Proposed Build Analysis Sample Clauses

Proposed Build Analysis. Proposed build intersection models (number of intersections shall be dictated by the schematic design) shall be developed using Synchro software for SL 335 for both AM and PM peak periods. Within Synchro, volumes and geometric design shall be updated to represent the schematic design. Controlled access corridor operations within the study area shall be analyzed using Highway Capacity Software (HCS) and will include the basic freeway, ramps – merge & diverge, and weave analysis modules. Future 2025 and 2045 VISSIM models shall be created by modifying the No-Build models developed to analyze and compare the proposed full system interchanges for both AM and PM peak hours. The models will be utilized to evaluate travel time, speed, delay, and queue conditions for each proposed system interchange. The summarized measures of effectiveness shall include travel times, approach delay, intersection delay, and the 95th percentile queue length. Vissim locations include up to three
AutoNDA by SimpleDocs

Related to Proposed Build Analysis

  • Data Analysis In the meeting, the analysis that has led the College President to conclude that a reduction- in-force in the FSA at that College may be necessary will be shared. The analysis will include but is not limited to the following: ● Relationship of the FSA to the mission, vision, values, and strategic plan of the College and district ● External requirement for the services provided by the FSA such as accreditation or intergovernmental agreements ● Annual instructional load (as applicable) ● Percentage of annual instructional load taught by Residential Faculty (as applicable) ● Fall Full-Time Student Equivalent (FFTE) inclusive of dual enrollment ● Number of Residential Faculty teaching/working in the FSA ● Number of Residential Faculty whose primary FSA is the FSA being analyzed ● Revenue trends over five years for the FSA including but not limited to tuition and fees ● Expenditure trends over five years for the FSA including but not limited to personnel and capital ● Account balances for any fees accounts within the FSA ● Cost/benefit analysis of reducing all non-Residential Faculty plus one Residential Faculty within the FSA ● An explanation of the problem that reducing the number of faculty in the FSA would solve ● The list of potential Residential Faculty that are at risk of layoff as determined by the Vice Chancellor of Human Resources ● Other relevant information, as requested

  • Statistical Analysis 31 F-tests and t-tests will be used to analyze OV and Quality Acceptance data. The F-test is a 32 comparison of variances to determine if the OV and Quality Acceptance population variances 33 are equal. The t-test is a comparison of means to determine if the OV and Quality Acceptance 34 population means are equal. In addition to these two types of analyses, independent verification 35 and observation verification will also be used to validate the Quality Acceptance test results.

  • DATA COLLECTION AND ANALYSIS The goal of this task is to collect operational data from the project, to analyze that data for economic and environmental impacts, and to include the data and analysis in the Final Report. Formulas will be provided for calculations. A Final Report data collection template will be provided by the Energy Commission. The Recipient shall: • Develop data collection test plan. • Troubleshoot any issues identified. • Collect data, information, and analysis and develop a Final Report which includes: o Total gross project costs. o Length of time from award of bus(es) to project completion. o Fuel usage before and after the project.

