Street Improvements, Paving or Resurfacing Sample Clauses

Street Improvements, Paving or Resurfacing. The City shall give the Company reasonable written notice of plans for street improvements where paving or resurfacing of a permanent nature is involved. The notice shall contain the nature and character of the improvements, the streets upon which the improvements are to be made, the extent of the improvements and the time when the City will start the work, and, if more than one street is involved, the order in which this work is to proceed. The notice shall be given to the Company in a sufficient length of time, considering seasonable working conditions, in advance of the actual commencement of the work to permit the Company to make any additions, alterations or repairs to its facilities the Company deems necessary. In cases where the street are at final width and grade, and the City has installed underground sewer and water mains and service connections to the property line abutting the streets prior to a permanent paving or resurfacing of such streets and the Company’s main is located under such street, the Company may be required to install gas service connections prior to such paving or resurfacing, whenever it is apparent that gas service will be required during the five (5) years following the paving or resurfacing.
AutoNDA by SimpleDocs

Related to Street Improvements, Paving or Resurfacing

  • PAVING Provide a standard bubble map, as part of the plans, showing locations of numbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following: ▪ all platted control irons (set or not), including plat boundary irons, for the entire sub-division, not just the current phase ▪ benchmarks, including TBM set with preliminary survey In addition to the required coordinate information, the following shall be included in all plans, at a minimum, as needed for construction staking on all City projects. ▪ Include copy of plat(s) on all plans, as relevant and approved by the Design Engineer ▪ Benchmarks – minimum of two City standards, four total desirable; as close to project as possible, even if TBM set with preliminary survey. ▪ Benchmark elevations must be in the same datum as the design (i.e. NAV 88 design needs NAV 88 benchmarks, not NAV 29) ▪ All control irons/identified property irons shall be shown on plans, with BL stationing and offset ▪ Show deflection angles in BL, and/or bearing/azimuth of BL sections ▪ Arterial project side streets – provide BL station at CL of intersection of the two streets, on the BL; BL station and offset to CL of side street at removal limits; include deflection angle from BL to CL of side street ▪ Existing FL/pavement grades shown at all match points ▪ Top of curb grades and stationing at all ends-of-return and horizontal/vertical P.I.’s, not just even stationing ▪ CL top of pavement grades for arterial ▪ CL elevation for streets on mass grading work @ 100’ Sta in tangent sections and 50’ on curves.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Exterior Drainage Does water stand on the property for more than 24 hours after a heavy rain? Yes No Unknown Comments Are gutters and downspouts in good repair? Yes No Unknown Comments:

  • Fences Except for establishment cost incurred by the United States and replacement cost not due to the Landowner’s negligence or malfeasance, all other costs involved in maintenance of fences and similar facilities to exclude livestock are the responsibility of the Landowner. The installation or use of fences which have the effect of preventing wildlife access and use of the Easement Area are prohibited on the Easement Area, easement boundary, or on the Landowner’s land that is immediately adjacent to, and functionally related to, the Easement Area.

  • Exterior and interior functional areas and spaces of the Project, with technical and equipment requirements on each;

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • Interior (a) Ceilings, sidewalls and bulkhead panels shall be clean and free of cracks and stains;

  • Roof Any leaks or evidence of moisture? Yes No Unknown Type of Roof: Age Comments: Is there any existing fire retardant treated plywood? Yes No Unknown Comments:

  • Pavement The combined surface course, base course, and subbase course, if any, considered as a single unit.

Time is Money Join Law Insider Premium to draft better contracts faster.