Position Fixing System (PFS Sample Clauses

Position Fixing System (PFS. It shall be in the form of Differential Global Positioning system (DGPS) or Real time Kinematic System (RTKS) based DGPS system of accredited/ IHO approved make providing sub-metre accuracy in position fixing. The system shall be established in such a manner that it shall fully cover the site of the Works and be constantly in operation during the course of the dredging works. The system shall consist of ship borne masters or receivers (one for each dredger and one for each survey launch), distance measuring units, the requisite number of shore stations, interfaces, track plotters, data storage facilities and sufficient spares to enable uninterrupted operation of the system, to the accuracy specified and on board computer and printer and suitable navigational software.
AutoNDA by SimpleDocs
Position Fixing System (PFS. It shall be in the form of Differential Global Positioning system (DGPS) or Real time Kinematic System (RTKS) based DGPS system of accredited/ IHO approved make providing sub-metre accuracy in position fixing. The system shall be established in such a manner that it shall fully cover the site of the Works and be constantly in operation during the course of the dredging works. The system shall consist of ship borne masters or receivers (one for each dredger and one for each survey launch), distance measuring units, the requisite number of shore stations, interfaces, track plotters, data storage facilities and sufficient spares to enable uninterrupted operation of the system, to the accuracy specified and on board computer and printer and suitable navigational software. Installation and Testing The system shall be installed, tested and set to work for continuous operation during all dredging and survey operations. The system shall be fully operational, a minimum of 7 days before surveying operations commence including Field Calibration and base line check. Once operational the system shall remain in continuous operation until the last Post- Dredging survey is completed and the last Post-dredging survey drawings have been signed and have been accepted by the Engineer's Representative. The PFS should have hundred percent in-built standby equipment to cater for the failure of any individual components. The PFS shall at all times maintain a repeatable accuracy, for any point within the Work site of plus or minus 1.0 m in the horizontal plane. Giving Notice of any Irregularities The Contractor shall inform the Engineer's Representative forthwith of any breakdown irregularities or otherwise, affecting the positioning of his vessels or other equipment. Delays incurred in the dredging operation due to malfunctioning of the PFS/ AHSS shall not be reimbursed under the Contract and will not entitle the Contractor to an extension of time for completion.

Related to Position Fixing System (PFS

  • Customer Content As part of the Services provided under this Agreement, Customer Data will be stored and processed in the data center region specified in the applicable Ordering Document. Axway shall not access Customer Content except in response to support or technical issues where Customer provides Axway with prior Customer’s written authorization required to access such Customer Content. Axway is not responsible for unauthorized access, alteration, theft or destruction of Customer Content arising from Customer’s own or its authorized users’ actions or omissions in contravention of the Documentation. Customer’s ability to recover any lost data resulting from Axway’s misconduct is limited to restoration by Axway from the most recent back-up.

  • Connecting Transmission Owner’s Scope of Work and Responsibilities The Connecting Transmission Owner will design, construct, own, operate and maintain all Connecting Transmission Owner’s Interconnection Facilities, except as otherwise stated above and in the Project Specific Specifications. The Connecting Transmission Owner will complete all engineering reviews, field verifications and witness testing, etc. in accordance with the ESBs and the Project Specific Specifications. Connecting Transmission Owner shall provide the revenue metering CT/PT units and meter socket enclosure. The Connecting Transmission Owner shall:  provide, run, and wire both ends of the color-coded cable for the revenue metering instrument transformer secondary wiring;  perform all terminations; and  supply and install the meter. The revenue meter may require a communications link to the RTU. The Connecting Transmission Owner will specify and run those communications cables. The Connecting Transmission Owner shall complete all wiring, testing and commissioning of the RTU.

  • Contract Database Metadata Elements Title: Whitesville Central School District and Whitesville Central School Educational Support Staff Association (2003) Employer Name: Whitesville Central School District Union: Whitesville Central School Educational Support Staff Association Local: Effective Date: 07/01/2003 Expiration Date: 06/30/2006 PERB ID Number: 10699 Unit Size: Number of Pages: 23 For additional research information and assistance, please visit the Research page of the Catherwood website - xxxx://xxx.xxx.xxxxxxx.xxx/library/research/ For additional information on the ILR School - xxxx://xxx.xxx.xxxxxxx.xxx/ AGREEMENT BETWEEN WHITESVILLE CENTRAL SCHOOL EDUCATIONAL SUPPORT STAFF ASSOCIATION AND THE WHITESVILLE CENTRAL SCHOOL DISTRICT JULY 1, 2003 THROUGH JUNE 30, 2006 TABLE OF CONTENTS ARTICLE TITLE PAGE Preamble 1 I Recognition 1 II Collective Bargaining U n i t 1 III Dues/Agency Fee Ckoffand Payroll Deduction 1 IV Rights of Employees 2 V Rights of Employer ------------- 2 VI Personnel F i l e 2 VII Employee Definitions 3 VIII Permanent Status/Seniority 4 IX Wages 5 X Overtime 7 XI Vacation 7 XII Holidays 8 XIII Sick Leave and Leavesof A b s e n c e 8 XIV Conference, Workshops,Required Courses 10 XV Meal Allowance and M i l e a g e 11 XVI Retirement 11 XVII Insurance 12 XVIII Cafeteria P l a n 14 .XIX Uniform Allowance------------------ 14 XX Hours of W o r k 14 XXI Transfers/Promotions 15 XXII Job Descriptions 15 XXIII Grievance Procedure 15 XIV Copies of the Contract 18 XV Zipper C x x x x x 18 XXVI Legislative Clause 18 XXVII Duration 19 SIGNATURES 19 APPENDIX A Grievance F o r m 20 APPENDIX B Dues Authorization F o r m 21

  • Alternate Work Sites Employees may be assigned or authorized to report to work at an alternative work site(s) and be paid for the time worked.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Interconnection Customer Compensation If the CAISO requests or directs the Interconnection Customer to provide a service pursuant to Articles 9.6.3 (Payment for Reactive Power) or 13.5.1 of this LGIA, the CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff.

  • Net Metering If you generate electricity from a renewable generating facility to offset your electricity consumption and/or use net metering at any time during the term of this Agreement, you must notify Starion.

  • PROPANE GAS SYSTEM SERVICE AREA If the Property is located in a propane gas system service area owned by a distribution system retailer, Seller must give Buyer written notice as required by §141.010, Texas Utilities Code. An addendum containing the notice approved by TREC or required by the parties should be used.

  • Network Resource Interconnection Service (check if selected)

  • Functionality Customer is entitled to additional functionality previously purchased or bundled with the software if available in the version or update released on or after the start date of the Agreement. Customer acknowledges that certain functionality in current and previous software versions may not be available in future upgrades. Added functionality may require additional paid services (clinical and technical) to configure and support.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!