RCI/SLD Production Associated with FDOT Construction Completion Notification Sample Clauses

RCI/SLD Production Associated with FDOT Construction Completion Notification. The CONSULTANT may be requested to conduct a detailed review of roadway construction plans and field verifications. Each set of plans shall be reviewed to determine all changes needed for RCI update. All work shall be completed according to the most current FDOT General Interest Roadway Data procedure (currently, Procedure No. 525-020-310-j, 3/23/2016), the FDOT RCI Features and Characteristics Handbook (August 2016 or later), the FDOT RCI Planning Data Handbook (August 2016 or later), and the Federal Highway Administration (FHWA) Highway Performance Monitoring System Field Manual (December 2016 or later). All changes noted from the review shall be made to the RCI database by the CONSULTANT. Edits shall be run until they return error free. Once edits are free from error, the CONSULTANT shall, at the direction of the DEPARTMENT’s Project Manager, submit a Straight Line Diagram (SLD) for each roadway having had a construction plan review. The DEPARTMENT’s Project Manager shall approve all SLDs before final submittal.
AutoNDA by SimpleDocs
RCI/SLD Production Associated with FDOT Construction Completion Notification. The CONSULTANT may be requested to conduct a detailed review of roadway construction plans. Each set of plans shall be reviewed to determine all changes needed for RCI updates. All work shall be completed according to the most up to date FDOT General Interest Roadway Data procedure (Topic No. 525-020-310), the most recent edition of the FDOT RCI Features and Characteristics Handbook and the RCI Planning Data Handbook. All changes noted from the review shall be made to the RCI database by the CONSULTANT. Edits shall be run until error free. Once edits are free from error, the CONSULTANT shall, at the direction of the DEPARTMENT’s Project Manager, submit a Straight-Line Diagram (SLD) for each roadway having had a construction plan review. The DEPARTMENT’s Project Manager shall approve all SLDs before final submittal.

Related to RCI/SLD Production Associated with FDOT Construction Completion Notification

  • Construction Completion The related Construction shall have been completed substantially in accordance with the related Plans and Specifications, the related Deed and all Applicable Laws, and such Leased Property shall be ready for occupancy and operation. All fixtures, equipment and other property contemplated under the Plans and Specifications to be incorporated into or installed in such Leased Property shall have been substantially incorporated or installed, free and clear of all Liens except for Permitted Liens.

  • Project Completion Part 1 – Material Completion

  • Project Completion Date It is agreed between the Parties that the Project Completion Date is <END DATE, YEAR>. If the Project is not completed by such date then, subject to an amendment agreed to between the Parties, Alberta Innovates may elect to terminate this Investment Agreement. In such event, Alberta Innovates will notify the Applicant of its decision to terminate as soon as reasonably practical and shall advise the Applicant of the effective date of termination. Alberta Innovates will have no liability or obligation to reimburse the Applicant for any Project Costs incurred after the effective date of termination and may require the Applicant to return any portions of the Investment which were spent on Ineligible Expenses. Additionally, any portion of the Investment not used and accounted for in accordance with this Agreement as of the Project Completion Date or earlier termination is repayable by the Applicant to AI at AI’s request.

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • ROAD WORK PHASE APPROVAL Purchaser shall obtain written approval from the Contract Administrator upon completion of each of the following phases of road work:  Drainage installation  Subgrade compaction  Rock compaction SUBSECTION RESTRICTIONS

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

  • At Substantial Completion and Final Completion the Contractor shall provide a certification letter certifying that the Work does not contain asbestos as required by the UTUGCs.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Project Completion Report At the completion of construction and once a Project is placed in service, the Subrecipient must submit a Project Completion Report that includes the total number of units built and leased, affordable units built and leased, DR-MHP units built and leased, an accomplishment narrative, and the tenants names, demographics and income for each DR-MHP unit.