TECHINCAL ARCHITECTURE Sample Clauses

TECHINCAL ARCHITECTURE. The following categories will be affected by the implementation of this project: • Service Requirements: o Compliance: Regulations in effect to protect patient privacy regarding the use of electronic health records. o Authentication/Single Sign On: Access to EHR and research systems will be restricted to certain personnel and will require a sign on into each system authenticated by a user. • Component Framework: o Digital Signatures: Regulations regarding digital signatures including EHR and research records will need to be followed. o Validation workflows: Regulations requiring procedures to ensure accuracy, reliability, consistent intended performance, and the ability to discern invalid or altered records o Data Interchange: Data exchange will be impacted by the exchange of information across systems. o Database Connectivity: Relevant data within the EHR will need to be connected. • Service Interface and Integration: o Enterprise Application Integration: As the research systems will no longer stand alone, the enterprise will be affected. • Interoperability: o Data Format/Classification: RFD is capable of leveraging industry standards. HL7 is the messaging format (Enterprise, 2011). o Data transformation: Data coming from the EHR may need to be transformed to an acceptable research format.
AutoNDA by SimpleDocs

Related to TECHINCAL ARCHITECTURE

  • Physical Architecture 59.2.1 CenturyLink's network architecture in any given local exchange area and/or LATA can vary markedly from another local exchange area/LATA. Using one or more of the NIMs herein, the Parties will agree to a physical architecture plan for a specific LATA, or if appropriate based on other requirements in Section 59, Local Calling Area. The physical architecture plan, as described in the Local Interconnection POI Profile, will be discussed during joint implementation planning. CLEC and CenturyLink agree to Interconnect their networks through existing and/or new Interconnection Facilities between CLEC switch(es) and CenturyLink's End Office Switch(es) and/or Tandem Switch(es). The physical architecture plan will be in accordance with Forecasting and Planning requirements in Article IV.

  • Architecture The Private Improvements shall have architectural features, detailing, and design elements in accordance with the Project Schematic Drawings. All accessory screening walls or fences, if necessary, shall use similar primary material, color, and detailing as on the Private Improvements.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Project Management Project Management Institute (PMI) certified project manager executing any or all of the following: • Development of Project Charter • Development of project plan and schedule • Coordination and scheduling of project activities across customer and functional areas • Consultation on operational and infrastructure requirements, standards and configurations • Facilitate project status meetings • Timely project status reporting • Address project issues with functional areas and management • Escalation of significant issues to customers and executive management • Manage project scope and deliverable requirements • Document changes to project scope and schedule • Facilitate and document project closeout

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Engineering Forest Service completed survey and design for Specified Roads prior to timber sale advertisement, unless otherwise shown in A8 or Purchaser survey and design are specified in A7. On those roads for which Forest Service completes the design during the contract, the design quantities shall be used as the basis for revising estimated costs stated in the Schedule of Items and adjusting Timber Sale Account. Forest Service engineering shall be completed according to the schedule in A8. Should Forest Service be unable to perform the designated survey and design by the completion date or other agreed to time, upon written agreement, Purchaser shall assume responsibility for such work. In such event, Contracting Officer shall revise:

  • Moonlighting 24.01 The Company and the Union agree in principle to eliminate the practice commonly referred to as moonlighting.

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Trunk Group Architecture and Traffic Routing The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows: