Transmission Line Design and Conductor Objectives Sample Clauses

Transmission Line Design and Conductor Objectives. ❖ Structure framing and material descriptions ➢ The substation rebuild necessary to accommodate the New Colony Wind project requires reconstruction of the existing substation conductor and shield wire get-a- ways. A combination of single pole guyed wood structures and two pole wood H- frame structures are estimated for installation at this site to permit attachment to the new substation deadend terminals and to meet requirements of NWE design standards and the National Electric Safety Code. ➢ The existing 7-strand #8 copper transmission line conductor on the Rainbow to Two Dot 100 kV Line will be left in place looking toward Kings Hill from Martinsdale, while new 336.4 MCM ACSR conductor will be installed on the Two Dot side of Martinsdale to accommodate line relocation up to the new substation terminal deadend structures. ➢ The 100 kV shoe-fly shall be installed as single-pole guyed wood structures, consisting of three SDDECG6G2 type framings on a centerline of approximately 600 ft in length. 336.4 MCM ACSR conductor will be installed in the shoe-fly. Shield wire will not be installed on the temporary shoe-fly alignment. The shoe-fly will be tied into the existing 44.8 mile 100 kV line segment between Kings Hill and the Two Dot Substation while the line is de-energized. ❖ Material Procurement NWE will procure all material necessary for new and replacement facilities defined as NWE ownership. ❖ Cost Estimate Reference the Transmission Network Facilities detailed cost estimate spreadsheet for the transmission line and shoe-fly cost estimates. ❖ Transmission Facility Time Line The lead-time necessary for survey, design, material procurement, delivery and installation of the 100 kV transmission line facilities and shoe-fly construction is approximately 20 weeks.
AutoNDA by SimpleDocs

Related to Transmission Line Design and Conductor Objectives

  • DEVELOPMENT OR ASSISTANCE IN DEVELOPMENT OF SPECIFICATIONS REQUIREMENTS/ STATEMENTS OF WORK Firms and/or individuals that assisted in the development or drafting of the specifications, requirements, statements of work, or solicitation documents contained herein are excluded from competing for this solicitation. This shall not be applicable to firms and/or individuals providing responses to a publicly posted Request for Information (RFI) associated with a solicitation.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Benchmarks for Measuring Accessibility For the purposes of this Agreement, the accessibility of online content and functionality will be measured according to the W3C’s Web Content Accessibility Guidelines (WCAG) 2.0 Level AA and the Web Accessibility Initiative Accessible Rich Internet Applications Suite (WAI-ARIA) 1.0 for web content, which are incorporated by reference. Adherence to these accessible technology standards is one way to ensure compliance with the College’s underlying legal obligations to ensure that people with disabilities are able to acquire the same information, engage in the same interactions, and enjoy the same benefits and services within the same timeframe as their nondisabled peers, with substantially equivalent ease of use; that they are not excluded from participation in, denied the benefits of, or otherwise subjected to discrimination in any College programs, services, and activities delivered online, as required by Section 504 and the ADA and their implementing regulations; and that they receive effective communication of the College’s programs, services, and activities delivered online.

  • Joint Network Implementation and Grooming Process Upon request of either Party, the Parties shall jointly develop an implementation and grooming process (the “Joint Grooming Process” or “Joint Process”) which may define and detail, inter alia:

  • For Product Development Projects and Project Demonstrations  Published documents, including date, title, and periodical name.  Estimated or actual energy and cost savings, and estimated statewide energy savings once market potential has been realized. Identify all assumptions used in the estimates.  Greenhouse gas and criteria emissions reductions.  Other non-energy benefits such as reliability, public safety, lower operational cost, environmental improvement, indoor environmental quality, and societal benefits.  Data on potential job creation, market potential, economic development, and increased state revenue as a result of the project.  A discussion of project product downloads from websites, and publications in technical journals.  A comparison of project expectations and performance. Discuss whether the goals and objectives of the Agreement have been met and what improvements are needed, if any.

  • Project Management Plan 1 3.4.1 Developer is responsible for all quality assurance and quality control 2 activities necessary to manage the Work, including the Utility Adjustment Work.

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

  • Supplemental JBoss Software Conditions Software Access and Software Maintenance for Supplemental JBoss Software is intended and available for Development Purposes only and for up to 25 users for each 16 Core Band Subscription of Red Hat JBoss Middleware Software that you purchased. If you deploy or use the Supplemental JBoss Software for Production Purposes or for more than 25 users, you agree to purchase the appropriate Software Subscriptions for each Unit that you deploy or use. Red Hat’s Open Source Assurance Program applies only to the Red Hat JBoss Middleware Software Subscription that you purchased (such as Red Hat JBoss Enterprise Application Platform in the example above) and does not apply to Supplemental JBoss Software. JBoss xPaaS Subscriptions (defined below) are not considered Supplemental JBoss Software. Each installation and use of JBoss xPaaS Subscriptions Software for either Development Purposes or Production Purposes is a Unit and requires a paid Software Subscription.

  • PERFORMANCE MANAGEMENT SYSTEM 5.1 The Employee agrees to participate in the performance management system that the Employer adopts or introduces for the Employer, management and municipal staff of the Employer.

Time is Money Join Law Insider Premium to draft better contracts faster.