Transmission Line Facilities. The Laona Station will tie into Lines 161 and 162 via a loop tap configuration between structures 120 and 122. Line 161 and 162 are approximately 33.99 miles in length, and shares a right-of-way with the Company’s 34.5 xX Xxxxxxx-Xxxxxxxxx Line 852. Based on the initial proposed location provided, installation of a loop-in/loop-out tap to the Laona Station will require removal of the existing structure 121, and installation of eight (8) steel structures w/ caisson foundations and approximately 1600 circuit feet of 795 kcmil 26/7 ACSR “DRAKE” conductor. The lines shall be renumbered as follows: • Line 161: Dunkirk-Laona • Line 162: Dunkirk-Laona • Line 172: Laona-Falconer • Line 173: Laona-Falconer The loop-in/loop-out must be arranged such that the 161 and 162 circuits do not cross outside the station (i.e., all crossings shall occur in the station on bus structures.).
Transmission Line Facilities. The Developer shall be responsible for designing, engineering, procuring, constructing, and installing overhead and riser poles in connection with the line break of Connecting Transmission Owner’s existing 69 kV transmission line. In addition, the Developer shall engineer, design, construct, and install, and the Connecting Transmission Owner shall procure, approximately 0.6 miles of 69 kV 2500 kcm cu XLPE cable to loop in (0.3 miles) and out (0.3 miles) of the existing transmission line into the 0XX Xxxxxx Xxxxxx Substation. The Connecting Transmission Owner shall perform design review, oversee construction, test, and commission the facilities constructed by the Developer.
Transmission Line Facilities. The Xxxxxxxx Road Station will tie into Line 73 via a loop tap configuration between structures 281 and 282. The loop in/out shall be perpendicular to Line 73 and will require installation of:
Transmission Line Facilities. Due to the proposed location of the Moon Road Station, in addition to the loop in/out of Lines 172 and 173, other transmission and distribution line assets are impacted, which will require both permanent and temporary Other System Upgrade Facilities. The Connecting Transmission Owner shall establish a gravel access road within the existing transmission ROW for the construction and future maintenance of all line work associated with this project (i.e., Xxxxxxx-Xxxxxxxxx Line 852, Xxxxxxxxx-Xxxx Rd Line 159, and Line 172 and 173 loop in/loop out). NOTE: The estimated cost associated with this work are not included in the cost estimates contained in this Agreement because the decision to complete this work in lieu of the Developer installing access roads through the wetlands was identified after the Facilities Study was completed. The Developer is responsible for all costs associated with this work. • Xxxxxxx-Xxxxxxxxx Line 852 The Xxxxxxx-Xxxxxxxxx Line 852 is a 34.5 kV sub-transmission line located approximately 30 feet east of Lines 172 and 173. To accommodate the Lines 172 and 173 loop in/loop out, the section of the existing Line 852 between Structures 77 and 81 will first need to be removed and installed underground. This will include replacing two (2) existing structures 77 and 81 with riser structures, removing three (3) structures (78,79, & 80) and approximately 1050 circuit feet A-8 SERVICE AGREEMENT NO. 2475 of conductor, and installing approximately 1050 circuit feet of three-phase underground in a new duct bank. The Developer is responsible for acquiring all property and environmental permits required for the Line 852 modifications. • Xxxxxxxxx-Xxxx Road Line 159 The Xxxxxxxxx-Xxxx Line 159 is approximately 9.42 miles and is the only feed into Xxxxxxxxx. With the Moon Road Station replacing the existing Moon Switching Station, Line 159 will need to be extended and terminated at the Moon Road Station. This will require: • Installation of a deadend steel pole structure; • Installation of a vertical tangent davit arm single pole structure; • Replacement of structure 84-84A-84B; • Removal of structures 85 and 85A; • Installation of ~1250 circuit feet of 795 ACSR 26/7 ‘DRAKE’ conductor; and • Installation of ~1250 feet of 3/8” E.H.S Steel overhead groundwire. The existing phasing of the line shall remain the same. Line 159 is the only feed to Xxxxxxxxx and must: (i) remain energized at all times, and (ii) have two (2) line sources at all times. In add...
Transmission Line Facilities. The following is a detailed summary of the Transmission line Facilities needed to interconnect the project with the NWE system.
