ADJUSTING AND CLEANING. A. All electrical equipment, including existing equipment not "finish painted" under other sections, shall be touched up where finished surface is marred or damaged.
B. All equipment shall be left in clean condition, with all shipping and otherwise unnecessary labels removed there from.
C. All metal shavings shall be removed, and rust inhibitor applied to minimize oxidation of new steel equipment and boxes.
ADJUSTING AND CLEANING. A. Adjust door to provide for weather tightness, and leave doors clean and free of debris.
ADJUSTING AND CLEANING. A. Adjust doors and hardware after installation for proper operation.
B. Remove and replace doors and frames that are warped, bowed, or otherwise damaged.
ADJUSTING AND CLEANING. A. Adjust site accessories for proper operation and verify that mechanisms function smoothly. Replace damaged or defective items.
B. Clean all exposed surfaces in strict accordance with manufacturer's recommendations after removing temporary labels and protective coatings.
ADJUSTING AND CLEANING. A. Align luminaires and clean lenses and diffusers at completion of Work. Clean paint splatters, dirt, and debris from installed luminaires.
B. Touch up luminaire finish at completion of work.
3.04 LUMINAIRE SCHEDULE A. See contract drawings.
ADJUSTING AND CLEANING. A. At final completion, hardware shall be left clean and free from disfigurement. Make final adjustment to door closers and other items of hardware. Where hardware is found defective repair or replace or otherwise correct as directed.
B. Adjust door closers to meet opening force requirements of Uniform Federal Accessibility Standards.
ADJUSTING AND CLEANING. A. Remove equipment, materials and debris, leaving area in undamaged, clean condition. B. Neatly cut and trim materials as required.
ADJUSTING AND CLEANING. A. Repair damaged and defective woodwork, where possible, to eliminate functional and visual defects; where not possible to repair, replace woodwork. Adjust joinery for uniform appearance.
B. Clean, lubricate, and adjust hardware.
C. Clean woodwork on exposed and semiexposed surfaces. Touch up shop-applied finishes to restore damaged or soiled areas.
ADJUSTING AND CLEANING. A. Repair of deficiencies: Installations of details noted as deficient during final inspection shall be repaired and corrected by applicator, and made ready for re-inspection, within five (5) days.
B. Clean-up: Immediately upon job completion, roof membrane and flashing surfaces shall be cleaned of debris. Clean drains, gutters, and downspouts of debris. END OF SECTION May 2017 C01025C17 Georgetown Wet Weather Treatment Station 07513 - 16 MODIFIED BITUMEN ROOFING SYSTEM This page intentionally left blank. May 2017 C01025C17 Georgetown Wet Weather Treatment Station 07550 - 1 VEGETATED ROOF ASSEMBLY SECTION 07550 VEGETATED ROOF ASSEMBLY
ADJUSTING AND CLEANING. A. Touchup Painting: Immediately after erection, clean field welds, bolted connections, and abraded areas. Paint uncoated and abraded areas with the same material as used for shop painting to comply with SSPC-PA 1 for touching up shop-painted surfaces.
1. Apply by brush or spray to provide a minimum 2.0-mil dry film thickness.
B. Galvanized Surfaces: Clean field welds, bolted connections, and abraded areas and repair galvanizing to comply with ASTM A 780.