Reduced Open Work Area and Increased Open Space and Public Accessway Sample Clauses

Reduced Open Work Area and Increased Open Space and Public Accessway. The AGREEMENT provides that GHCA shall install a 7,400 square foot open work area for boat maintenance and repair activities. AGREEMENT, Paragraphs I.B.20. and III.F.3.b.(1). However, GHCA’s current plans for the Marine Service Center have eliminated boat bottom jobs and boat repair work involving the potential for generating hazardous waste. Instead, GHCA now plans to focus on small boat building and wood working that would not involve the use of hazardous materials. As a result, the Boat Works would be located partly inside the Marine Service Building and partly in an adjacent outside open work area of 1,075 square feet. In addition, the Maine Service Building would be shifted south (i.e., toward Napa Street) approximately 10 feet (as shown on Amended Exhibit E-2, attached hereto) to create space for the open work area on the north (i.e., Mono Street) side of the building. These modifications will eliminate the need for an open work area on the south side of the building consisting of 7,400 square feet of asphalt paving surrounded by a cyclone fence, and allows maintenance of an additional approximately 4,991 square-feet of grassy open space on the south side of the building. GHCA also proposes to modify two approved public access features and to add a new one. The previous plan for a publicly accessible breezeway running east-west through the Marine Service Building would be replaced by a new exterior public accessway (of approximately 725 square feet) with a parallel alignment along the south side of the building, connecting to the north to the existing shoreline accessway. On the east (i.e., shoreline) side of the building, GHCA proposes to create an at-grade public viewing and resting area (of approximately 1,360 square feet) with two benches. This would replace a previously planned viewing deck that became infeasible after the elevation was raised by capping of the shoreline to contain contamination. The total area of these two replacement features –2,085 square feet – is approximately the same as the access features GHCA proposes to replace. On the west (i.e., parking lot) side of the building, GHCA proposes a new accessway that will connect the south-side accessway with the existing shoreline path in the area of the Mono Street Xxxxx, providing for public access on all sides of the building. See Amended Exhibit E-2, attached hereto. This new path would add approximately 720 square feet of public access. The approximately 4,991 square-feet of grass...
AutoNDA by SimpleDocs

Related to Reduced Open Work Area and Increased Open Space and Public Accessway

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • TIME OF COMMENCEMENT AND SUBSTANTIAL COMPLETION (i) The work under this Contract shall commence within seven (7) calendar days of receipt of Notice to Proceed and will be substantially complete within thirty (80) calendar days after the date when the Contract Time commences to run as provided in paragraph 2.03 of the General Conditions and completed and ready for final payment within ninety (90) calendar days after the date when the Contract Time commences to run.

  • TIME OF COMMENCEMENT AND COMPLETION 2.1 The Contractor shall commence the Work upon the date established in the Notice to Proceed.

  • DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § 3.1 The date of commencement of the Work shall be: (Check one of the following boxes.) [ « » ] The date of this Agreement. [ « » ] A date set forth in a notice to proceed issued by the Owner. [ « » ] Established as follows: (Insert a date or a means to determine the date of commencement of the Work.) « » If a date of commencement of the Work is not selected, then the date of commencement shall be the date of this Agreement.

  • Union Activity on Premises and/or Access to Premises The Union agrees that neither it, nor its officers, agents, representatives and members will engage in the solicitation of members, holding of meetings or any other Union activities on Hospital premises or on Hospital time without the prior approval of the Hospital, except as specifically provided for in this Agreement. Such approval will not be unreasonably denied.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When EZ Phone or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port.

  • Construction Phase Fee Contractor’s Construction Phase Fee is the maximum amount payable to Contractor for any cost or profit expectation incurred in the performance of the Work that is not specifically identified as being eligible for reimbursement by Owner elsewhere in this Agreement. References in the UGSC to Contractor’s “overhead” and “profit” mean Contractor’s Construction Phase Fee. The Construction Phase Fee includes, but is not limited to, the following items:

  • Annual Work Plans and Budgets The Recipient shall furnish to the Association as soon as available, but in any case not later than September 1 of each year, the annual work plan and budget for the Project for each subsequent year of Project implementation, of such scope and detail as the Association shall have reasonably requested, except for the annual work plan and budget for the Project for the first year of Project implementation, which shall be furnished no later than one (1) month after the Effective Date.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!