Plan Design Issues Sample Clauses

Plan Design Issues. Provide input and advice with respect to Plan Design issues. The selected Offeror will review and present advantages and disadvantages between bundled and unbundled 457(b) plan structures. This may include input and advice regarding provisions of investment advice and education to Plan participants; providing advice with respect to refinement of the investment options for the 457(b), 401(a) plans, 1.62 457(b), 1.62 401(a) and HRA Plan; and any and all related matters regarding the structure and the delivery of services/products under the plans.
AutoNDA by SimpleDocs

Related to Plan Design Issues

  • Plan Design The flexible benefits plan is a cafeteria-style benefits program wherein the County makes a contribution toward the Flexible Benefits Plan for each eligible employee to be allocated during the employee's active employment. The County contribution is distributed by the employee among the menu of benefit options listed below, the specific details and administration of which are set forth in the plan brochures: • Health insurance • County basic life and AD&D insurance • Dental insurance • Vision insurance • Supplemental life insurance • Supplemental accidental death and dismemberment insurance (AD&D) • Flexible spending accounts for pre-tax reimbursement of qualified medical and/or dependent day care expenses. Account credits must be used during the plan year in which they are earned for expenses incurred during the same plan year. • The plan may be modified upon written notice by the County. This plan includes for eligible employees pre-tax contributions for all monies paid toward health, dental, vision and/or voluntary AD&D plans.

  • Schematic Design See Section 2, Part 1, Article 2.1.4, Paragraph 2.1.4.2.

  • Application for Benefits Requests for short-term leaves shall be in writing, upon the appropriate form prescribed and provided by the District, and shall be filed with the unit member's supervisor and the appropriate manager five (5) days in advance of the intended leave (except in emergency situations), unless otherwise stated by the provisions of the specific leave.

  • Study Design This includes a discussion of the evaluation design employed including research questions and hypotheses; type of study design; impacted populations and stakeholders; data sources; and data collection; analysis techniques, including controls or adjustments for differences in comparison groups, controls for other interventions in the State and any sensitivity analyses, and limitations of the study.

  • Schematic Design Phase 1.2.1 Based on the mutually agreed upon Program of Requirements, Amount Available for the Construction Contract and the Project Schedule, the Architect/Engineer shall prepare sufficient alternative approaches utilizing BIM for design and construction of the Project to satisfy Owner’s project requirements and shall, at completion of this phase, submit Schematic Design Documents derived from the model in accordance with the BIM Execution Plan, “Facility Design Guidelines” and any additional requirements set forth in Article 15. The Architect/Engineer shall review alternative approaches to design and construction for the Project as they are being modeled at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by the Owner within the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Schematic Design. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.2.2 Architect/Engineer shall provide all services necessary to perform the services of this phase (preparation of model(s), relevant data, decision support model views and Schematic Design Documents) including, without limitation, unless otherwise approved by Owner, the preparation and prompt delivery of all items specified in the BIM Execution Plan and “Facility Design Guidelines”. 1.2.3 Architect/Engineer shall work closely with Owner in preparation of schematic drawings and shall specifically conform to Owner’s requirements regarding aesthetic design issues. 1.2.4 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.2.5 Before proceeding into the Design Development Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Schematic Design documents and approval of the Architect/Engineer’s preliminary Estimated Construction Cost and schedule. 1.2.6 The Architect/Engineer shall participate in a final review of the Schematic Design Documents and model(s) with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. Prior to the Owner’s approval of the Schematic Design Documents, the Architect/Engineer shall incorporate such changes as are necessary to satisfy the Owner’s review comments, any of which may be appealed for good cause.

  • Commercialization Plan (a) Not later than three [***] after submission of Regulatory Filings for each Product in each country of the Territory, Licensee will provide to the JCC for review its initial Commercialization Plan for each Product for each country in the Territory. Such initial Commercialization Plan will describe Licensee’s plans for activities to be conducted for such Product for such country. Each Commercialization Plan shall include the details of obligations to be performed by Licensee to achieve the specific activities that are applicable to the stage of [***] Certain information in this document has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. Commercialization (e.g., pre-launch, launch planning, launch, or post-launch) of the applicable Product during the time period covered by such Commercialization Plan and subsequent time periods. (b) Prior to the First Commercial Sale for such Product in such country, Licensee will provide to the JCC for review an updated Commercialization Plan for such Product for such country. Such updated Commercialization Plan will include, but not be limited to, Licensee’s updated plans for activities to be conducted for such Product for such country prior to launch as well as activities to be conducted in connection with such launch. (c) Promptly after each anniversary of the First Commercial Sale of such Product during the Term, Licensee will provide to the JCC for review updated Commercialization Plans for such Product for such country. Such further updated Commercialization Plan will include, but not be limited to, Licensee’s plans for Commercialization activities for such Product and such country for the twelve (12) month period following the date of delivery of such Commercialization Plan. No Commercialization Plan may be implemented by Licensee if [***]. Each Commercialization Plan shall be consistent with and shall not contradict the terms of this Agreement [***], and in the event of any inconsistency between the Commercialization Plan and this Agreement, the terms of this Agreement shall prevail. Notwithstanding the foregoing, if a [***], Licensee shall [***] and shall promptly [***].

  • Program Design The County Human Resources Department will operate a Catastrophic Leave Bank which is designed to assist any County employee who has exhausted all paid accruals due to a serious or catastrophic illness, injury, or condition of the employee or family member. The program establishes and maintains a Countywide bank wherein any employee who wishes to contribute may authorize that a portion of his/her accrued vacation, compensatory time, holiday compensatory time or floating holiday be deducted from those account(s) and credited to the Catastrophic Leave Bank. Employees may donate hours either to a specific eligible employee or to the bank. Upon approval, credits from the Catastrophic Leave Bank may be transferred to a requesting employee's sick leave account so that employee may remain in paid status for a longer period of time, thus partially ameliorating the financial impact of the illness, injury, or condition. Catastrophic illness or injury is defined as a critical medical condition, a long-term major physical impairment or disability which manifests itself during employment.

  • Development Plan document specifying the work program, schedule, and relevant investments required for the Development and the Production of a Discovery or set of Discoveries of Oil and Gas in the Concession Area, including its abandonment.

  • Design Development An interim step in the design process. Design Development documents consist of plans, elevations, and other drawings and outline specifications. These documents will fix and illustrate the size and character of the entire project in its essentials as to kinds of materials, type of structure, grade elevations, sidewalks, utilities, roads, parking areas, mechanical and electrical systems, and such other work as may be required.

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!