Shoreline Stabilization Design Sample Clauses

Shoreline Stabilization Design i. SS1 and XX0 XX0 and SS2 are proposed to use the dredge material to repair shoreline breaches caused by major storm events in the region. Filling in these areas with dredge material will help protect the wildlife habitats located behind these identified sites. A combination of topographic and bathymetric surveys will be required for these sites to most accurately estimate the quantity of material needed for the proposed design of the beneficial use sites. Design of SS2 will need to be coordinated with other planned projects by the General Land Office and the landowner/representatives.
AutoNDA by SimpleDocs

Related to Shoreline Stabilization Design

  • Post-Stabilization Services The PH-MCO must cover Post-Stabilization Services, as defined in 42 C.F.R. §438.114. The PH-MCO must limit charges to Members for Post-Stabilization Services to an amount no greater than what the PH-MCO would charge the Member if he or she had obtained the services through a Network Provider. The PH-MCO must cover Post-Stabilization Services without authorization, and regardless of whether the Member obtains the services within or outside its Provider Network if any of the following situations exist:

  • Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.

  • Research Design The data generated by excavations at the prehistoric site(s) will be used to examine at least three topics: (1) chronology; (2) technology; and (3) subsistence practices. Insights into changing patterns of community organization may also be granted, as may insights into changes in social organization. The data recovered will then be compared to data from other regional sites.

  • Development Area 10.4. The Development Area shall encompass all Deposits to be produced.

  • Completion of Development Upon the completion of the whole development or complete phases of the development, Council may review this Agreement, in whole or in part, and may:

  • Timing of Development The California Supreme Court held in Xxxxxx Construction Co. v. City of Camarillo, 37 Cal.3d 465 (1984), that failure of the parties in that case to provide for the timing of development resulted in a later adopted initiative restricting the timing of development to prevail over the parties’ agreement. It is the intent of Developer and the City to cure that deficiency by expressly acknowledging and providing that any Subsequent Code Change that purports to limit over time the rate or timing of development or to alter the sequencing of development phases (whether adopted or imposed by the City Council or through the initiative or referendum process) shall not apply to the Property or the Project and shall not prevail over this Agreement. In particular, but without limiting any of the foregoing, no numerical restriction shall be placed by the City on the amount of total square feet or the number of buildings, structures, residential units that can be built each year on the Property except as expressly provided in this Agreement.

  • Stabilization Neither the Company nor, to its knowledge, any of its employees, directors or shareholders (without the consent of the Representative) has taken or shall take, directly or indirectly, any action designed to or that has constituted or that might reasonably be expected to cause or result in, under Regulation M of the Exchange Act, or otherwise, stabilization or manipulation of the price of any security of the Company to facilitate the sale or resale of the Public Securities.

  • Construction Development of the Project The Allottee has seen the proposed layout plan/demarcation-cum-zoning/sanctioned plans, / site plan / building plan, specifications, amenities and facilities, etc. depicted in the advertisement / brochure / agreement / website (as the case may be) regarding the Project where the Said Independent Floor for residential usage along with parking is located and has accepted the floor / site plan, Payment Plan and the specifications, amenities, facilities, etc. [annexed along with this Agreement] which has been approved by the competent authority, as represented by the Promoter. The Promoter shall develop the Project in accordance with the bye-laws such as Haryana Building Code, 2017, FAR, density norms, provisions prescribed, approved plans, terms and condition of the license/ allotment as well as registration of RERA, etc. Subject to the terms in this Agreement, the Promoter undertakes to strictly abide by such plans approved by the competent authorities and shall also strictly abide by the provisions and norms prescribed by the relevant State laws and shall not have an option to make any variation/ alteration/ modification in such plans, other than in the manner provided under the Act and Rules made thereunder or as per approvals/instructions/ guidelines of the competent authorities, and any breach of this term by the Promoter shall constitute a material breach of the Agreement.

  • Pavement Design If applicable, the Engineer shall incorporate the pavement design developed by the State for this project. If the pavement design is not available, the State may request the Engineer to perform pavement design and submit to State for review and approval.

  • Design Development An interim step in the design process. Design Development documents consist of plans, elevations, and other drawings and outline specifications. These documents will fix and illustrate the size and character of the entire project in its essentials as to kinds of materials, type of structure, grade elevations, sidewalks, utilities, roads, parking areas, mechanical and electrical systems, and such other work as may be required.

Time is Money Join Law Insider Premium to draft better contracts faster.