Restaking Sample Clauses

Restaking. Stakes or reference marks will be set one time only. Any restaking, for whatever reason, will be performed only when you request it in writing, and will be done at your expense. If any construction stakes or reference points are disturbed, removed, or destroyed, you will be liable for the cost of replacement and the cost will be deducted from your payments. Notify the Engineer at least 48 hours in advance of the date when restaking is required. Staking costs are $300 per hour for a two man staking crew during regular working hours and $450 per hour for a two man staking crew if staking is done outside of normal work hours plus mileage to and from the site, to replace damaged or destroyed stakes. A minimum of 3 hours for the two man staking crew will be charged per visit. Prevailing wages also apply.
AutoNDA by SimpleDocs
Restaking. In the event that Consultant’s staking is destroyed, damaged or disturbed by an act of God or parties other than Consultant, the cost of restaking shall be paid for by Client as Additional Services.
Restaking. (a) Rover shall not abandon or surrender, or allow to lapse or expire, the Property, or any part thereof, for the purpose of permitting an Affiliate of Rover to restake or otherwise acquire any portion of the Property. In the event that Rover or an Affiliate of Rover restakes or otherwise acquires any abandoned or expired part of the Property within a period of two (2) years from the date such Property were abandoned or allowed to lapse or expire, this Agreement shall include such restaked or reacquired part of the Property and shall, if terminated pursuant to Section 5.1, be reinstated.

Related to Restaking

  • Maintenance – Line Splitting 3.6.1 BellSouth will be responsible for repairing voice troubles and the troubles with the physical loop between the NID at the End User’s premises and the termination point.

  • CONSTRUCTION AND RENOVATION Construction of academic or residential buildings on the UC Berkeley campus may be scheduled for the term of this Lease in the vicinity of the apartments. Capital improvement and other major housing construction or repair projects will necessarily cause increased noise and dust in affected and nearby residences at certain times. There is the possibility of both planned and unplanned utility shutdowns and access to certain facilities, streets, parking lots, walking, and bike pathways may be limited, rerouted, or completely restricted. The University will work with building contractors to make every effort to minimize construction inconveniences. By agreeing to this Lease Agreement, the Resident acknowledges notice of the possibility of scheduled construction and access limitations, and acknowledges that there will be disturbances, disruptions, and inconveniences resulting from such constructions and has agreed to such. The Resident also acknowledges that increased noise, dust, potential reassignment, or loss of parking spaces related to construction or renovation are not grounds for cancellation or termination of this Lease.

  • Modification of the Small Generating Facility The Interconnection Customer must receive written authorization from the NYISO and Connecting Transmission Owner before making any change to the Small Generating Facility that may have a material impact on the safety or reliability of the New York State Transmission System or the Distribution System. Such authorization shall not be unreasonably withheld. Modifications shall be done in accordance with Good Utility Practice. If the Interconnection Customer makes such modification without the prior written authorization of the NYISO and Connecting Transmission Owner, the Connecting Transmission Owner shall have the right to temporarily disconnect the Small Generating Facility. If disconnected, the Small Generating Facility will not be reconnected until the unauthorized modifications are authorized or removed.

  • Reconstruction In the event the Premises are damaged by fire or other perils covered by extended coverage insurance, Landlord agrees to forthwith repair same, and this Lease shall remain in full force and effect, except that Tenant shall be entitled to a proportionate reduction of the Rent from the date of damage while such repairs are being made, such proportionate reduction to be based upon the extent to which the damage and making of such repairs shall reasonably interfere with the business carried on by the Tenant in the Premises. If the damage is due to the fault or neglect of Tenant or its employees, there shall be no abatement of Rent. In the event the Premises are damaged as a result of any cause other than the perils covered by fire and extended coverage insurance, then Landlord shall forthwith repair the same, provided the extent of the destruction be less than fifty percent (50%) of the then full replacement cost of the Premises. In the event the destruction of the Premises is to fifty percent (50%) or more of the full replacement cost, then Landlord shall have the option; (1) to repair or restore such damage, this Lease continuing in full force and effect, but the Rent to be proportionately reduced as herein above in this Section provided; or (2) give notice to Tenant at any time within sixty (60) days after such damage, terminating this Lease as of the date specified in such notice, which date shall be no more than thirty (30) days after the giving of such notice. In the event of giving such notice, this Lease shall expire and all interest of the Tenant in the Premises shall terminate on the date so specified in such notice and the Rent, reduced by a proportionate reduction, based upon the extent, if any, to which such damage interfered with the business carried on by the Tenant in the Premises, shall be paid up to date of said such termination. Notwithstanding anything to the contrary contained in this Section, Landlord shall not have any obligation whatsoever to repair, reconstruct or restore the Premises when the damage resulting from any casualty covered under this Section occurs during the last six (6) months of the Term of this Lease or any extension thereof.

  • Construction Staking Contractor shall avoid careless or negligent damage to construction stakes, flags, or marks. If such damage occurs, Contractor shall be required to replace stakes necessary to construc- tion. Contractor’s replacement staking shall be approved by Forest Service. Alternatively, upon Contractor’s request, Contracting Officer may agree to perform such work under E.2.1.8. When A.7 shows that construction stakes are to be set by Forest Service after clearing, Contractor shall submit to Forest Service a written schedule for clearing, construction staking, and construction that will provide Forest Service a reasonable period for setting construction stakes. Time for setting construction stakes may be modified by written agreement. If Forest Service performs construction staking for Specified Roads, timing of such staking shall permit Contrac- tor’s clearing and other construction activity to proceed without hindrance or delay, provided Contractor’s construction activity is reasonably consistent with needs identified in Contractor’s Operating Schedule or amendments thereto. Should Forest Service be unable to perform construction staking in such reasonable period, upon written agree- ment, Contractor shall assume the responsibility for construction staking for agreed upon portions of Specified Roads. In such event, Contracting Officer shall revise:

  • Maintenance and Repair – Line Sharing 3.6.1 C.M. shall have access for repair and maintenance purposes to any Loop for which it has access to the High Frequency Spectrum. If C.M. is using a BellSouth owned splitter, C.M. may access the Loop at the point where the combined voice and data signal exits the central office splitter via a bantam test jack. If C.M. provides its own splitter, it may test from the collocation space or the Termination Point.

  • Demolition The Lessor shall remove existing abandoned electric, telephone, and data cabling and devices, as well as any other improvements or fixtures in place, to accommodate the Government’s requirements. Any demolition of existing improvements that is necessary to satisfy the Government’s layout shall be done at the Lessor’s expense.

  • Construction Sequencing In general, the sequence of the proposed dates of Initial Operation of Interconnection Customers seeking interconnection to the Transmission System will determine the sequence of construction of Network Upgrades.

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When EZ Phone or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port.

  • Disappearance We will pay for loss of life, as shown in the Table of Loss, if Your body cannot be located within three hundred sixty-five (365) days after a disappearance due to an Accident during Your Trip. We have the right to recover the benefit if We find that You survived the event. Exposure and/or Disappearance Benefits are supplemental to benefits provided under Accidental Death and Dismemberment and Your Accidental Death and Dismemberment coverage may not exceed the Maximum Benefit Amount shown in the Schedule of Benefits.

Time is Money Join Law Insider Premium to draft better contracts faster.