Prepare Preliminary Technical Specifications. This task includes assembling the technical specifications necessary for the project. Standard FAA specifications will be utilized where possible, with the guidance from FAA AC 150/5370-10 (Current Edition), Standard Specifications for Construction of Airports. Additional specifications will be prepared to address work items for materials that are not covered by the standard FAA specifications. The standard specifications to be utilized shall include, but are not limited to, the following: ✈ Item C-100 Contractor Quality Control Program (CQCP) ✈ Item C-102 Temporary Air and Water Pollution, Soil Erosion and Siltation Control ✈ Item C-105 Mobilization ✈ Item C-110 Method of Estimating Percentage of Material Within Specification Limits (PWL) ✈ Item P-101 Preparation/Removal of Existing Pavements ✈ Item P-151 Clearing and Grubbing ✈ Item P-152 Excavation, Subgrade and Embankment ✈ Item P-153 Controlled Low-Strength Material (CLSM) ✈ Item P-154 Subbase Course ✈ Item P-155 Lime-Treated Subgrade ✈ Item P-156 Cement Treated Subgrade ✈ Item P-208 Aggregate Base Course ✈ Item P-209 Crushed Aggregate Base Course ✈ Item P-306 Lean Concrete Base Course ✈ Item P-501 Cement Concrete Pavement ✈ Item P-604 Compression Joint Seals for Concrete Pavements ✈ Item P-605 Joint Sealants for Pavements ✈ Item P-610 Concrete for Miscellaneous Structures ✈ Item P-620 Runway and Taxiway Marking ✈ Item P-621 Saw-Cut Grooves ✈ Item D-701 Pipe for Storm Drains and Culverts ✈ Item D-702 Slotted Drains ✈ Item D-705 Pipe Underdrains for Airports ✈ Item D-751 Manholes, Catch Basins, Inlets and Inspection Holes ✈ Item D-752 Concrete Culverts, Headwalls and Miscellaneous Drainage Structures ✈ Item F-162 Chain Link Fences ✈ Item T-901 Seeding ✈ Item T-905 Topsoil ✈ Item L-107 Airport Wind Cones ✈ Item L-108 Underground Power Cable for Airports ✈ Item L-110 Airport Underground Electrical Duct Banks and Conduits ✈ Item L-115 Electrical Manholes and Junction Structures ✈ Item L-119 Airport Obstruction Lights ✈ Item L-125 Installation of Airport Lighting Systems Additional Non-FAA specifications will include, but are not limited to, the following items: ✈ Item P-159 Watering ✈ Item P-222 Soil Sterilization ✈ Item D-710 Rock Riprap Vehicle Service Road Relocation ✈ MO-105 Mobilization ✈ MO-152 Unclassified Excavation ✈ MO-155 Fly Ash Treated Subgrade ✈ MO-156 Erosion and Sediment Control ✈ MO-209 Crushed Aggregate Base Course ✈ MO-620 Runway and Taxiway Painting ✈ MO-701 Pipe for Storm Drains and C...
AutoNDA by SimpleDocs
Prepare Preliminary Technical Specifications. The engineer will assemble the technical specifications necessary for the intended work. MoDOT Standard Specifications for Road and Bridge Construction will be followed as appropriate. Discussions with MoDOT and the Sponsor will provide guidance to the Engineer in the use of appropriate technical specifications. Project specific Technical Specifications to be utilized will include, but not be limited to the following items:  Mobilization  Excavation and Embankment  Temporary pollution, Soil Erosion and Siltation Control  Pavement Specifications  Landscaping and Watering  Seeding  Erosion Control  Structures  Signage and Related Details  Maintenance of Traffic During Construction  Coordination of Utility Activities
Prepare Preliminary Technical Specifications. This task includes assembling the technical specifications necessary for the project. Standard FAA specifications will be utilized where possible, with the guidance from FAA AC 150/5370-10 (Current Edition), Standard Specifications for Construction of Airports. Additional specifications will be prepared to address work items for materials that are not covered by the standard FAA specifications. The standard specifications to be utilized shall include, but are not limited to, the following: • Item C-102 Temporary Air and Water Pollution, Soil Erosion and Siltation Control • Item C-105 Mobilization • Item L-101 Airport Rotating Beacons • Item L-108 Underground Power Cable for Airports • Item L-110 Airport Underground Electrical Duct Banks and Conduits • Item L-115 Electrical Manholes and Junction Structures • Item L-119 Airport Obstruction Lights Additional Non-FAA specifications will include, but are not limited to, the following items: • L-126 Automated Weather Observing System
Prepare Preliminary Technical Specifications. This task includes assembling the technical specifications necessary for the project. Standard FAA specifications will be utilized where possible, with the guidance from the current edition of the FAA AC 150/5370-10H, Standard Specifications for Construction of Airports. Additional specifications will be prepared to address work items for materials that are not covered by the standard FAA specifications. The standard specifications to be utilized shall include, but are not limited to, the following:  Item C-100 Contractor Quality Control Program (CQCP)  Item C-102 Temporary Air and Water Pollution, Soil Erosion and Siltation Control  Item C-105 Mobilization  Item P-152 Excavation, Subgrade, and Embankment  Item P-604 Compression Joint Seals for Concrete Pavements  Item P-605 Joint Sealants for Pavements  Item P-608 Emulsified Asphalt Seal Coat  Item P-620 Runway and Taxiway Marking  Item D-701 Pipe for Storm Drains and Culverts  Item D-751 Manholes, Catch Basins, Inlets and Inspection Holes
Prepare Preliminary Technical Specifications. This task includes assembling the technical specifications necessary for the project. Standard FAA specifications will be utilized where possible, with the guidance from the current edition of the FAA Advisory Circular 150/5220-20A, Airport Snow and Ice Control Equipment. Additional specifications will be prepared to address work items for materials that are not covered by the standard FAA specifications. This task also includes coordination with the Sponsor on the vehicle specification and preparing the vehicle specification.
Prepare Preliminary Technical Specifications a. Mobilization

