Reworks and Redrills Sample Clauses

Reworks and Redrills. Prior to that point in time when CIG does --------------------- not take delivery of at least two (2) BCF of gas for the immediately preceding, twelve (12) month period pursuant to the terms and conditions of the "B" Contract, as amended, either party hereto may at any time and from time to time, propose to Rework or otherwise repair, to deepen or Side Track into a zone or formation the depth of which is above mean sea level, to Acidize, to "Frac" or otherwise stimulate, or to plug back any dry hole or existing well on the Contract Area, or to drill a Replacement Well by giving the other party written notice of the proposed operation specifying the work to be performed, the location, proposed depth of completion and the objective formation. In the event a proposal is made as described herein, it is stipulated that neither party shall have any right not to participate in such proposal. Subsequent to that point in time when CIG does not take delivery of at least two (2) BCF of gas for the immediately preceding twelve (12) month period pursuant to the terms and conditions of the "B" Contract, as amended, and for all periods subsequent thereto, CIG shall no longer have the right to submit any further proposals and/or AFE's to Mesa. Notwithstanding the above provisions, CIG and Mesa stipulate and agree that nothing herein contained shall in any way modify, change or otherwise diminish CIG's right to take delivery of gas pursuant to the "B" Contract, as amended. 6.1.1 If Mesa makes any such proposal, it shall accompany the proposal with an AFE specifying the work to be performed and the estimated cost of the operation. If the proposal is made by CIG, Mesa shall have thirty (30) days in which to prepare and submit such an AFE to CIG. Provided, however, that in either event, if drilling or reworking equipment is on location, CIG may waive preparation of an AFE and request that the operation commence immediately. CIG reserves the right to contest the reasonableness and amount of costs incurred in any such project, notwithstanding the receipt and acceptance of an AFE and completion of the project. 6.1.2 Mesa shall, within ninety (90) days after work is proposed, actually commence the proposed operation and complete it with due diligence at the cost and expense of CIG, as a Capital Expenditure as set forth in the accounting procedure attached as Exhibit "C". If Mesa has not commenced the actual operation within the time provided and further fails to do so within thir...
AutoNDA by SimpleDocs

Related to Reworks and Redrills

  • Capital Equipment Collaborator’s commitment, if any, to provide ICD with capital equipment to enable the research and development activities under the Research Plan appears in Appendix B. If Collaborator transfers to ICD the capital equipment or provides funds for ICD to purchase it, then ICD will own the equipment. If Collaborator loans capital equipment to ICD for use during the CRADA, Collaborator will be responsible for paying all costs and fees associated with the transport, installation, maintenance, repair, removal, or disposal of the equipment, and ICD will not be liable for any damage to the equipment.

  • Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.

  • Additional Equipment Additional Equipment may from time to time be added as the subject matter of this Agreement as agreed on by the parties. Any additional property will be added in an amendment describing the property, the monthly rental, security deposit, and stipulated loss value of the additional Equipment. All amendments must be in writing and signed by both parties. Other than by this amendment procedure, this Agreement may not be amended, modified, or altered in any manner except in writing signed by both parties.

  • Transporting Students 1. Employees shall not transport students except in accordance with School Board rules. The Board shall adopt a school board policy outlining the teacher’s and the Board’s responsibilities and liabilities. Said policy shall be included in all school handbooks beginning with the 2004-05 school year. 2. Teachers will not be required to transport pupils to and from activities which take place away from the school grounds.

  • Alpine Areas As of 1 October 2020 the Employer shall pay an Alpine disability allowance of $3.85 worked on Projects in alpine areas. These allowances will be adjusted annually in accordance with CPI (All Groups, Melbourne) movements measured in the twelve month period ending the previous December quarter effective as of 1 March 2021, rounded to the nearest 5 cents.

  • Management and Control Systems Grantee will: 1. maintain an appropriate contract administration system to ensure that all terms, conditions, and specifications are met during the term of the contract through the completion of the closeout procedures. 2. develop, implement, and maintain financial management and control systems that meet or exceed the requirements of Uniform Statewide Accounting System (UGMS). Those requirements and procedures include, at a minimum, the following: i. Financial planning, including the development of budgets that adequately reflect all functions and resources necessary to carry out authorized activities and the adequate determination of costs; ii. Financial management systems that include accurate accounting records that are accessible and identify the source and application of funds provided under each Contract of this Contract, and original source documentation substantiating that costs are specifically and solely allocable to a Contract and its Contract and are traceable from the transaction to the general ledger; iii. Effective internal and budgetary controls; iv. Comparison of actual costs to budget; determination of reasonableness, allowableness, and allocability of costs; v. Timely and appropriate audits and resolution of any findings; vi. Billing and collection policies; and vii. Mechanism capable of billing and making reasonable efforts to collect from clients and third parties.

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)

  • Infrastructure Infrastructure serves as the foundation and building blocks of an integrated IT solution. It is the hardware which supports Application Services (C.3.2) and IT Management Services (C.3.3); the software and services which enable that hardware to function; and the hardware, software, and services which allow for secure communication and interoperability between all business and application service components. Infrastructure services facilitate the development and maintenance of critical IT infrastructures required to support Federal government business operations. This section includes the technical framework components that make up integrated IT solutions. One or any combination of these components may be used to deliver IT solutions intended to perform a wide array of functions which allow agencies to deliver services to their customers (or users), whether internal or external, in an efficient and effective manner. Infrastructure includes hardware, software, licensing, technical support, and warranty services from third party sources, as well as technological refreshment and enhancements for that hardware and software. This section is aligned with the FEA/DoDEA Technical Reference Model (TRM) which describes these components using a vocabulary that is common throughout the entire Federal government. A detailed review of the TRM is provided in Section J, Attachment 5. Infrastructure includes complete life cycle support for all hardware, software, and services represented above, including planning, analysis, research and development, design, development, integration and testing, implementation, operations and maintenance, information assurance, and final disposition of these components. The services also include administration and help desk functions necessary to support the IT infrastructure (e.g., desktop support, network administration). Infrastructure components of an integrated IT solution can be categorized as follows:

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.