Verification Plans Sample Clauses

Verification Plans. As already explained in this scenario, data should come from a (mock) edge device. The data should be transformed and stored in a persistent database, and finally a visualization tool should be able to visualize the streaming data. As mentioned earlier, the container mocking the edge device should be on a different network than database and visualization tool.
AutoNDA by SimpleDocs
Verification Plans. For the Non-Edge scenario, historical data sources in CSV format should be converted to the semantified version via a semantic adaptor and served via a Federated Query Engine to the analytical tools. Finally, a visualizer component is used to present the results of the analytical tools. However, as in this case only one data source exists (already explained in Section 2.2.1), we decided to divide the data vertically into 2 parts. The result was 2 files with different columns in each as follows: CSV1: • Id • Date • Hour CSV2: • Id • Zone • Source • Connections By applying such a division, the Federated Query Engine can be tested to see if it can merge results from multiple data sources. To test the pipeline with bigger data, some synthetic data has been generated with different sizes. The procedure is explained in Section 39.
Verification Plans. As already explained in this scenario Metadata registry is tested by registering two IDS Connectors to the deployed metadata registry and finally transferring a JSON between 2 IDS connector. For this reason, we use 2 TRUE Connectors as IDS connector. One connector as producer and one as consumer. First the producer register itself to the metadata registry and then the consumer can search metadata registry for the provider and request a JSON content. Moreover, we test the Vocabulary Provider by testing the interaction between an IDS connector and Vocabulary Provider.
Verification Plans. (a) Promptly foLlowing execution of this Agreement, the University and the Company will work together to develop a proposed verification plan for the Analytical Testing Facility to inspect and test as comprehensively as reasonably possible, the instalLation and operation of all equipment installed as part of the Development Work and compliance of the Analytical Testing Facility with the FaciLity Requirements and the Approved Facility Design.

Related to Verification Plans

  • Verification Procedure (1) The signature file of each processed file is validated.

  • MEASUREMENT AND VERIFICATION The goal of this task is to report the benefits resulting from this project. Project team may use in- house expertise of the project demonstration site or use third party vendor for measurement and verification (M&V) of GHG and energy consumption reduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9 (if using outside vendor) • Coordinate site visits with the M&V subcontractor at the demonstration site(s) • Develop M&V protocol for pre-installation measurement (and calculations) following Section II.B.2 of the grant solicitation manual3: o Electric, natural gas and/or other fossil fuel consumption and greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are be upgraded and/or replaced and/or modified; and o If necessary, ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o A description of the monitoring equipment and instrumentation which will be used; o A description of the key input parameters and output metrics which will be measured; o A description of the M&V protocol and analysis methods to be employed; and o A description of the independent, third-party measurement and verification services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified.  Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. 3 GFO-18-903, Food Production Investment Program, California Energy Commission, November 2018. xxxxx://xxx.xxxxxx.xx.xxx/contracts/GFO-18-903/000_FPIP_Solicitation_Manual.docx • Prepare and provide a Post-installation M&V Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project.

  • Employee Verification In accordance with Neb. Rev.

  • Disclosure Statement for Xxxxxxxxx Education Savings Accounts 1. Who is Eligible for a Xxxxxxxxx Education Savings Account? Anyone may contribute to a Xxxxxxxxx Education Savings Account regardless of his or her relationship to the beneficiary. The beneficiary of a Xxxxxxxxx Education Savings Account

  • Verification Bank may, from time to time, verify directly with the respective Account Debtors the validity, amount and other matters relating to the Accounts, either in the name of Borrower or Bank or such other name as Bank may choose.

  • Electronic Visit Verification ("EVV Provider shall cooperate with State requirements for electronic visit verification for personal care services and home health services, as applicable.

  • Medical Verification The Town may require medical verification of an employee’s absence if the Town perceives the employee is abusing sick leave or has used an excessive amount of sick leave. The Town may require medical verification of an employee’s absence to verify that the employee is able to return to work with or without restrictions.

  • Contractor’s Federal Employment Verification Certification The Contractor is registered with, authorized to use, is using and will continue to use, the federal work authorization program throughout the term of the contract, and holds the following authorization: User Identification Number: Date of Authorization: Date WITNESSETH, that the Contractor and the Owner, for the consideration set forth herein, the adequacy and sufficiency of which is hereby acknowledged by each party, agree as follows:

  • Disclosure Statement for Xxxx IRAs 1. Am I Eligible to Contribute to a Xxxx XXX? Anyone with compensation income whose Modified Adjusted Gross Income (AGI) does not exceed the limits described below is eligible to contribute to a Xxxx XXX. (For convenience, all future references to compensation are deemed to mean “earned income” in the case of a self- employed individual.) Employers may also contribute to Xxxx IRAs established for the benefit of their employees. You may also establish a Xxxx XXX to receive rollover contributions or transfers from another Xxxx XXX or, in some cases, from a Traditional IRA. A Qualified Rollover Contribution can be made to a Xxxx XXX and is a distribution from an IRA that meets the requirements of section 408(d)(3), a rollover from a designated Xxxx account described in section 402A, or a rollover from an eligible retirement plan as described in section 402(c)(8)(B).

  • Account Verification Whether or not a Default or Event of Default exists, Agent shall have the right at any time, in the name of Agent, any designee of Agent or any Borrower, to verify the validity, amount or any other matter relating to any Accounts of Borrowers by mail, telephone or otherwise. Borrowers shall cooperate fully with Agent in an effort to facilitate and promptly conclude any such verification process.

Time is Money Join Law Insider Premium to draft better contracts faster.