Plan Refinement Sample Clauses

Plan Refinement. The team will update the plan based on city, stakeholder, and community comments.
AutoNDA by SimpleDocs
Plan Refinement. Company and Town acknowledge and agree that: (i) Town has approved the Master Development Plan and (ii) the parties shall proceed through this Plan Refinement process using the Master Development Plan as the starting point; provided that, to the extent that the Project Plans differ from, or otherwise are inconsistent with, the Master Development Plan, the Project Plans shall control.
Plan Refinement. Company and YRC acknowledge and agree that: (a) YRC has approved the Conceptual/Site Plan; and (b) the parties shall proceed through the Plan Refinement process using the Conceptual/Site Plan as the starting point; provided that, to the extent that the Project Plans differ from, or otherwise are inconsistent with, the Conceptual/Site Plan, the Project Plans shall control.
Plan Refinement. EX2 shall provide NBBJ information received from Design Feedback Sessions, and NBBJ shall refine the Test Designs and trail design guidelines by determining specific details of the design such as lighting, paving materials, graphics, activation and development zones, and sustainability aspects of the corridor (“Plan Refinement”). Upon completion of Plan Refinement, EX2 shall schedule and host a one- (1-) day design meeting with City Representatives at the Municipal Complex during which the Nickel Plate Core Team shall evaluate the design details, including, without limitation, local appropriateness, affordability, maintenance and aesthetics.
Plan Refinement. Plan Refinements may be initiated by the Tribe or, if applicable, a private landowner or leaseholder, and shall be initiated and processed as described in section 4.17.2 of the Tribal HCP. Plan Refinements are changes to conservation requirements that result in equivalent or superior conservation of Covered Species and that have been fully analyzed. Plan Refinements shall not require any amendment to the Tribal HCP, the Section 10(a) Permit, or the IA.
Plan Refinement. Using information received from Design Feedback Sessions, NBBJ shall refine the Test Designs and trail design guidelines by determining specific details of the design such as lighting, paving materials, graphics, activation and development zones, and sustainability aspects of the corridor (“Plan Refinement”). Upon completion of Plan Refinement, NBBJ shall schedule and host a one- (1-) day design meeting with City Representatives at the Municipal Complex during which the Nickel Plate Core Team shall evaluate the design details, including, without limitation, local appropriateness, affordability, maintenance and aesthetics.

Related to Plan Refinement

  • Project Management Plan 3.2.1 Developer is responsible for all quality assurance and quality control activities necessary to manage the Work, including the Utility Adjustment Work. Developer shall undertake all aspects of quality assurance and quality control for the Project and Work in accordance with the approved Project Management Plan, Good Industry Practice and applicable Law. 3.2.2 Developer shall develop the Project Management Plan and its component parts, plans and other documentation in accordance with the requirements set forth in Section 1.5.2.5

  • Performance Improvement Plan timely and accurate completion of key actions due within the reporting period 100 percent The Supplier will design and develop an improvement plan and agree milestones and deliverables with the Authority 3.2 The Authority may from time to time make changes to the KPIs measured as set out in paragraph 3.1 above and shall issue a replacement version to the Supplier. The Authority shall give notice In Writing of any such change to the KPIs measured and shall specify the date from which the replacement KPIs must be used for future reports. Such date shall be at least thirty (30) calendar days following the date of the notice to the Supplier.

  • Procurement Planning Prior to the issuance of any invitations to bid for contracts, the proposed procurement plan for the Project shall be furnished to the Association for its review and approval, in accordance with the provisions of paragraph 1 of Appendix 1 to the Guidelines. Procurement of all goods and works shall be undertaken in accordance with such procurement plan as shall have been approved by the Association, and with the provisions of said paragraph 1.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Management Plan The Management Plan is the description and definition of the phasing, sequencing and timing of the major Individual Project activities for design, construction procurement, construction and occupancy as described in the IPPA.

  • Preventive Services All necessary procedures to prevent the occurrence of oral disease, including: Cleaning and scaling Topical application of fluoride Space maintainers

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.

  • Construction Commencement The Connecting Transmission Owner shall commence construction of the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades for which it is responsible as soon as practicable after the following additional conditions are satisfied: 5.6.1 Approval of the appropriate Governmental Authority has been obtained for any facilities requiring regulatory approval; 5.6.2 Necessary real property rights and rights-of-way have been obtained, to the extent required for the construction of a discrete aspect of the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades; 5.6.3 The Connecting Transmission Owner has received written authorization to proceed with construction from the Developer by the date specified in Appendix B hereto; and 5.6.4 The Developer has provided security to the Connecting Transmission Owner in accordance with Article 11.5 by the dates specified in Appendix B hereto.

  • Program Management 1.1.01 Implement and operate an Immunization Program as a Responsible Entity 1.1.02 Identify at least one individual to act as the program contact in the following areas: 1. Immunization Program Manager;