Rotary Table Sample Clauses

Rotary Table. ● Prepare to remove the top cover to inspect the rotary table, drive systems and gear box. ● Prepare to remove the master bushing for inspection. ● Provide the following documents: - Major overhaul reports. - NDT inspection reports.
AutoNDA by SimpleDocs
Rotary Table. Make/Type Main NOV VBJ RST 755 Maximum opening 75-1/2 Inches Rated capacity 1,375 - 1,250 stons - mtons Static load capacity 1,375 - 1,250 stons - mtons Rotating load capacity stons - mtons Two speed gearbox yes/no: No Emergency chain drive yes/no: No Driven by an independent electric motor yes/no: N/A (hydraulic operated) Electric motor type/make N/A (hydraulic operated) Output power N/A (hydraulic operated) Maximum continuous torque 45,000 ft.lbs generated / 120,000 ft-lbs maximum back-up torque on mechanical locks Drip pan/mud collection system yes/no: Yes Make/Type Aux NOV VBJ RST 605 Maximum opening 60-1/2 Inches Rated capacity 1,000 - 907 stons - mtons Static load capacity 1,000 - 907 stons - mtons Rotating load capacity stons - mtons Two speed gearbox yes/no: No Emergency chain drive yes/no: No Driven by an independent electric motor yes/no: N/A (hydraulic operated) Electric motor type/make N/A (hydraulic operated) Output power Maximum continuous torque 45,000 ft.lbs generated / 120,000 ft-lbs maximum back-up torque on mechanical locks Drip pan/mud collection system yes/no: Yes
Rotary Table. 444mm National S-175, rated 155,000xxX, COMBINATION WATER/FUEL TANK: 40,000L capacity for water (primary supply). 31,622L UPPER DOGHOUSE: 2.4m high x 1.8m wide x 6m long capacity for water (secondary supply). 13,638/. equipped with knowledge box, tool board, steam capacity for fuel with 1.8m x 3m storage heaters S storage area, compartment for fuel & water pumps. MAST: Kremco 34m (112'), 159,000xxX HANDLING EQUIPMENT: (350,000 lb) hook load, telescoping 8 lines. Racking capacity 6096m of 89mm tubing or drill TONGS: Power tubing tongs: Xxxxxx 54-93 pipe. equipped with 63.3mm, 73mm, & 89mm, Manual rotary rig tongs with jaws 3-1/2 to 10-5/8". HOOK BLOCK: XxXxxxxxx blocks, 136 tonne, 4 sheaves, grooved for 28.6mrn line, 134,000xxX ELEVATORS; Tubing elevators for 63.3 mm, 73mm c/w Web Xxxxxx hydra hook rated at & 89mm. Drill pipe elevators for 4-112 134,000xxX. SLIPS: Rotary table slips, Drill collar slips and LINKS: BJ, 247 m, 155,000xxX. safety clamp. SWIVEL: TSM 150, 134,000xxX.
Rotary Table. Make / Type: NOV - Xxxxx XX / RST 605 Maximum Opening: 60 1/2” with 49-1/2” and 37-1/2” adapters Rated Capacity: 1000 tons Powered By: Motor - Make / Type: 3 High Torque Hydraulic Motors 10-950 Output Power 45,000 Ft/lbs Max/Min speed: 15 / 5 rpm Make: NOV - Varco MPCH Type: 37 1/2” Size Inserts Available: No.: 1, 2 and 3 Make: NOV - Varco Type: TDS-1000A Rated Capacity: 1000 Tons Test/Working Pressure: 7,500 PSI Remote Operated Xxxxx Cock (y/n): Yes Driven By: General Electric AC Motor Type of Motor: GEB-20B Output Power: 1150 HP Cont. /1400 H.P. Intermittent Output Torque: 62,000Ft Lbs @ 90 RPM Mud Line I.D: 4” Pipe Handler: PH-100 w/Hydraulic link Tilt Quantity: 1 Make: Ingersol Rand Type: FA5iMR24MK1G Capacity: 5 Ton utility, 3.4 Ton Personnel Wire Diameter: 3/4” x 700 ft Automatic Brakes (y/n) Yes Quantity: 2 Make: RAM Type: AW2.9K6-12AX1 Capacity: 10 tons Wire Diameter: 1” x 700 ft Auto Brakes: Yes Quantity: Make: Type: Capacity: Wire Diameter: Automatic Brakes (y/n): Certified For Man Riding (y/n): 1 Ingersol Rand FA150KGiMR-I-E 330 Lbs 10mm x 600 ft Yes (Automatic oil bath wet disk brakes) Yes Quantity: Make: Type: Capacity: Wire Diameter / Non-twist wire Automatic Brakes (y/n): 2 Xxxxxxxxx Xxxx or equivalent FA2B-7MK utility 4400 lbs. 7/16” x 150 ft Yes
Rotary Table. Make/Type : Varco Maximum opening inches: 60 Rated capacity st: 1000 Static load capacity st: 1000 Rotating load capacity st @ rpm: TBA Two speed gearbox yes/no: No Max RPM @t Max Torque RPM/ Ft lbs 17/48000 Emergency chain drive yes/no: no Driven by an independent electric motor yes/no: No Electric motor type/make : Hydraulic x 4 Maximum continuous torque ft/lbs: 48000 Drip pan/mud collection system yes/no: yes
Rotary Table. Operate the rotary table for one (1) hour under no load at various speeds. Check the rotary lock Calibrate the rotary torque measurement device and the rotary speed counter.

