Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.
New Member Orientation The Employer will notify the Union of any newly represented temporary employees. The Union will be given the opportunity to have a Union representative speak with the newly represented temporary employees for not more than thirty (30) minutes to provide information about the Union and this Agreement.
Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):
Benefit Level Two Health Care Network Determination Issues regarding the health care networks for the 2017 insurance year shall be negotiated in accordance with the following procedures:
Transfers and Seniority Outside Bargaining Unit No employee shall be transferred to a position outside the bargaining unit without the employee's consent. If an employee is transferred to a position outside of the bargaining unit, the employee shall retain seniority acquired at the date of leaving the unit, but will not accumulate any further seniority. If such an employee later returns to the bargaining unit, the employee shall be placed in a job consistent with the employee's seniority. Such return shall not result in the layoff or bumping of an employee holding greater seniority.
Switching and Tagging Rules Each Party shall provide the other Parties a copy of its switching and tagging rules that are applicable to the other Parties’ activities. Such switching and tagging rules shall be developed on a non-discriminatory basis. The Parties shall comply with applicable switching and tagging rules, as amended from time to time, in obtaining clearances for work or for switching operations on equipment.
Transfer and Seniority Outside Bargaining Unit No employee shall be transferred to a position outside the bargaining unit without his consent. If an employee is transferred to a position outside of the bargaining unit, he shall retain his seniority accumulated up to the date of leaving the unit, but will not accumulate any further seniority. If such an employee returns to the bargaining unit within twelve (12) months, he shall be placed in a job consistent with his seniority. Such return shall not result in the layoff or bumping of an employee holding greater seniority.
Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.
Claim for Preferential Tariff Treatment 1. The importing Party shall require a certificate of origin for an originating good of the exporting Party from importers who claim the preferential tariff treatment for the good.
Minority Vendor Designee The minority vendor designee of the Owner shall be specified in the Supplementary General Conditions or the Instructions to Bidders. For more information, please contact the Board of Regents’ Office of Business Development by e-mail at XxxxxxxxXxxxxxxxxxx@xxx.xxx.