  • Feasibility Study Buyer will, at Buyer's expense and within ____ days from Effective Date ("Feasibility Study Period"), determine whether the Property is suitable, in Buyer's sole and absolute discretion, for ___________________ use. During the Feasibility Study Period, Buyer may conduct a Phase I environmental assessment and any other tests, analyses, surveys and investigations ("Inspections") that Buyer deems necessary to determine to Buyer's satisfaction the Property's engineering, architectural and environmental properties; zoning and zoning restrictions; subdivision statutes; soil and grade; availability of access public roads, water, and other utilities; consistency with local, state and regional growth management plans, availability of permits, government approvals, and licenses; and other inspections that Buyer deems appropriate to determine the Property's suitability for the Buyer's intended use. If the Property must be rezoned, Buyer will obtain the rezoning from the appropriatx xxxernment agencies. Seller will sign all documents Buyer is required to file in connection with development or rezoning approvals. Seller gives Buyer, its agents, contractors and assigns, the right to enter the Property at any time during the Feasibility Study Period for the purpose of conducting inspections; provided, however, that Buyer, its agents, contractors and assigns enter the Property and conduct inspections at their own risk. Buyer will indemnify and hold Seller harmless from xxxxes, damages, costs, claims and expenses of any nature, including attorney's fees, expenses and liability incurred in application for rezoning or related proceedings, and from liability to any person, arising from the conduct of any and all inspections of any work authorized by Buyer. Buyer will not engage in any activity that xxxxx result in a construction lien being filed against the Property without Seller's prior written consent. If this transaction does not close, Buyer will, at Buyer's expense, (1) repair all damages to the Property resulting from the Inspections and return the Property to the condition it was in prior to conduct of the Inspections, and (2) release to Seller all reports and other work generated as a result of the Inspections. Buyer will deliver written notice to Seller prior to the expiration of the Feasibility Study Period of Buyer's determination of whether or not the Properxx xx acceptable. Buyer's failure to comply with this notice requirement will constitute acceptance of the Property as suitable for Buyer's intended use in its "as is" condition. If the Property is unacceptable to Buyer and written notice of this fact is timely delivered to Seller, this Contract will be deemed terminated as of the day after the Feasibility Study period ends and Buyer's deposit(s) will be returned after Escrow Axxxx receives proper authorization form all interested parties.

  • Drug Test Results 1. All records pertaining to department-required drug tests shall remain confidential, and shall not be provided to other employers or agencies without the written permission of the person whose records are sought. However, medical, administrative, and immediate supervisory personnel may have access to relevant portions of the records as necessary to insure the acceptable performance of the officer's job duties.

  • Project Completion Report At the completion of construction and once a Project is placed in service, the Subrecipient must submit a Project Completion Report that includes the total number of units built and leased, affordable units built and leased, DR-MHP units built and leased, an accomplishment narrative, and the tenants names, demographics and income for each DR-MHP unit.

  • Conformity Assessment 1. The Parties recognize that a broad range of mechanisms exists to facilitate the acceptance of conformity assessment procedures and results thereby, including:

  • COMPENSATION ANALYSIS After the expiration of the second (2nd) Renewal Term of this Agreement, if any, a Compensation Analysis may be performed. At such time, based on the reported Total Gross Revenue, performance of the Concession, and/or Department’s existing rates for similarly- performing operations, Department may choose to increase the Concession Payment for the following Renewal Term(s), if any.

  • Risk Assessment An assessment of any risks inherent in the work requirements and actions to mitigate these risks.

  • Project Summary The main objective of the LIFE GAIA Sense project is to demonstrate Gaiasense, an innovative “Smart Farming” (SF) solution that aims at reducing the consumption of natural resources, as a way to protect the environment and support Circular Economy (CE) models. More specifically, this project will launch 18 demonstrators across Greece, Spain and Portugal covering 9 crops (olives, peaches, cotton, pistachio, potatoes, table tomatoes, industrial tomatoes, grapes, kiwi) in various terrain and microclimatic conditions. They will demonstrate an innovative method, based on high-end technology, which is suitable for being replicated and will be accessible and affordable to Farmers either as individuals or collectively through Agricultural Cooperatives. Moreover, LIFE GAIA Sense aims to promote resource efficiency practices in SMEs of the agricultural sector and eventually, contribute to the implementation of the Roadmap to a Resource Efficient Europe. This project will demonstrate a method on how the farmer will be able to decide either to use or avoid inputs (irrigation, fertilizers, pesticides etc.) in a most efficient way, without risking the annual production. The focus is on the resource consumption reduction side of CE, and the results will be both qualitatively and quantitatively, considering the resources’ efficiency in agricultural sector.

Time is Money Join Law Insider Premium to draft better contracts faster.