Use of Space The COUNTY will provide the space located at: [insert Orange County Government Location] (the “Designated Space”) which shall be utilized by the AGENCY solely for the lawful purpose of providing the services. If no space is designated, this Article V does not apply.
Use of School Buildings The ASSOCIATION and its representatives shall have the right to use school buildings at all reasonable hours for meetings. This use must be within the hours when custodians are regularly employed and within accepted school policy.
System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass xxxxxx. In addition to runoff conveyance, the grass xxxxxx also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off-site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12-inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1- 2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after [Municipality Name] accepts verification of construction from the project engineer.
Job Description The Employer agrees to draw up job descriptions for all positions for which the Union is bargaining agent. These descriptions shall be presented and discussed with the Union and shall become the recognized job descriptions unless the Union presents written objection within thirty (30) calendar days.
Job Descriptions The Employer agrees to supply each employee with a copy of her current job description. Upon request, the Union and the Bargaining Unit Chair shall be provided copies of all job descriptions in the bargaining unit.
Use of School Facilities 1. The Association will have the right to use school buildings at reasonable times for meetings in accordance with Committee policy on the Use of School Facilities. The principal of the building in question will be notified in advance of the time and place of all such meetings. 2. There will be one (1) bulletin board in each school building, which will be placed in the faculty lounge, for the purpose of displaying professional notices, circulars, and other Association material. Copies of all such material will be given to the building principal, but his advance approval will not be required.
Use of School Equipment The Association shall have the right to use school facilities and equipment for official Association business, including typewriters, duplicating equipment, computers and all types of audiovisual equipment at reasonable times and when such equipment is not otherwise in use, and shall provide advance notice of such use to the Superintendent of Schools. The Association shall pay for the cost of all materials and supplies.
Site Description {Buyer Comment: Provide a legal description of the Site, including the Site map.}
Work Description T-804 Opening Roads - Removal of closure devices, cleaning ditches, removing berms, and blading the traveled-way T-811 Closing Roads - Water bar frequency per BMPs for remainder of road T-811 Closing Roads - Engineering Rep. or Construction Inspector must be notified prior to performing closeout 76A Single Lane / Level 1 76 0.00 Ending 0.70
SERVICE LEVEL DESCRIPTION The Fund Accounting Agreement is hereby amended by deleting the Service Level Description attached thereto and replacing it in its entirety with the Service Level Description attached hereto.