Preinstallation Conference Sample Clauses

Preinstallation Conference. Conduct conference at Project site to comply with requirements in Division 01 Section "Project Management and Coordination."
AutoNDA by SimpleDocs
Preinstallation Conference. A. Prior to the scheduled commencement of the roofing installation and associated work, conduct a meeting at the project site with the installer, Consultant, Owner, Contractor, and any other persons directly involved with the performance of the work. The installer shall record conference discussions to include decisions, agreements, and open issues and furnish copies of recorded discussions to each attending party. The primary purpose of the meeting is to review foreseeable methods and procedures related to roofing work. 1. Meet with Owner, Consultant, roofing Installer, and installers whose work interfaces with or affects roofing including installers of roof accessories and roof-mounted equipment. 2. Review methods and procedures related to roofing installation, including manufacturer's written instructions. 3. Review and finalize construction schedule and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays. 4. Examine deck substrate conditions and finishes for compliance with requirements, including flatness and fastening. Multi-Site Roof Replacement Project Village of Buffalo Grove IRS Project 18190 07 31 13 - 4 Fiberglass-Reinforced Asphalt Shingles Four (4) Separate Buildings 5. Review structural loading limitations of roof deck during and after roofing.
Preinstallation Conference. Conduct conference at Project Site with Owner and Landscape Architect.
Preinstallation Conference. Conduct conference at Project site to comply with requirements in Division 01. Review methods and procedures related to aluminum windows including, but not limited to, the following: 1. Review and finalize construction schedule and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays. 2. Review and discuss the finishing of aluminum storefront that is required to be coordinated with the finishing of other aluminum work for color and finish matching. 3. Review, discuss, and coordinate the interrelationship of aluminum storefront with other exterior wall components. Include provisions for structural anchorage, glazing, flashing, weeping, sealants, and protection of finishes. 4. Review and discuss the sequence of work required to construct a watertight and weathertight exterior building envelope. 5. Inspect and discuss the condition of substrate and other preparatory work performed by other trades.
Preinstallation Conference. Conduct conference at Project site.
Preinstallation Conference. Conduct conference at Project site. 1. Before submitting design mixtures, review concrete design mixture and examine procedures for ensuring quality of concrete materials. Require representatives of each entity directly concerned with cast-in-place concrete to attend, including the following: a. Contractor's superintendent. b. Independent testing agency responsible for concrete design mixtures. c. Ready-mix concrete manufacturer. d. Concrete subcontractor. 2. Review special inspection and testing and inspecting agency procedures for field quality control, concrete finishes and finishing, cold- and hot-weather concreting procedures, curing procedures, construction contraction and isolation joints, and joint-filler strips, forms and form removal limitations, vapor-retarder installation, anchor rod and anchorage device installation tolerances, steel reinforcement installation, floor and slab flatness and levelness measurement, concrete repair procedures, and concrete protection.
Preinstallation Conference. Conduct conference at Project site. 1. Include Owner, Architect, Installer, Manufacturer’s technical representative, and installers of other construction affecting or connecting to air barrier, including roofing, waterproofing, architectural precast concrete, masonry, sealants, windows, glazed curtain walls, and door frames. 2. Review air barrier requirements including surface preparation, substrate condition and pretreatment, minimum substrate curing period, forecasted weather conditions, special details and sheet flashings, mockups, installation procedures, sequence of installation, testing and inspecting procedures, and protection and repairs.
AutoNDA by SimpleDocs
Preinstallation Conference. Conduct conference at Project site. 1. Review methods and procedures related to marking pavement including, but not limited to, the following: a. Pavement aging period before application of pavement markings. b. Review requirements for protecting pavement markings, including restriction of traffic during installation period.
Preinstallation Conference 

Related to Preinstallation Conference

  • Equipment Installation In order to meet its obligations under this Agreement, a Party that owns, rents, or leases equipment (the equipment owner) may require installation of such equipment on property owned by another Party (the property owner), provided that the property is being used for an electric utility purpose and that the property owner shall not be required to do so if it would thereby be prevented from performing its own obligations or exercising its rights under this Agreement.

  • Installation Where installation is required, Contractor shall be responsible for placing and installing the equipment or parts in the required locations at no additional charge, unless otherwise specified in the Price Sheets. All materials used in the installation shall be of good quality and shall be free of defects that would diminish the appearance of the equipment or render it structurally or operationally unsound. Installation includes the furnishing of any equipment, rigging, and materials required to install or replace the equipment or parts in the proper location. Contractor shall protect the site from damage and shall repair damages or injury caused during installation by Contractor or its employees or agents. If any alteration, dismantling, excavation, etc., is required to achieve installation, the Contractor shall promptly restore the structure or site to its original condition. Contractor shall perform installation work so as to cause the least inconvenience and interference with Customers and with proper consideration of others on site. Upon completion of the installation, the location and surrounding area of work shall be left clean and in a neat and unobstructed condition, with everything in satisfactory repair and order.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!