Related to Prepare Preliminary Technical Specifications

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Technical Specification As enumerated in Special Conditions of Contract/Scope of Work/attached Drawing/ Details/Schedule of Rates.

  • DAF Specifications Developer shall submit initial specifications for the DAF, including System Protection Facilities, to Connecting Transmission Owner and NYISO at least one hundred eighty (180) Calendar Days prior to the Initial Synchronization Date; and final specifications for review and comment at least ninety (90) Calendar Days prior to the Initial Synchronization Date. Connecting Transmission Owner and NYISO shall review such specifications to ensure that the DAF are compatible with the technical specifications, operational control, and safety requirements of the Connecting Transmission Owner and NYISO and comment on such specifications within thirty (30) Calendar Days of Developer’s submission. All specifications provided hereunder shall be deemed to be Confidential Information.

  • General specifications 6.1.1. A vehicle and its electrical/electronic system(s) or ESA(s) shall be so designed, constructed and fitted as to enable the vehicle, in normal conditions of use, to comply with the requirements of this Regulation.

  • MSAA Indicator Technical Specification Document This Agreement shall be interpreted with reference to the MSAA Indicator Technical Specifications document.

  • The Specifications The Specifications are that portion of the Contract Documents consisting of the written requirements for materials, equipment, systems, standards and workmanship for the Work, and performance of related services.

  • Technical Specifications and Drawings a) The Goods and Related Services supplied under this Contract shall conform to the technical specifications and standards mentioned in Section VI, Schedule of Requirements and, when no applicable standard is mentioned, the standard shall be equivalent or superior to the official standards whose application is appropriate to the Goods' country of origin.

  • EODUF Packing Specifications 7.3.1 The data will be packed using ATIS EMI records. A pack will contain a minimum of one (1) message record or a maximum of ninety-nine thousand nine hundred and ninety-nine (99,999) message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of ninety-nine (99) packs and a minimum of one (1) pack.

  • ODUF Packing Specifications 6.3.1 The data will be packed using ATIS EMI records. A pack will contain a minimum of one (1) message record or a maximum of ninety-nine thousand nine hundred and ninety-nine (99,999) message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of ninety-nine (99) packs and a minimum of one (1) pack.

  • Class Specifications The Human Resources Division shall determine: