Supervision and Direction of Work Sample Clauses

Supervision and Direction of Work. The Contractor shall supervise and direct the Work, using its best skill and attention. The Contractor shall be solely responsible for all construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work, including coordination of the duties of all Subcontractors, Vendors, and trades, unless the Contract Documents provide otherwise. The Contractor shall be responsible for properly laying out the Work, and for all lines, elevations and measurements for all of the Work executed in accordance with the Contract Documents. The Contractor shall verify the figures shown on the Drawings before planning out the Work and will be held responsible for any error, omission or inaccuracies resulting from its failure to do so.
AutoNDA by SimpleDocs
Supervision and Direction of Work. The Contractor shall supervise and direct the work, using the contractor’s best skill and attention. The Contractor shall be solely responsible for and have control over construction means, methods, techniques, sequences, and procedures and for coordinating all portions of the work under the contract, unless the Contract Documents give other specific instructions concerning these matters. If the Contract Documents give specific instructions concerning construction means, methods, techniques, sequences, or procedures, the Contractor shall evaluate the jobsite safety thereof and, except as stated below, shall be fully and solely responsible for the jobsite safety of such means, methods, techniques, sequences or procedures. If the Contractor determines that such means, methods, techniques, sequences, or procedures may not be safe, the Contractor shall give timely written notice to the Engineer and shall not proceed with that portion of the work without further written instructions from the Engineer. If the Contractor is then instructed to proceed with the required means, methods, techniques, sequences, or procedures without acceptance of changes proposed by the Contractor, the Owner shall be solely responsible for any resulting loss or damage.

Related to Supervision and Direction of Work

  • Supervision and Direction Contractor shall supervise and direct the Work using diligent skill and attention. Contractor shall be responsible for and shall coordinate all construction means, methods, techniques, sequences, and procedures. (See Article 3.1.1

  • Supervision of Work The TSP shall provide all necessary superintendence for execution of the Project and its supervisory personnel shall be available to provide full-time superintendence for execution of the Project. The TSP shall provide skilled personnel who are experienced in their respective fields.

  • Supervision of Contractor Personnel The Contractor must supply all necessary and sufficient supervision over the work that is being performed and will be held solely responsible for the conduct and performance of his employees or agents involved in work under the Agreement.

  • SUPERVISION OF THE WORK 6.1 Contractor shall supervise and direct the Work, using Contractor’s best skill and attention. Contractor shall be solely responsible for all methods, techniques, sequences and procedures, and shall coordinate all portions of the Work. County will deal only through Contractor, who shall be responsible for the proper execution of the entire Work.

  • Supervision of Student Teachers Paragraph 1: Supervision of a student teacher shall be voluntary. Teachers shall normally be notified of a student teacher assigned at least two (2) weeks prior to the student teacher’s introduction to the classroom. The school system shall provide the cooperating teacher with whatever materials it deems appropriate. The cooperating teacher shall be responsible for being knowledgeable of the contents of any such materials provided.

  • MAINTENANCE OF CLASSROOM CONTROL AND DISCIPLINE A. When, in the judgment of a teacher, a student is, by behavior, seriously disrupting the instructional program to the detriment of other students, the teacher may exclude the student temporarily from the classroom and refer the student to the building administrator for appropriate intervention. At the request of the referring teacher, an administrator will communicate the status of a disciplinary action within two (2) work days of the request.

  • Inspection of Work It is FIRST PARTY's obligation to make the work product available for CITY's inspections and periodic reviews upon request by CITY.

  • Inspection of Services Subcontractor shall make the Services accessible at all reasonable times for inspection by the Contractor. Subcontractor shall, at the first opportunity, inspect all material and equipment delivered to the job site by others to be used or incorporated in the Subcontractor’s Services and give prompt notice of any defect therein. Subcontractor assumes full responsibility to protect the work done hereunder until final acceptance by the Contractor or any authorized third (3rd) party.

  • Supervision of Students At least one teacher is to remain with the students after the close of any activity, practice session or game until the last student has left the premises. This rule applies whether the group is at the home school or field or is away.

  • SUPERVISION AND CONSTRUCTION PROCEDURES 4.3.1 The Contractor shall supervise and direct the Work, using his / her best skill and attention. The Contractor shall be solely responsible for all construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Contract. All aspects of the Project shall be subject to the inspection and approval of the State. Contractor guarantees to repair, replace, re-execute or otherwise correct any defect in workmanship, materials, or the like that fails to conform to the requirements of this Contract or that appears during the progress of the Work or within one year of final acceptance by the State.

Time is Money Join Law Insider Premium to draft better contracts faster.