Preliminary Plat (PP) Sample Clauses

Preliminary Plat (PP). The proposed preliminary plat consists of 9 building lots and 2 common lots on 1.539-acre property in the proposed R-8 zoning district. Proposed lots range in size from 4,237 to 5,332 square feet (s.f.) (or
AutoNDA by SimpleDocs
Preliminary Plat (PP). The proposed preliminary plat consists of 14 building lots and 2 common lots on 4.84 acres of land in the proposed R-4 zoning district. Proposed lots range in size from 8,132 to 11,219 square feet (s.f.) with a 32,231 square feet lot where the existing home is proposed to remain. The subdivision is proposed to develop in one phase as shown on the preliminary plat in Section VIII.B. Existing Structures/Site Improvements: There is an existing home and several outbuildings on the property that currently takes access via XxXxxxxx Xx. The existing home is proposed to remain on Lot 6, Block 4 and access will be taken internally from within the subdivision. Prior to the City Engineer’s signature on the final plat, all existing structures that do not conform to the setbacks of the district are required to be removed. Dimensional Standards (UDC 11-2): The proposed plat and subsequent development is required to comply with the dimensional standards listed in UDC 11-2A-3 and Table 11-2A-5 for the R-4 zoning district. The proposed plat appears to comply with the dimensional standards of the district, except for the street frontage of Lot 8, Block 4 which should be a minimum of 30 feet; the plans should be revised accordingly. Access: Access is proposed via internal local streets. E. Territory St. is proposed to be extended from the west to the east boundary for future extension to the east. The existing access via XxXxxxxx Xx. is required to be removed. The address for the existing home is required to change since access will no longer be provided from XxXxxxxx Xx.; the new address will be off Matador Ct.

Related to Preliminary Plat (PP)

  • Preliminary Engineering In order to receive City review and approval of the Extensions, Developer shall furnish two (2) copies of the plat map, topographic map and proposed roads profile sheets in electronic format prior to the City’s ordering of the engineering plans from its Engineer. The contour elevation and road profile elevations shall be referenced to NAVD ‘88 datum. In the event Developer’s engineer prepares the construction plans and specifications, the above information shall be a part of the extension construction plans to be reviewed and approved by the City’s Engineer. The final plat map shall be to the scale of 1-inch = 20 feet. The contour map shall have a scale of 1-inch = 20 feet and contour intervals of two (2) feet or less. The road profile sheets shall be to the scale of 1-inch = 20 feet. Developer shall provide a minimum of one benchmark, datum being NAVD ‘88, on the project site; and the elevation and location of the benchmark shall be indicated on the maps furnished by Developer.

  • Construction Progress Schedule A schedule indicating proposed activity sequences and durations, milestone dates for receipt and approval of pertinent information, preparation, submittal, and processing of Shop Drawings and Samples, delivery of materials or equipment requiring long-lead time procurement, and proposed date(s) of Material Completion and Occupancy and Final Completion. The schedule will be developed to represent the sixteen or seventeen CSI Specification Divisions. It shall have a minimum number of activities as required to adequately represent to Owner the complete scope of work and define the Project’s critical path and associated activities. If the Project is to be phased, then each individual Phase should be identified from start through completion of the overall Project and should be individually scheduled and described, including any Owner’s occupancy requirements and showing portions of the Project having occupancy priority. The format of the schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, Material Completion and Occupancy Date, final inspection dates, Punchlist, and Final Completion date.

  • Preliminary Design Phase During the Preliminary Design Phase, the CONSULTANT shall, if requested by the CITY and accepted by the CONSULTANT as part of a Services Authorization: