Survey Control Plan Sample Clauses

Survey Control Plan. The vendor will assess all existing ground control for Project suitability. If required, additional ground control will be surveyed to adequately extend over the Project area to meet accuracy requirements for 0.25’ orthos and 2-foot contours. Preliminary analysis shows adequate control exists to produce the intended mapping products per specification. The vendor may utilize existing survey control and related sources such as points from past Eastside projects, the 2016 PSLC regional lidar project, various WDOT projects that fall within the Project area, or other appropriate sources. The Project goal is to utilize existing sources where possible and add supplemental control where necessary. Coordinates will be provided as follows:
AutoNDA by SimpleDocs

Related to Survey Control Plan

  • Quality Control Plan Within forty five (45) days after the design development documents are approved, the Design-Builder shall develop a quality control plan for the Project (the “Quality Control Plan”). A draft of the Quality Control Plan shall be submitted to the Department and shall be subject to the Department’s review and approval. The Quality Control Plan shall be tailored to the specific products/type of construction activities contemplated by the GMP Basis Documents, and in general, shall include a table of contents, quality control team organization, duties/responsibilities of quality control personnel, submittal procedures, inspection procedures, deficiency correction procedures, documentation process, and a list of any other specific actions or procedures that will be required for key elements of the Work.

  • Quality Control Program The Contractor shall describe the Quality Control Program in a written document which shall be reviewed by the Engineer prior to the start of any production, construction, or off-site fabrication. The written Quality Control Program shall be submitted to the Engineer for review at least ten (10) calendar days before the start of construction. The Quality Control Program shall be organized to address, as a minimum, the following items:

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • SUBSTANCE ABUSE POLICY 6.6.1. Labor and Management are committed to providing employees with a drug-free and alcohol-free workplace. It is the goal to protect the health and safety of employees and to promote a productive workplace, and protect the reputation of Labor and Management and the employees.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Meal Plan The Student who resides in a university residence hall is required to purchase a full residential dining plan (commuter plans are not acceptable). The Student who resides in Bobcat Village may choose either a residential or a commuter plan, but is not obligated to make a dining plan purchase due to availability of kitchen in each apartment unit.

  • Transition Plan In the event of termination by the LHIN pursuant to this section, the LHIN and the HSP will develop a Transition Plan. The HSP agrees that it will take all actions, and provide all information, required by the LHIN to facilitate the transition of the HSP’s clients.

  • Agreement Exceptions/Deviations Explanation If the proposing Vendor desires to deviate form the Vendor Agreement language, all such deviations must be listed on this attribute, with complete and detailed conditions and information included. TIPS will consider any deviations in its proposal award decisions, and TIPS reserves the right to accept or reject any proposal based upon any deviations indicated below. In the absence of any deviation entry on this attribute, the proposer assures TIPS of their full compliance with the Vendor Agreement. No response

  • Professional Growth and Improvement Plans A. Professional growth and improvement plans shall be developed as follows:

  • Individual Special Circumstance Arrangements Notwithstanding Article 2.02, the Home and the Union may agree in certain circumstances, to adjust the schedule of an individual full-time employee who normally works seventy five (75) hours bi-weekly, to enable an average bi-weekly work assignment of sixty (60) to seventy five (75) hours.

Time is Money Join Law Insider Premium to draft better contracts faster.