Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.
Access; Utilities; Separate Tax Parcels Based solely on evaluation of the Title Policy (as defined in paragraph 8) and survey, if any, an engineering report or property condition assessment as described in paragraph 12, applicable local law compliance materials as described in paragraph 26, and the ESA (as defined in paragraph 43), each Mortgaged Property (a) is located on or adjacent to a public road and has direct legal access to such road, or has permanent access from a recorded easement or right of way permitting ingress and egress to/from a public road, (b) is served by or has access rights to public or private water and sewer (or well and septic) and other utilities necessary for the current use of the Mortgaged Property, all of which are adequate for the current use of the Mortgaged Property, and (c) constitutes one or more separate tax parcels which do not include any property which is not part of the Mortgaged Property or is subject to an endorsement under the related Title Policy insuring the Mortgaged Property, or in certain cases, an application has been made or is required to be made to the applicable governing authority for creation of separate tax parcels (or the Mortgage Loan documents so require such application in the future), in which case the Mortgage Loan requires the Mortgagor to escrow an amount sufficient to pay taxes for the existing tax parcel of which the Mortgaged Property is a part until the separate tax parcels are created.
New utilities (i) The Contractor shall allow, subject to the permission from the Authority and such conditions as the Authority may specify, access to, and use of the Site for laying telephone lines, water pipes, electricity lines/ cables or other public utilities. Where such access or use causes any financial loss to the Contractor, it may require the user of the Site to pay compensation or damages as per Applicable Laws. For the avoidance of doubt, it is agreed that use of the Site under this Clause 9.3 shall not in any manner relieve the Contractor of its obligation to construct and maintain the Project Highway in accordance with this Agreement and any damage caused by such use shall be restored forthwith at the cost of the Authority. (ii) The Authority may, by notice, require the Contractor to connect any adjoining road to the Project Highway, and the connecting portion thereof falling within the Site shall be constructed by the Contractor at the Authority’s cost in accordance with Article 10. (iii) The Authority may by notice require the Contractor to connect, through a paved road, any adjoining service station, hotel, motel or any other public facility or amenity to the Project Highway, whereupon the connecting portion thereof that falls within the Site shall be constructed by the Contractor on payment of the cost. The cost to be paid by the Authority to the Contractor shall be determined by the Authority’s Engineer. For the avoidance of doubt, in the event such road is to be constructed for the benefit of any entity, the Authority may require such entity to make an advance deposit with the Contractor or the Authority, as the case may be, of an amount equal to the estimated cost as determined by the Authority’s Engineer and such advance shall be adjusted against the cost of construction as determined by the Authority’s Engineer hereunder. (iv) In the event construction of any Works is affected by a new utility or works undertaken in accordance with this Clause 9.3, the Contractor shall be entitled to a reasonable Time Extension as determined by the Authority’s Engineer.
Payment of Utilities Pay for electricity and all other utilities consumed in or relating to the Subject Unit and proportionately for the Common Portions.
Access; Utilities; Separate Tax Lots Each Mortgaged Property (a) is located on or adjacent to a public road and has direct legal access to such road, or has access via an irrevocable easement or irrevocable right of way permitting ingress and egress to/from a public road, (b) is served by or has uninhibited access rights to public or private water and sewer (or well and septic) and all required utilities, all of which are appropriate for the current use of the Mortgaged Property, and (c) constitutes one or more separate tax parcels which do not include any property which is not part of the Mortgaged Property or is subject to an endorsement under the related Title Policy insuring the Mortgaged Property, or in certain cases, an application has been, or will be, made to the applicable governing authority for creation of separate tax lots, in which case the Mortgage Loan requires the Mortgagor to escrow an amount sufficient to pay taxes for the existing tax parcel of which the Mortgaged Property is a part until the separate tax lots are created.
Heating, Ventilating and Air Conditioning General Office Area: The building shall be equipped with a combination heating, ventilation and air conditioning system. The system shall have ducted supply and return air. The space above the ceiling shall not be used as a supply or return plenum. The systems shall be sized in accordance with the
COMMON UTILITIES Expenses for serving/supply of common facilities and utilities and all charges incidental thereto.
Sanitary Sewer Provide a standard bubble map, as part of the plans, showing locations of numbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following: ▪ all possible control as established or attained during preliminary survey, including but not limited to – section corners, property irons, intersection center-center irons, other set monuments ▪ benchmarks, including TBM set with preliminary survey ▪ center of manholes ▪ end of manhole stubs (when longer than five feet)
Utility Charges Tenant shall pay or cause to be paid all charges for electricity, power, gas, oil, water and other utilities used in connection with the Leased Property.
Sanitary Facilities Construction (a) Closets shall be soundly constructed and roofed with weatherproof material. The floor of each closet shall be well drained and constructed of concrete, bricks and cement, or of other approved materials which shall be impervious to water. Every closet shall be well lighted by natural or artificial light and shall be ventilated. Each closet shall have a hinged door, capable of being fastened on the inside, lift seats/flaps and toilet paper. (b) If closets are of single unit construction (only to be used for the formwork process), not contained within a purpose built ablution block, privacy walls which shield the closet/s from outside view shall be installed. (Privacy walls are not required for purpose built ablution blocks eg ATCO huts). (c) Where practicable, toilets to be connected to sewerage before commencement of the job. (d) Closet/urinal location to be conveniently accessible to Employees, but not so close as to cause a nuisance to those persons. (e) Where necessary, portable water seal toilets of an approved standard are to be provided and regularly serviced. (f) Conveniently accessible closets and urinals are to be distributed every 5th floor on multi storey constructions. (g) Closets and urinals are to be washed daily with disinfectant and kept in clean, hygienic condition. (h) Adequate washing facilities, suitably drained, and wash basins/troughs are to be supplied with hot and cold running water. (i) Soap and towels are to be supplied.