Unit Acreage Specifications Sample Clauses

Unit Acreage Specifications. Unit # Gross Acres Net Acres Total Deletions Existing Roads Leave Tree Acres Power Line Other 2 94.16 94.16 0.00 3 68.35 64.35 4.00 4.00 4 68.12 68.12 0.00 5 83.20 81.70 1.50 1.50 ROW6 2.90 2.90 0.00 Total 415.68 406.98 8.70 7.20 1.50 0.00 0.00 Cruise Sample Design: This timber sale was cruised using the variable plot sampling method. The double basal area system was employed; a small BAF to determine Basal Area (count trees) and a large BAF to determine the Volume-Basal Area Ratio (cruise trees). Each plot was a full plot. Plot locations were created using a computer generated grid, and found using a hand held GPS unit. Unit # Small BAF (count) Large BAF (cruise) Sighting height Grid size (plot spacing in feet) % Cruise to count Target % Cruise to count Actual Total number of Plots 1 33.61 100.28 D4H 310’ x 310’ 33% 38% 43 2 33.61 100.28 D4H 310’ x 310’ 33% 30% 41 3 27.78 80.28 D4H 310’ x 310’ 33% 36% 32 4 33.61 100.28 D4H 310’ x 310’ 33% 43% 32 5 40 122.5 D4H 310’ x 310’ 33% 36% 37 ROW6 33.61 n/a D4H 200’ 100% 100% 17 Total 44% 43% 202 Cruise Specifications: Minor species cruise intensity: We grade the first tree of all minor species encountered with the smaller BAF; then followed through with the small BAF to large BAF ratio. Minimum top dib: Ponderosa pine and western red cedar: Trees less than 17.5” DBH have a minimum top of 5.6” dib. Trees 17.6” and greater DBH have a minimum top dib of 40% of DOB at 16’or a 6” top whichever is greater. All other species: Trees less than 17.5” DBH have a minimum top of 4.6” dib. Trees 17.6” and greater DBH have a minimum top dib of 40% of DOB at 16’or a 6” top whichever is greater. Minimum dbh: Ponderosa pine and western red-cedar: 8.0 inches DBH All other species: 7.0 inches DBH Log lengths: Saw logs: 32 feet where possible, minimum of 12 feet Firewood: 40 feet where possible, minimum of 12 feet Utility: 16 feet where possible, minimum of 12 feet Take / Leave tree description: Harvest all timber nor marked with purple paint, and all dead standing and down timber except for 2-2-2. Leave the two largest snags per acre, preferred snags are western larch and Xxxxxxx fir. Cut all timber between orange Right-of-Way tags exterior to the timber sale units. Commercial species observed in sale area, but not in cruise: Utility wood: Comprised of non-board foot volume and volume below the minimum top diameter of 5” or 40% of DOB at 16’ to a minimum of a 2.6” top. Status codes used: D - dead Sort codes used D – saw log, U – util...
AutoNDA by SimpleDocs
Unit Acreage Specifications. Unit # Gross Acres Net Acres Total Deletions RMZ / WMZ Leave Tree Acres Existing Roads Other 2 6.85 6.65 0.20 0.20 3 93.41 90.26 3.15 1.25 1.90 4 92.35 91.90 0.45 0.45 5 63.88 62.98 0.90 0.50 0.40 6 94.83 94.70 0.13 0.13 7 4.15 4.01 0.14 0.14 8 25.63 24.55 1.08 1.00 0.08 9 96.47 94.75 1.72 0.60 1.12 Total 577.17 568.20 8.97 0.00 3.35 5.62 0.00 Cruise Sample Design: Units 1 to 7 and 9 were cruised using the variable plot sampling method. The double basal area system was employed; a small BAF to determine Basal Area (count trees) and a large BAF to determine the Volume-Basal Area Ratio (cruise trees). Each plot was a full plot. Plot locations were created using a computer generated grid, and found using a hand held GPS unit. Unit 8 was strip cruised on a 20% grid. Unit # Small BAF (count) Large BAF (cruise) Sighting height Grid size (plot spacing in feet) % Cruise to count Target % Cruise to count Actual Total number of Plots 1 33.61 134.44 D4H 310 x 310 25% 29.8% 40 2 20.00 20.00 D4H 310 x 310 100% 100.0% 3 3 27.78 111.11 D4H 310 x 310 25% 27.2% 43 4 27.78 111.11 D4H 310 x 310 25% 28.9% 41 5 20.00 62.50 D4H 310 x 310 32% 31.7% 27 6 27.78 111.11 D4H 310 x 310 25% 24.4% 41 7 20.00 20.00 D4H 310 x 310 100% 100.0% 2 8 20% Strip Cruise D4H 330 x330 100% 100.0% 12 9 33.61 134.44 D4H 310 x 310 25% 23.1% 40 Total 50.1% 249 Cruise Specifications: Minor species cruise intensity: We grade the first tree of all minor species encountered with the smaller BAF; then followed through with the small BAF to large BAF ratio. Minimum top dib: Ponderosa pine: Trees less than 17.5” DBH have a minimum top of 5.6” dib. Trees 17.6” and greater DBH have a minimum top dib of 40% of DOB at 16’or a 6” top whichever is greater. All other species: Trees less than 17.5” DBH have a minimum top of 4.6” dib. Trees 17.6” and greater DBH have a minimum top dib of 40% of DOB at 16’or a 6” top whichever is greater. Minimum dbh: Ponderosa pine: 8.0 inches DBH All other species: 7.0 inches DBH Log lengths: Saw logs: 32 feet where possible, minimum of 12 feet Utility: 16 feet where possible, minimum of 12 feet Take / Leave tree description: Xxxxx 0-0, 0, 0 & 0 Xxxxxxx all green conifers that meet the minimum cruise specifications and are not banded with blue paint. Units 5 & 8 Harvest all green conifers that meet the minimum cruise specifications and are not banded with purple paint. Commercial species observed in sale area, but not in cruise: Utility wood: Comprised of non-board foot volume and vo...

