Reference conditions Sample Clauses

Reference conditions. 3.05 Scope of reference conditions: Surface water type-specific
AutoNDA by SimpleDocs
Reference conditions. ‌ The first step to build a fish-based index is the agreement on reference conditions (RC). Following the Guidance: “High status or Reference Conditions should reflect a state in the present or in the past corresponding to very low pressure, without the effects of major industrialisation, urbanisation and intensification of agriculture, and with only very minor modification of physico-chemistry, hydromorphology and biology». They could be determined from existing sites, from models, from paleolimnological reconstructions, from expert judgement or from some combination of these (WFD; 2000/60/EC). In this study, reference conditions were obtained from two different ways: - Reference sites (88 natural lakes) identified during the intercalibration process, with general reference thresholds established on the level of anthropogenic pressure and proved by expert judgement (depending on their relevance for the lake ecosystem), and - Hindasting approach where reference conditions are set to establish a “natural trophic state” by modelling. Approach based on reference sites During the intercalibration process, a set of reference criteria and thresholds with no or minor human impact on the environment was performed (Table.6). A total of 88 sites appeared, distributed among member state as following (table 7). Once the reference model build (on reference sites), it is applied on all sites (reference+ disturbed) to get the reference conditions (Figure.5a), i.e. values that disturbed sites should get if they were in reference. Table.6 List of criteria and reference conditions established in Ranco by all member states in Europe. Criteria Thresholds Eutrophication % land use « natural » >80% or class 1 (Rejection threshold = 70%) Population density 10 hab.km-2 or class 1 (Rejection threshold at 30hab/km²) Ptot (µg/l) 20 (Rejection threshold at 50µg/l) Acidification pH > 6 & if <6 : expert jugement Hydromorphology Impoundment upstream Expert judgment Loss of connectivity downstream Expert judgment Water level fluctuation Expert judgment Shoreline Bank modification Expert judgment Activity on the lake Urbans/industrials discharge Expert judgment Stocking Expert judgment Biological or chemical manipulation Expert judgment Fishing activities Expert judgment Others activities Expert judgment Table.7 Number of reference lakes among the 419 lakes of the dataset. MS Reference IC Estonia 6 Finland 27 Ireland 1 Sweden 38 France 5 Germany 11 This method was truly criticized because...

Related to Reference conditions

  • Space Conditions All pipes passing through floors, walls, and ceilings shall be installed with sufficient space between them to permit installation of pipe insulation and floor, wall, and ceiling plates without cutting of insulation or plates. Roughed-in dimensions shall be prepared by the Contractor to accomplish this requirement. The Contractor shall locate all equipment that must be serviced, operated, or maintained in fully accessible positions. This provision includes but is not limited to valves, traps, cleanouts, motors, controllers, switchgear, drain points, filter, access doors, and fire dampers. If spaces, dimensions, or other design conditions do not permit compliance with the present article, the Contractor shall file a request in writing with the Design Professional for additional instructions, furnishing a copy to the Owner.

  • Safe Conditions Whenever an employee reports a condition which the employee feels represents a violation of safety or health rules and regulations or which is an unreasonable hazard to persons or property, such conditions shall be promptly investigated. The appropriate administrator shall reply to the concern, in writing, if the employee's concern is communicated in writing.

  • Service Conditions Customer acknowledges that in the event of a service issue, Customer is responsible for on-site cooperative testing with LightEdge Technical Support to assist in the diagnosis of the trouble. Customer agrees to be bound to current terms of LightEdge Acceptable Use Policy. Terms of the Acceptable Use Policy are subject to change without notice. Current Acceptable Use Policy can be found here: xxxx://xxx.xxxxxxxxx.xxx/legal Customer agrees that any service complaints including concerns regarding level of support, products, service reliability, or any other concerns related to LightEdge or Services being provided by LIghtEdge will be communicated to LightEdge by sending an email to xx@xxxxxxxxx.xxx.

  • Unsafe Conditions In accordance with 29 CFR § 1977, occasions might arise when an employee is confronted with a choice between not performing assigned tasks or subjecting himself/herself to serious injury or death arising from a hazardous condition at the workplace. If the employee, with no reasonable alternative, refuses in good faith to expose himself/herself to the dangerous condition, he/she would be protected against subsequent discrimination. The condition causing the employee's apprehension of death or injury must be of such a nature that a reasonable person, under the circumstances then confronting the employee, would conclude that there is a real danger of death or serious injury and that there is insufficient time, due to the urgency of the situation, to eliminate the danger by resorting to regular statutory enforcement channels. In addition, in such circumstances, the employee, where possible, must also have sought from his Employer, and been unable to obtain, a correction of the dangerous condition.

  • Contract Conditions This section contains conditions which shall be complied with during the performance of this contract. The conditions come in two parts, general conditions and special contract requirements.

  • PAYMENT CONDITIONS The price of the whole accommodation service booked is always payable by the Guest in advance, at the latest upon arrival in the hotel. Set-off by the Guest is excluded unless the set- off relates to an undisputed or legally confirmed claim. Valid means of payment are cash in Euros, EC card, Master Card, Visa Card, Diners Card and American Express. For payment settlement we use the 3D Secure 2.0 system for secure and additional customer authorisation. For further information on data processing for payment transactions see xxxxx://xxx.xxxxx-xxx.xxx/en/data-privacy/.

  • Site Conditions A. Existing Site Conditions: Information with respect to the site of the Work given in drawings or specifications has been obtained by County's representatives and is believed to be reasonably correct, but the County does not warrant either the completeness or accuracy of such information, and it is the responsibility of the Contractor to verify all such information.

  • PROJECT CONDITIONS A. The Grantee agrees to the following Project Conditions:

  • Test conditions 6.1.1. The test shall be performed on a flat, dry concrete or asphalt surface affording good adhesion.

  • Release Conditions As used in this Agreement, "Release Conditions" shall mean the following:

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!