified as follows: · what might be called the ‘regular’ first instance procedure which must generally, subject to some derogations, comply with thebasic principles and guarantees’ set out in Chapter II of the directive;58 57 UNHCR, supra n. 43, para. 72.
Phase One CEAS. COMPLIANCE WITH THE RIGHT OF THE CHILD TO BE HEARD According to Article 12 CRC, the right of the child to be heard pertains to ‘any judicial and administrative proceedings affecting the child’. A large number of asylum proceedings (or ‘procedures’ to use the lexicon of the CEAS) can be identified as relevant to this right. Two sets of procedures are not covered by the APD: procedures for determining the Member State responsible under the DR and the procedures in the RCD for the reduction or withdrawal of reception conditions. The bulk of procedures, however, are governed by the APD, which will be the focus of this section. The procedures in the APD may, with some shoe-xxxxxxx, be classified as follows: · what might be called the ‘regular’ first instance procedure which must generally, subject to some derogations, comply with thebasic principles and guarantees’ set out in Chapter II of the directive;58 57 UNHCR, supra n. 43, para. 72.

Related to Phase One CEAS

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Phase I a. In Phase I, the project will be connected as a tap to the Transmission Owner’s 230kV transmission line MWP-2 via one 230kV circuit breaker in series with one of two ring bus breakers for stuck breaker protection (one in each direction) and a tie-line breaker, as shown on the one-line diagram labeled CL-E-IA-01 attached to this Appendix A as Figure 1. The changes to the existing MWP-2 line protection for this arrangement are described in Phase I System Upgrades in Section II of this Appendix A.

  • Construction Phase Payments 10.3.1 Payments for Construction Phase Services shall be made as provided for in the UGSC and Owner’s Specifications. All payment requests shall be submitted through e- Builder® with a Schedule of Values and include all required attachments. Payment for approved Change Orders shall be made as part of Contractor’s Application for Payment. Failure to submit a Prime Contractor Progress Assessment Report form with each Application for Payment will cause rejection of the application by Owner and its return to Contractor.

  • Phase 2 Phase 2 is expected to consist of Member Nodes and a select number of Nodes operated by non-Members. The non-Member Nodes will be required to comply with Node hosting terms as set forth by the Council, which may be amended from time to time (the “General Node Terms”).

  • PHASE is a distinct portion of the Work to be provided under this Agreement, as specified in the Statement Of Work.

  • Stage One Incident Investigation

  • DS3 Loop DS3 Loop is a two-point digital transmission path which provides for simultaneous two-way transmission of serial, bipolar, return-to-zero isochronous digital electrical signals at a transmission rate of 44.736 megabits per second (Mbps) that is dedicated to the use of the ordering CLEC in its provisioning of local exchange and associated exchange access services. It may provide transport for twenty-eight (28) DS1 channels, each of which provides the digital equivalent of twenty-four (24) analog voice grade channels. The interface to unbundled dedicated DS3 transport is a metallic-based electrical interface.

  • Tests on Completion (i) At least 30 (thirty) days prior to the likely completion of the Project Highway, or a Section thereof, the Contractor shall notify the Authority’s Engineer of its intent to subject the Project Highway or a Section thereof, to Tests. The date and time of each of the Tests shall be determined by the Authority’s Engineer in consultation with the Contractor, and notified to the Authority who may designate its representative to witness the Tests. The Contractor shall either conduct the Tests as directed by the Authority’s Engineer or provide such assistance as the Authority’s Engineer may reasonably require for conducting the Tests. In the event of the Contractor and the Authority’s Engineer failing to mutually agree on the dates for conducting the Tests, the Contractor shall fix the dates by giving not less than 10 (ten) days’ notice to the Authority’s Engineer.

  • Contract Completion The Contractor shall achieve Contract Completion, as the term is defined in this Agreement, within 60 calendar days of Substantial Completion.

  • First sampling In the first sampling four lamps are selected at random. The first sample of two is marked A, the second sample of two is marked B.

Time is Money Join Law Insider Premium to draft better contracts faster.