Plan Review. If the applicant falls within the requirements of site plan or subdivision review, then the applicant shall submit a street system plan for review and approval prior to Land Use approval. The plan shall be prepared by an engineer licensed in the State of Oregon. Complete design documents, including revisions as required by the City, shall be required before receiving construction plan approval for each phase of construction. The construction plan is valid for the period that the Land Use Decision approval is valid. A street system plan will be submitted to the City with the Land Use Decision application for all proposed development that intends to dedicate the road and street infrastructure to the public. The Land Use Decision application plan shall include the proposed layout of initial, phased, and ultimate build-out of the street system, location(s) of snow storage areas, fire access and drainage concepts. The plan shall also include general location(s) of proposed connection to the existing City street system, grades of the road network and proposed pedestrian and vehicular safety improvements. The plan shall also identify the anticipated location of contractor’s construction staging area(s). This information will assist the City in confirming that the surrounding street network has adequate capacity to support the proposed development, assess whether a comprehensive traffic study is warranted and assist in the City’s determination if the site presents the potential for erosion and road stability problems. In addition, the information will be used to determine whether the proposed development shall assume the financial responsibility for any public safety improvements necessary to accommodate the proposed development.
Appears in 2 contracts
Samples: www.ci.madras.or.us, www.ci.madras.or.us
Plan Review. If the applicant falls within the requirements of site plan or subdivision review, then the applicant shall submit a street system plan for review and approval prior to Land Use approval. The plan shall be prepared by an engineer licensed in the State of Oregon. Complete design documents, including revisions as required by the City, shall be required before receiving construction plan approval for each phase of construction. The construction plan is valid for the period that the Land Use Decision approval is valid. A street system plan will be submitted to the City with the Land Use Decision application for all proposed development that intends to dedicate the road and street infrastructure to the public. The Land Use Decision application plan shall include the proposed layout of initial, phased, and ultimate build-out of the street system, location(s) of snow storage areas, fire access and drainage concepts. The plan shall also include general location(s) of proposed connection to the existing City street system, grades of the road network and proposed pedestrian and vehicular safety improvements. The plan shall also identify the anticipated location of contractor’s construction staging area(s). This information will assist the City in confirming that the surrounding street network has adequate capacity to support the proposed development, assess whether a comprehensive traffic study is warranted and assist in the City’s determination if the site presents the potential for erosion and road stability problems. In addition, the information will be used to determine whether the proposed development shall assume the financial responsibility for any public safety improvements necessary to accommodate the proposed development.
Appears in 2 contracts
Samples: www.ci.madras.or.us, www.ci.madras.or.us