Saw Cutting Sample Clauses

Saw Cutting. Use a saw equipped with a diamond-tipped blade, a blade guard, alignment guides, water cooling system, and cut-depth controls for saw cutting the perimeter of the patch. Do not allow cooling water, slurry, and dust from the sawing operation to enter any lane opened to traffic. Make all required full depth longitudinal saw cuts along the perimeter of the patch prior to making any full depth transverse saw cuts. Where only one lane is being patched, make a full depth saw-cut in the existing longitudinal joint for the full length of the patch. Where multiple lanes are being patched one lane at a time, perform one of the following: • Make a full depth saw-cut within the adjacent lane to be patched. Make the saw-cut parallel and not more than 1 foot from the existing longitudinal joint. Form the patch joint in the same location as the existing longitudinal joint and backfill behind the forms with aggregate at no additional cost to the Department. • Make a full depth saw-cut in the existing longitudinal joint for the length of the patch and insert a temporary rigid separator between the adjacent lane and the patch area. Do not use a temporary rigid separator greater than 1/8 inch thick. Make full depth transverse saw- cuts at the locations marked on the pavement surface. Do not break back the underside of the existing pavement. If break back or spalling occurs, make a new full depth transverse saw-cut beyond the area of break back or spalling. Place the additional length of patch at no expense to the Department. If break back or spalling occurs in the adjacent lane, repair the damaged area at a minimum with a full depth Type A concrete patch at no additional expense to the Department. Full depth saw cuts at the patch limits will be allowed to extend transversely into the adjacent pavement up to full depth + 2 inches provided dowel bars in the adjacent lane are not damaged. Additional full depth transverse saw cuts will be allowed to facilitate slab removal but may not extend transversely into the adjacent pavement to remain in place.
AutoNDA by SimpleDocs
Saw Cutting. This work shall consist of saw cutting existing concrete and bituminous pavement, concrete curb and gutter driveway pavement, and sidewalk as shown in the plans and as directed by the Engineer.
Saw Cutting. When pre-authorized by Juab County in writing, saw cutting is required on all existing asphalt surfaces before material is removed. The pavement shall be cut in neat, vertical, straight lines, to allow for specified compaction densities along the face of the cut. Any pavement outside the trench, which is damaged, shall be removed in a neat straight line. All concrete surfaces shall be removed to the nearest control joint (or score line). Some concrete surfaces may require saw cutting. Hydra hammers are not allowed. A stable, sound, durable, smooth, prompt and safe asphalt restoration must be accomplished. The restored pavement shall blend with the surrounding surface both in appearance and riding quality. The restored pavement should be broomed off, wiped up, and hosed down.
Saw Cutting. The cost for saw cutting shall be incidental to other items in the Contract; therefore, there will be no separate payment for saw cutting.

Related to Saw Cutting

  • Irrigation The City shall provide water to the Premises for the purpose of irrigating the facility. The City specifically reserves the right to restrict water usage under this Agreement if water restrictions are placed on other water users within the City. Prior to the start of the season, City will provide charge up and run through the automatic irrigation systems to check for proper operation. City will provide Lessee with a radio for remote operation of the irrigation system, which Lessee shall use for the day to day maintenance, repair, and monitoring of the irrigation system. If the radio is lost, stolen, broken, or is rendered unusable, Lessee shall pay $1500 for the replacement radio. City is responsible for the maintenance and repair of the following irrigation elements, to the extent applicable: curb stops, backflow prevention devices, backflow enclosures, main line pipings, electric control valves, and controllers. Lessee shall notify Parks Division Water managers by email if any of these irrigation elements are malfunctioning or broken.

  • FLOORING Developer shall provide carpeted flooring with non-static flooring in server 23 room.

  • PAVING Provide a standard bubble map, as part of the plans, showing locations of numbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following: ▪ all platted control irons (set or not), including plat boundary irons, for the entire sub-division, not just the current phase ▪ benchmarks, including TBM set with preliminary survey In addition to the required coordinate information, the following shall be included in all plans, at a minimum, as needed for construction staking on all City projects. ▪ Include copy of plat(s) on all plans, as relevant and approved by the Design Engineer ▪ Benchmarks – minimum of two City standards, four total desirable; as close to project as possible, even if TBM set with preliminary survey. ▪ Benchmark elevations must be in the same datum as the design (i.e. NAV 88 design needs NAV 88 benchmarks, not NAV 29) ▪ All control irons/identified property irons shall be shown on plans, with BL stationing and offset ▪ Show deflection angles in BL, and/or bearing/azimuth of BL sections ▪ Arterial project side streets – provide BL station at CL of intersection of the two streets, on the BL; BL station and offset to CL of side street at removal limits; include deflection angle from BL to CL of side street ▪ Existing FL/pavement grades shown at all match points ▪ Top of curb grades and stationing at all ends-of-return and horizontal/vertical P.I.’s, not just even stationing ▪ CL top of pavement grades for arterial ▪ CL elevation for streets on mass grading work @ 100’ Sta in tangent sections and 50’ on curves.

  • Excavation If any excavation shall be made upon land adjacent to or under the Building, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter the Premises for the purpose of performing such work as said person shall deem necessary or desirable to preserve and protect the Building from injury or damage and to support the same by proper foundations, without any claim for damages or liability against Landlord and without reducing or otherwise affecting Tenant’s obligations under this Lease.

  • Welding Welding and use of cutting torches or cutoff saws will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum 10-foot radius of all welding and cutting operations. A shovel and a 5-gallon standard backpack water container filled and with handpump attached shall be immediately available for use in the event of a fire start. C8.212 – MARKET-RELATED CONTRACT TERM ADDITION (11/08). The term of this contract may be adjusted when a drastic reduction in wood product prices has occurred in accordance with 36 CFR 223.52. The Producer Price Index used to determine when a drastic reduction in price has occurred is stated in A20. Purchaser will be notified whenever the Chief determines that a drastic reduction in wood product prices has occurred. If the drastic reduction criteria specified in 36 CFR 223.52 are met for 2 consecutive calendar quarters, after contract award date, Contracting Officer will add 1 year to the contract term, upon Purchaser’s written request. For each additional consecutive quarter such a drastic reduction occurs, Contracting Officer will, upon written request, add an additional 3 months to the term during Normal Operating Season, except that no single 3-month addition shall extend the term of the contract by more than one year. Contracting Officer must receive Purchaser’s written request for a market-related contract term addition before the expiration of this contract. No more than 3 years shall be added to a contract's term by market-related contract term addition unless the following conditions are met: