Process Capabilities Sample Clauses

Process Capabilities. Wherever required by WABCO in the course of the part approval procedure, statistical evidence of process capability must be made available by Supplier. This applies to characteristics requested by WABCO during part approval process and to Safety and Significant Characteristics. For dimensional Safety <1> Characteristics supplier must provide capability studies or install 100% inspection. In case of capability studies the process need to reach a short-term process capability ≥ (superior or equal to) 2 for at least 50 consecutively produced parts. In series production, Supplier shall give evidence for a long term process capability ≥ (superior or equal to) 1,67. Until the required capabilities are proven, Supplier shall proceed to a 100% Inspection with collection of data to be allocated at least to the production batch (traceability). On request of WABCO during the entire product manufacturing life time, supplier needs to provide long term process capability results. For non dimensional Safety <1> characteristics (e.g. material composition or material properties) an alternative way to process capability studies shall be agreed between WABCO and Supplier (e.g. evidence of capability of used process technology, special process control plan, evidence about process capability through control of process parameter, sample lot definition and related control plan connected to SPC, etc.) In case of capability studies on Significant <2> Characteristics and other characteristics requested by WABCO during part approval procedure the process capability need to reach short-term process capability ≥ (superior or equal to) 1,67 for at least 50 consecutively produced parts. In series production, Supplier shall give evidence for a long term process capability ≥ (superior or equal to) 1,33. Until the required capabilities are proven, Supplier shall proceed to a 100% Inspection with collection of data to be allocated at least to the production batch (traceability). On request of WABCO during the entire product manufacturing life time, supplier needs to provide long term process capability results. Measurement processes used for above mentioned characteristics shall be analysed by Supplier using a Measurement System Analysis (MSA). Supplier shall also ensure that the mandatory setting of the action control limits take into consideration measurement system capability.
AutoNDA by SimpleDocs
Process Capabilities. A successfully completed suitability study of the measuring equipment is a prerequisite for conducting process capability studies. Machine capability index, short term study Cm ≥ 2,00 Cmk ≥ 2,00 sample size n ≥ 50 (n ≥ 100 recommended) (sequential parts) Preliminary process capability (= short term = ST) Xxxxxxx process Cp-ST ≥ 1.67 Cpk-ST ≥1.67 Sample size n ≥ 125 (25 samples with 5 parts each) In contrast to the long-term study, the parts that are to be examined can be taken from the production process directly one after another, unless a sufficient amount of parts is available. Preliminary process performance (= short term = ST), instable process (characteristics with varying mean values) Pp-ST ≥ 2.00 Ppk-ST ≥ 2.00 Sample size n ≥ 125 (25 samples with 5 parts each) In contrast to the long-term study, the parts that are to be examined can be taken from the production process directly one after another, unless a sufficient amount of parts is available. Process capability index Cp ≥ 1,67 Cpk ≥ 1,67 Long term study, stable process Process performance index Pp ≥ 1,67 Ppk ≥ 1,67 Long term study, instable process Cpk / Ppk ≥ 1.67 for S / C and P / C characteristics Cpk / Ppk ≥ 2.0 for C / C characteristics The supplier is obliged to adhere to the above values or higher values. The statistical process control must be carried out for all special characteristics. The supplier has to carry out a capability study based on the PPAP procedure. The capability study must be carried out separately for each cavity. If fewer than the required minimum number of parts are available, this is to be documented and the reduced number is to be taken into account by raising the standard values. The standard values are to be increased by the following amounts: A copy of the detailed results of the capability test must be attached with the sampling documentation.

Related to Process Capabilities

  • Testing Capabilities 7.2.2.10.2.1 LIS Acceptance Testing is provided where equipment is available, with the following test lines: seven-digit access to balance (100 type), milliwatt (102 type), nonsynchronous or synchronous, automatic transmission measuring (105 type), data transmission (107 type), loop-around, short circuit, open circuit, and non-inverting digital loop-back (108 type), and such other acceptance testing that may be needed to ensure that the service is operational and meets the applicable technical parameters. 7.2.2.10.2.2 In addition to LIS acceptance testing, other tests are available (e.g., additional cooperative acceptance testing, automatic scheduled testing, cooperative scheduled testing, manual scheduled testing, and non-scheduled testing). Charges for such testing are identified in Section 7.3.5.

