Record Formats Sample Clauses

Record Formats. A school must keep its Campus-Based program records in one of the following formats: • Original signed promissory notes and signed repayment schedules for Xxxxxxx Loans, National Direct Student Loans, or National Defense Student Loans must be kept in a locked fireproof container until the loan is repaid or until the school needs the originals to enforce collection of the loan. If a loan is assigned to the Department, the school must send the original promissory note or a certified copy of the note, as well as a copy of the original deferment or cancella- tion form(s). The school may not send computer-generated form(s) or microform(s). • A school may keep other required records in hard copy or in microform, computer file, optical disk, CD-ROM, or other media formats, but all record information must be retrievable in a coherent hard copy format or in other media formats acceptable to the Department except that
AutoNDA by SimpleDocs
Record Formats. 1. Record

Related to Record Formats

  • PAYEE DATA RECORD FORM STD 204: This form must be completed by all contractors that are not another state agency or other governmental entity.

  • Reporting of Metered Data and Parameters 7.2.1 The grid connected Solar PV power plants will install necessary equipment for regular monitoring of solar irradiance (including GHI, DHI and solar radiation in the module plane), ambient air temperature, wind speed and other weather parameters and simultaneously for monitoring of the electric power (both DC and AC) generated from the Project.

  • Contents of Personnel File A. Adverse statements prepared by the County shall not be included in an employee's official personnel file unless a copy is provided to the employee.

  • Codebook Format The codebook describes an ASCII data set (although the data are also being provided in a SAS transport file). The following codebook items are provided for each variable: Identifier Description Name Variable name (maximum of 8 characters) Description Variable descriptor (maximum 40 characters) Format Number of bytes Type Type of data: numeric (indicated by NUM) or character (indicated by XXXX) Start Beginning column position of variable in record End Ending column position of variable in record

  • COVID-19 Protocols Contractor will abide by all applicable COVID-19 protocols set forth in the District’s Reopening and COVID-19 Mitigation Plan and the safety guidelines for COVID-19 prevention established by the California Department of Public Health and the Ventura County Department of Public Health.

  • Certification Regarding Entire TIPS Agreement for Part 1 and Part 2 Contracts 5 This is a two part solicitation. Part 1 is solicited for TIPS sales that are not considered a "public work" construction project. Part 1 permits the sale of goods and non-construction/non-"public work" services such as maintenance and minor repairs. Part 2 Job Order Contract (JOC) is solicited for projects considered by your TIPS Member Customers to be a "public work" construction project. The determination of whether or not a TIPS sale amounts to a "public work" construction project requiring a Part 2 JOC contract is made by the TIPS Member Customer at the time of each TIPS sale. Thus, Vendors are encouraged to respond to both Parts 1 and 2 in case your TIPS Member Customers require that a sale be made under one Part or the other. However, responding to both Parts is not required. If Vendor responds and is awarded to both Parts, Vendor will have one contract for Part 1 and a separate contract for Part 2.

  • Maintenance Manual No later than 60 (sixty) days prior to the Project Completion Date, the Contractor shall, in consultation with the Authority’s Engineer, evolve a maintenance manual (the “Maintenance Manual”) for the regular and preventive maintenance of the Project Highway in conformity with the Specifications and Standards, safety requirements and Good Industry Practice, and shall provide 5 (five) copies thereof to the Authority’s Engineer. The Authority’s Engineer shall review the Maintenance Manual within 15 (fifteen) days of its receipt and communicate its comments to the Contractor for necessary modifications, if any.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!