Related to Unit Acreage Specifications

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Equipment Specifications All equipment must meet the contract specifications and all federal and State safety codes and regulations in effect at the date of manufacture. All equipment must be Original Equipment Manufacturer (OEM) equipment unless otherwise stated in the contract. Items Offered as New. All products, materials, supplies, replacement parts, and equipment offered and furnished must be new, of current manufacturer production, and must have been formally announced by the manufacturer as being commercially available, unless otherwise stated in this Contract.

  • DAF Specifications Developer shall submit initial specifications for the DAF, including System Protection Facilities, to Connecting Transmission Owner and NYISO at least one hundred eighty (180) Calendar Days prior to the Initial Synchronization Date; and final specifications for review and comment at least ninety (90) Calendar Days prior to the Initial Synchronization Date. Connecting Transmission Owner and NYISO shall review such specifications to ensure that the DAF are compatible with the technical specifications, operational control, and safety requirements of the Connecting Transmission Owner and NYISO and comment on such specifications within thirty (30) Calendar Days of Developer’s submission. All specifications provided hereunder shall be deemed to be Confidential Information.

  • General specifications 6.1.1. A vehicle and its electrical/electronic system(s) or ESA(s) shall be so designed, constructed and fitted as to enable the vehicle, in normal conditions of use, to comply with the requirements of this Regulation.

  • Technical Specification As enumerated in Special Conditions of Contract/Scope of Work/attached Drawing/ Details/Schedule of Rates.

  • The Specifications The Specifications are that portion of the Contract Documents consisting of the written requirements for materials, equipment, systems, standards and workmanship for the Work, and performance of related services.

  • Escrow Format Specification 3.1. Deposit’s Format. Registry objects, such as domains, contacts, name servers, registrars, etc. will be compiled into a file constructed as described in draft-xxxxx-xxxxxxx-registry-data-escrow, see Part A, Section 9, reference 1 of this Specification and draft-xxxxx-xxxxxxx-dnrd-objects-mapping, see Part A, Section 9, reference 2 of this Specification (collectively, the “DNDE Specification”). The DNDE Specification describes some elements as optional; Registry Operator will include those elements in the Deposits if they are available. If not already an RFC, Registry Operator will use the most recent draft version of the DNDE Specification available at the Effective Date. Registry Operator may at its election use newer versions of the DNDE Specification after the Effective Date. Once the DNDE Specification is published as an RFC, Registry Operator will implement that version of the DNDE Specification, no later than one hundred eighty (180) calendar days after. UTF-8 character encoding will be used.

  • Service Specification The Parties have agreed upon the scope and specification of the Services provided under this Service Agreement in the Service Specification.

  • Project Specific Milestones In addition to the milestones stated in Section 212.5 of the Tariff, as applicable, during the term of this ISA, Interconnection Customer shall ensure that it meets each of the following development milestones:

  • Product Specifications The Company agrees that all Products sold to Xxxx hereunder shall conform to the respective specifications set forth on Schedule A or to such other specifications as are from time to time agreed upon by the Parties.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!