  • Capabilities A. The Parties agree that the DRE must possess the legal, technical, and financial capacity to: (1) Accept and expend non-federal funds consistent with Section 4.2.4; (2) Accept transfer of the FERC license and title for the Facilities from PacifiCorp; (3) Seek and obtain necessary permits and other authorizations to implement Facilities Removal; (4) Enter into appropriate contracts and grant agreements for effectuating Facilities Removal; (5) Perform, directly or by oversight, Facilities Removal; (6) Prevent, mitigate, and respond to damages the DRE or any of its contractors, subcontractors, or assigns cause during the course of Facilities Removal, and, consistent with Applicable Law, respond to and defend associated liability claims against the DRE or any of its contractors, subcontractors, or assigns, including costs thereof and any judgments or awards resulting therefrom; (7) Carry the required insurance and bonding set forth in Appendix L to respond to liability and damages claims associated with Facilities Removal against the DRE or any of its contractors, subcontractors, or assigns; (8) Meet the deadlines set forth in Exhibit 4; and (9) Perform such other tasks as are reasonable and necessary for Facilities Removal. B. Before the DRE and PacifiCorp file the joint application to transfer the license for the Facilities, the DRE will Timely demonstrate to the reasonable satisfaction of the States and PacifiCorp that it possesses the legal, technical, and financial capacity to accomplish the tasks in Sections 7.1.2.A(1) through (5), (8), and (9). PacifiCorp and the States will consult if the DRE fails to make the demonstration required in this subsection. C. Within six months of the DRE’s execution of the Settlement, the DRE will include in an informational filing in the FERC license transfer proceeding proof that it possesses the legal, technical, and financial capacity to accomplish the tasks in Sections 7.1.2.A(6) and (7). This filing will include documentation that the DRE meets the requirements of Parts II, III, and IV of Appendix L and is capable of fulfilling its obligations under Section 7.1.3. The DRE will not provide the filing if either of the States or PacifiCorp objects to the filing after a reasonable opportunity to review before submission to FERC. The six-month deadline may be changed by agreement of the DRE, the States, and PacifiCorp. The Parties will Meet and Confer if the DRE fails to provide the informational filing to FERC.

  • Local Circuit Switching Capability, including Tandem Switching Capability 4.1.3.1 Definition 4.1.3.2 Notwithstanding BellSouth’s general duty to unbundle local circuit switching, BellSouth shall not be required to unbundle local circuit switching for <<customer_name>> when <<customer_name>> serves end-users with four (4) or more voice-grade (DS-0) equivalents or lines in locations served by BellSouth’s local circuit switches, which are in the following MSAs: Atlanta, GA; Miami, FL; Orlando, FL; Ft. Lauderdale, FL; Charlotte-Gastonia-Rock Hill, NC; Greensboro-Winston Salem-High Point, NC; Nashville, TN; and New Orleans, LA, and BellSouth has provided non-discriminatory cost based access to the Enhanced Extended Link (EEL) throughout Density Zone 1 as determined by NECA Tariff No. 4 as in effect on January 1, 1999. 4.1.3.3 In the event that <<customer_name>> orders local circuit switching for a single end user account name at a single physical end user location with four (4) or more 2-wire voice-grade loops from a BellSouth central office in an MSA listed above, BellSouth shall charge <<customer_name>> the market based rate in Exhibit C for use of the local circuit switching functionality for the affected facilities. 4.1.3.4 A featureless port is one that has a line port, switching facilities, and an interoffice port. A featured port is a port that includes all features then capable or a number of then capable features specifically requested by <<customer_name>>. Any features that are not currently then capable but are technically feasible through the switch can be requested through the NBR/BFR process. 4.1.3.5 BellSouth will provide to <<customer_name>> customized routing of calls: (i) to a requested directory assistance services platform; (ii) to an operator services platform pursuant to Section 10 of Attachment 2; (iii) for <<customer_name>>’s PIC’ed toll traffic in a two (2) PIC environment to an alternative OS/DA platform designated by <<customer_name>>. <<customer_name>> customers may use the same dialing arrangements as BellSouth customers. 4.1.3.6 Remote Switching Module functionality is included in Switching Capability. The switching capabilities used will be based on the line side features they support. 4.1.3.7 Switching Capability will also be capable of routing local, intraLATA, interLATA, and calls to international customer’s preferred carrier; call features (e.g. call forwarding) and Centrex capabilities. 4.1.3.8 Where required to do so in order to comply with an effective Commission order, BellSouth will provide to <<customer_name>> purchasing local BellSouth switching and reselling BellSouth local exchange service under Attachment 1, selective routing of calls to a requested directory assistance services platform or operator services platform. <<customer_name>> customers may use the same dialing arrangements as BellSouth customers, but obtain a <<customer_name>> branded service.