Transmission Line Facilities. Black River – Lighthouse Line #6 Interconnection The Middle Road Substation is to be located directly adjacent to Line 6, and will tie into it via a loop tap configuration between structures 42 and 43. The loop in-loop out tap will consist of removing one (1) double circuit steel flex tower (Structure 43), and installing two (2) single steel pole vertical dead end tap structures approximately 85’ in height and 400 circuit feet of 795 kcmil ACSR 26/7 Drake conductor. The steel pole grounding shall be attached to existing counterpoise in the area. Conductor will be installed between both tap structures but loops will be left open at each structure. The existing phasing on the Line 6 is 1-3-2 top to bottom. Since the tap will roll from a vertical conductor configuration to horizontal conductor configuration, the final Middle Road Substation takeoff structure phasing is flexible. Black River – Lighthouse Hill Line #6 Telecommunications T he existing transmission line Optical Ground Wire (“OPGW”) must be spliced and looped into and out of the new Middle Road Substation, utilizing an existing splice box on transmission structure #42 and installing two underground feeds each consisting of 600 linear feet of underground fiber optic cable from structure #42 to the new Middle Road Substation. Each feed would consist of a 4-inch schedule 80 conduit containing Outside plant (“OSP”) fiber optic cable designed for underground applications. Fiber Extension to Lighthouse Hill Substation Existing OPGW on Line 6 will be extended into the Lighthouse Hill Substation control house by installing ADSS fiber from Structure 318 to Structure 319 of Line 6.
Transmission Line Facilities. All Transmission Line Facilities that are a component of Transmission Lines that are Contributed Assets and that are not transferred with the Transmission Line Land Rights upon which they are located shall be contributed, transferred, conveyed and assigned to ATCLLC pursuant to a Bxxx of Sale substantially in the form of the Bxxx of Sale attached as Exhibit 3.2(d).
Transmission Line Facilities. Due to the proposed location of the Moon Road Station, in addition to the loop in/out of Lines 172 and 173, other transmission and distribution line assets are impacted, which will require both permanent and temporary Other System Upgrade Facilities. The Connecting Transmission Owner shall establish a gravel access road within the existing transmission ROW for the construction and future maintenance of all line work associated with this project (i.e., Xxxxxxx-Xxxxxxxxx Line 852, Xxxxxxxxx-Xxxx Rd Line 159, and Line 172 and 173 loop in/loop out). NOTE: The estimated cost associated with this work are not included in the cost estimates contained in this Agreement because the decision to complete this work in lieu of the Developer installing access roads through the wetlands was identified after the Facilities Study was completed. The Developer is responsible for all costs associated with this work. • Xxxxxxx-Xxxxxxxxx Line 852 The Xxxxxxx-Xxxxxxxxx Line 852 is a 34.5 kV sub-transmission line located approximately 30 feet east of Lines 172 and 173. To accommodate the Lines 172 and 173 loop in/loop out, the section of the existing Line 852 between Structures 77 and 81 will first need to be removed and installed underground. This will include replacing two (2) existing structures 77 and 81 with riser structures, removing three (3) structures (78,79, & 80) and approximately 1050 circuit feet of conductor, and installing approximately 1050 circuit feet of three-phase underground in a new duct bank. The Developer is responsible for acquiring all property and environmental permits required for the Line 852 modifications. • Xxxxxxxxx-Xxxx Road Line 159 The Xxxxxxxxx-Xxxx Line 159 is approximately 9.42 miles and is the only feed into Xxxxxxxxx. With the Moon Road Station replacing the existing Moon Switching Station, Line 159 will need to be extended and terminated at the Moon Road Station. This will require: • Installation of a deadend steel pole structure; • Installation of a vertical tangent davit arm single pole structure; • Replacement of structure 84-84A-84B; • Removal of structures 85 and 85A; • Installation of ~1250 circuit feet of 795 ACSR 26/7 ‘DRAKE’ conductor; and • Installation of ~1250 feet of 3/8” E.H.S Steel overhead groundwire. The existing phasing of the line shall remain the same. Line 159 is the only feed to Xxxxxxxxx and must: (i) remain energized at all times, and (ii) have two (2) line sources at all times. In addition to the station location, ...
Transmission Line Facilities. Net Value Asset Level (Eng In Service Yr) Month Ending : Nov-2021
Transmission Line Facilities. The following is a detailed summary of the Transmission line Facilities needed to interconnect the project with the NWE system.
4.1 Interconnection Customer Facilities
4.2 Transmission Provider Interconnection Facilities