Related to Rotary Table

  • Wage Scales All workers covered by this Agreement shall be classified and paid in accordance with the classification and wage scales as attached as Appendices "A" and forming part of this Agreement.

  • Contribution Formula - Basic Life Coverage For employee basic life coverage and accidental death and dismemberment coverage, the Employer contributes one-hundred (100) percent of the cost.

  • Check Meters Developer, at its option and expense, may install and operate, on its premises and on its side of the Point of Interconnection, one or more check meters to check Connecting Transmission Owner’s meters. Such check meters shall be for check purposes only and shall not be used for the measurement of power flows for purposes of this Agreement, except as provided in Article 7.4 below. The check meters shall be subject at all reasonable times to inspection and examination by Connecting Transmission Owner or its designee. The installation, operation and maintenance thereof shall be performed entirely by Developer in accordance with Good Utility Practice.

  • Estimated Number of Participating Households Approximately 6,460. This figure is based on loans with unpaid principal balances ranging from $200,000 to $400,000 with an average funding of $5,000.00.

  • Wage Scale The wages shown in Appendix A will be part of this Agreement.

  • ESTIMATED / SPECIFIC QUANTITY CONTRACTS Estimated quantity contracts, also referred to as indefinite delivery / indefinite quantity contracts, are expressly agreed and understood to be made for only the quantities, if any, actually ordered during the Contract term. No guarantee of any quantity is implied or given. With respect to any specific quantity stated in the contract, the Commissioner reserves the right after award to order up to 20% more or less (rounded to the next highest whole number) than the specific quantities called for in the Contract. Notwithstanding the foregoing, the Commissioner may purchase greater or lesser percentages of Contract quantities should the Commissioner and Contractor so agree. Such agreement may include an equitable price adjustment.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Grades At the end of each semester, students shall receive a final grade report that shall become a part of their permanent record. The College District’s grading system shall apply to all courses: A (90-100) - Excellent B (80-89) - Good C (70-79) - Average D (60-69) - Poor F (Below 60) - Failure I Incomplete Q Dropped W Dropped Due to Good Cause or Withdrawal from College CR Credit P Pass NP Not Passing FS Academic Fresh Start I - Incomplete: indicates that the coursework was incomplete because of serious illness or other justified emergency. The instructor shall change the grade of “I” to a grade based on the work completed for the course in addition to the work specified in the course completion contract. All incomplete work shall be completed within 90 days of the start of the next long semester. Failure to complete the work specified in the course completion contract shall result in a grade of zero, which shall be factored into the final grade calculation with appropriate weighting relative to other course grades.

  • Wet Weather In the event of wet weather, work in the open will continue until the particular work in hand can no longer be done safely and efficiently. Whilst it is raining, employees will be required to: Continue to work under cover or relocate to alternative work under cover, on site. Obtain materials and services for employees working under cover where there is only minimal exposure to inclement weather. When required, perform emergency and safety work. In addition, work on unexpected breakdowns, which can be corrected in limited time duration. Should a portion of the project be affected by wet weather, all other employees not so affected shall continue working in accordance with award conditions, regardless that some employees may be entitled to cease work due to wet weather. If a halt to productive work occurs due to inclement weather, the parties agree that employees may be relocated to other unaffected sites. Where the above steps are not possible, affected employees may be required to attend tool box meetings, work planning sessions or skills development activities, all of which will count as productive time for payment purposes.

  • Basic Work Week ‌ a) The basic work week of an employee working full- time shall be forty (40) hours consisting of five eight hour days; b) Daily hours of work shall be consecutive with the exception of rest and meal periods. No split shifts shall be worked; c) Employees shall not work longer than their regular, scheduled work day, unless requested to do so by Management; in which event, additional time will be paid at applicable regular or overtime rates. Employees are required to leave the store as soon as it is reasonable to do so.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!