Pipe Embedment Sample Clauses

Pipe Embedment. 1. Pipe bedding shall be as indicated, using granular material. 2. Place granular embedment as follows: a. With level bottom layer at proper grade to receive and uniformly support pipe barrel throughout its length. b. Form shallow depression under each joint to facilitate jointing. c. Add second layer simultaneously to both sides of pipe with care to avoid displacement. d. Complete promptly after completion of jointing operations. e. Substitute for any part of earth backfill to within 2 ft. of final grade at Design- Builder's option. 3. Compact granular embedment as follows: a. In loose lifts not exceeding 12 inches in depth. b. Rod, spade, or vibrate: (1) As required to meet KDOT Section 205 – Excavation and Embankment for Highways Type B Soil Compaction Requirements. (2) Throughout depth of embedment. c. Compaction using flooding or water spraying techniques will not be allowed. 4. Earth pipe embedment shall be as indicated and shall be used at impervious trench checks. Shape trench bottom to fit pipe and backfill throughout depth of trench with impervious materials. Compact to minimum of 95% of maximum dry density within the moisture content range from 0% below optimum to 2% above optimum. Optimum moisture and maximum dry density shall be determined by ASTM D698.
AutoNDA by SimpleDocs

Related to Pipe Embedment

  • Certification as Small Contractor or Minority Business Enterprise This paragraph was intentionally left blank.

  • Employee Facilities Employee Facilities. Restrooms and attendant facilities shall be provided as required in the orders and regulations of the State of Washington Department of Labor and Industries. A good faith effort will be made by the Employer to provide facilities for employees’ personal belongings.

  • Flexible Work Schedules An employee may request a modification of their current work schedule to another schedule. The Employer, or its designees, may approve or deny flexible work schedules and retain the responsibility for determining exemptions from, or terminations of, flexible work schedules which adversely affect the operation of the Minnesota Judicial Branch or the level of service to the public.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Xxxx has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Xxxx. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Xxxx (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Xxxx, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Xxxx will then have the option of paying the one-time SC rates to place the Loop.

  • Interconnection Customer Compensation If the CAISO requests or directs the Interconnection Customer to provide a service pursuant to Articles 9.6.3 (Payment for Reactive Power) or 13.5.1 of this LGIA, the CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff.

  • Flexible Work Schedule A flexible work schedule is any schedule that is not a regular, alternate, 9/80, or 4/10 work schedule and where the employee is not scheduled to work more than 40 hours in the "workweek" as defined in Subsections F. and H., below.

  • Performance Improvement Plan timely and accurate completion of key actions due within the reporting period 100 percent The Supplier will design and develop an improvement plan and agree milestones and deliverables with the Authority 3.2 The Authority may from time to time make changes to the KPIs measured as set out in paragraph 3.1 above and shall issue a replacement version to the Supplier. The Authority shall give notice In Writing of any such change to the KPIs measured and shall specify the date from which the replacement KPIs must be used for future reports. Such date shall be at least thirty (30) calendar days following the date of the notice to the Supplier.

  • Performance of Bargaining Unit Work No person whose regular job is not in the bargaining unit will work on any job for which rates are established by this Agreement, except for the purposes of instruction, experimentation, or management training, in which case trainees shall not displace or replace any employee in the aforesaid classifications except in cases of emergency when regular employees are not available.

  • COVID-19 Vaccine Passports Pursuant to Texas Health and Safety Code, Section 161.0085(c), Contractor certifies that it does not require its customers to provide any documentation certifying the customer’s COVID-19 vaccination or post-transmission recovery on entry to, to gain access to, or to receive service from the Contractor’s business. Contractor acknowledges that such a vaccine or recovery requirement would make Contractor ineligible for a state-funded contract.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!