Preparation of Schematic Plans Sample Clauses

Preparation of Schematic Plans. Upon completion of the Conceptual Master Plan and acceptance of the same by both Society and the City, Society shall contract with the Design Team for the preparation of schematic plans for the buildout of the Facility (the “Schematic Plans”), at Society’s expense. The Schematic Plans shall include, at a minimum, fifteen (15%) to twenty-five percent (25%) design plans, inclusive of major onsite infrastructure and points of connection. Schematic Plans shall also include reasonable projections of utility needs for the Facility, including, but not necessarily limited to, water (potable and recycled), sewer, and electricity.
AutoNDA by SimpleDocs

Related to Preparation of Schematic Plans

  • Schematic Design See Section 2, Part 1, Article 2.1.4, Paragraph 2.1.4.2.

  • Completion of Evaluation Cycle 1. The summative evaluation rating shall be based upon a preponderance of the evidence, assessed in a holistic manner, that is aligned to the Ohio Educator Standards. Only evidence gathered during the walkthroughs and formal observations that are conducted for the current school year may be used.

  • Protocols Each party hereby agrees that the inclusion of additional protocols may be required to make this Agreement specific. All such protocols shall be negotiated, determined and agreed upon by both parties hereto.

  • Implementation of Strategic Plan Goals This Agreement supports the County’s Strategic Plan, Goal 1, Operational Effectiveness/Fiscal Sustainability. This Agreement will provide revenue reimbursement to the Department for services rendered.

  • COVID-19 Protocols Contractor will abide by all applicable COVID-19 protocols set forth in the District’s Reopening and COVID-19 Mitigation Plan and the safety guidelines for COVID-19 prevention established by the California Department of Public Health and the Ventura County Department of Public Health.

  • Office of Inspector General Investigative Findings Expert Review In accordance with Senate Bill 799, Acts 2021, 87th Leg., R.S., if Texas Government Code, Section 531.102(m-1)(2) is applicable to this Contract, Contractor affirms that it possesses the necessary occupational licenses and experience.

  • EVALUATION OF PROJECT BENEFITS The goal of this task is to report the benefits resulting from this project. The Recipient shall:

  • DISQUALIFICATION FOR PAST PERFORMANCE AND FINDINGS OF NON RESPONSIBILITY Bidder may be disqualified from receiving awards if Bidder, or anyone in Bidder’s employment, has previously failed to perform satisfactorily in connection with public Bidding or contracts or is deemed non- responsible.

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • Finalization of Evaluation A Written Report 1 Before the evaluation cycle is final, and not later than May 10, a copy of the formal written evaluation report shall be given to the teacher and a conference shall be held between the teacher and the evaluator.

Time is Money Join Law Insider Premium to draft better contracts faster.