  • Subprocessing The data importer shall not subcontract any of its processing operations performed on behalf of the data exporter under the Clauses without the prior written consent of the data exporter. Where the data importer subcontracts its obligations under the Clauses, with the consent of the data exporter, it shall do so only by way of a written agreement with the subprocessor which imposes the same obligations on the subprocessor as are imposed on the data importer under the Clauses. Where the subprocessor fails to fulfil its data protection obligations under such written agreement the data importer shall remain fully liable to the data exporter for the performance of the subprocessor's obligations under such agreement.

  • Interconnection Customer Provided Services The services provided by Interconnection Customer under this LGIA are set forth in Article 9.6 and Article 13.5. 1. Interconnection Customer shall be paid for such services in accordance with Article 11.6.

  • Service Specification The Parties have agreed upon the scope and specification of the Services provided under this Service Agreement in the Service Specification.

  • Scope of Interconnection Service 1.3.1 The NYISO will provide Energy Resource Interconnection Service and Capacity Resource Interconnection Service to Interconnection Customer at the Point of Interconnection. 1.3.2 This Agreement does not constitute an agreement to purchase or deliver the Interconnection Customer’s power. The purchase or delivery of power and other services that the Interconnection Customer may require will be covered under separate agreements, if any, or applicable provisions of NYISO’s or Connecting Transmission Owner’s tariffs. The Interconnection Customer will be responsible for separately making all necessary arrangements (including scheduling) for delivery of electricity in accordance with the applicable provisions of the ISO OATT and Connecting Transmission Owner’s tariff. The execution of this Agreement does not constitute a request for, nor agreement to, provide Energy, any Ancillary Services or Installed Capacity under the NYISO Services Tariff or any Connecting Transmission Owner’s tariff. If Interconnection Customer wishes to supply or purchase Energy, Installed Capacity or Ancillary Services, then Interconnection Customer will make application to do so in accordance with the NYISO Services Tariff or Connecting Transmission Owner’s tariff.

  • FREQUENCY AND CAPACITY LEVELS No restriction on frequency, capacity or aircraft type.

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Interconnection Customer Drawings Within one hundred twenty (120) days after the date of Initial Operation, unless the Interconnection Parties agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Transmission Provider and the Interconnected Transmission Owner final, “as-built” drawings, information and documents regarding the Customer Interconnection Facilities, including, as and to the extent applicable: a one-line diagram, a site plan showing the Customer Facility and the Customer Interconnection Facilities, plan and elevation drawings showing the layout of the Customer Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Customer Facility to the step-up transformers and the Customer Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Customer Facility. As applicable, the Interconnection Customer shall provide Transmission Provider and the Interconnected Transmission Owner specifications for the excitation system, automatic voltage regulator, Customer Facility control and protection settings, transformer tap settings, and communications.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!