Design Criteria A/E shall prepare all work in accordance with the latest version of applicable County’s procedures, specifications, manuals, guidelines, standard drawings, and standard specifications. A/E shall prepare each Plans, Specifications, and Estimates (PS&E) package in a form suitable for letting through County’s construction contract bidding and awarding process.
Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.
Design Criteria and Standards All Projects/Services shall be performed in accordance with instructions, criteria and standards set forth by the Director.
Schematic Design Phase 1.2.1 Based on the mutually agreed upon Program of Requirements, Amount Available for the Construction Contract and the Project Schedule, the Architect/Engineer shall prepare sufficient alternative approaches utilizing BIM for design and construction of the Project to satisfy Owner’s project requirements and shall, at completion of this phase, submit Schematic Design Documents derived from the model in accordance with the BIM Execution Plan, “Facility Design Guidelines” and any additional requirements set forth in Article 15. The Architect/Engineer shall review alternative approaches to design and construction for the Project as they are being modeled at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by the Owner within the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Schematic Design. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.2.2 Architect/Engineer shall provide all services necessary to perform the services of this phase (preparation of model(s), relevant data, decision support model views and Schematic Design Documents) including, without limitation, unless otherwise approved by Owner, the preparation and prompt delivery of all items specified in the BIM Execution Plan and “Facility Design Guidelines”. 1.2.3 Architect/Engineer shall work closely with Owner in preparation of schematic drawings and shall specifically conform to Owner’s requirements regarding aesthetic design issues. 1.2.4 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.2.5 Before proceeding into the Design Development Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Schematic Design documents and approval of the Architect/Engineer’s preliminary Estimated Construction Cost and schedule. 1.2.6 The Architect/Engineer shall participate in a final review of the Schematic Design Documents and model(s) with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. Prior to the Owner’s approval of the Schematic Design Documents, the Architect/Engineer shall incorporate such changes as are necessary to satisfy the Owner’s review comments, any of which may be appealed for good cause.
Maintenance Programme (i) The Contractor shall prepare a monthly maintenance programme (the “Maintenance Programme”) in consultation with the Authority’s Engineer and submit the same to the Authority’s Engineer not later than 10 (ten) days prior to the commencement of the month in which the Maintenance is to be carried out. For this purpose a joint monthly inspection by the Contractor and the Authority’s Engineer shall be undertaken. The Maintenance Programme shall contain the following: (a) The condition of the road in the format prescribed by the Authority’s Engineer; (b) the proposed maintenance Works; and (c) deployment of resources for maintenance Works.
Maintenance Program LESSEE's Maintenance Program
Schematic Design See Section 2, Part 1, Article 2.1.4, Paragraph 2.1.4.2.
Project Design Applicants must design a project that provides access to health services to enable eligible women and men experiencing health needs to secure and maintain safe and accessible quality screening and diagnostic services, comprehensive family planning, and/ or other women’s health services. A. Applicants are encouraged to emphasize the following components in the design of their projects. Projects must: 1. Use a collaborative approach to maximize existing community resources and avoid duplication of effort; 2. Enhance systems and local processes to make it easier for people to transition to, from, and between services; 3. Address barriers to ensure services are accessible to people regardless of setting or location; and 4. Promote improvement and positively impact health and well-being through coordinated service delivery. B. To be effective, services and activities provided or made available as part of the Proposed Project should have policies and procedures in place and include with the application as an attachment that: 1. Delineate the timely provision of services; 2. Deem Client eligibility and service provision as soon as possible and no later than 30 calendar days from initial request; 3. Require staff to assess and prioritize Client needs; 4. Implement with model fidelity to an evidence-based program or based upon best available research; 5. Plan in partnership with the person and are inclusive; 6. Provide in an environment that is most appropriate and based on a person’s preference including reasonable clinic/reception wait times that are not a barrier to care; 7. Provide referral sources for Clients that cannot be served or receive a specific service; 8. Are culturally and linguistically sensitive; 9. Tailor services to a person’s unique strengths and needs; 10. Manage funds to ensure established Clients continuity of care throughout budget year; 11. Continue to provide services to established Clients after allocated funds are expended; 12. Have processes to identify and eliminate possible barriers to care; 13. Do not deny services due to inability to pay; 14. Have appropriate key personnel and required staff to meet the medical and health needs of Clients; 15. Bill services appropriately and timely through TMHP; 16. Effectively communicate and document information related to health care needs with next steps available to Client; 17. Establish outreach and education plan for the community; and 18. Outline successful delivery of direct clinical services to Clients By submitting an Application under this RFA, the Applicant certifies that Applicant has or will have at time of grant award services, policies, or procedures that conform with the requirements in this section as applicable. HHSC, in its sole discretion, may request to review relevant documentation during the project period as necessary to ensure program fidelity.
Design Standards Most recent edition of the “Owner’s Design Standards,” including any partial updates as may be directed by the Owner.
System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades. 5.2.1 As described in Section 32.3.5.3 of the SGIP in Attachment Z of the ISO OATT, the responsibility of the Interconnection Customer for the cost of the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement shall be determined in accordance with Attachment S of the ISO OATT, as required by Section 32.3.5.3.2