Windscreen fitting Sample Clauses

Windscreen fitting. All vehicles including tractors, earthmoving equipment etc., and including fitting of side and rear panels and sun roofs, other than employees employed under the terms and conditions of the Vehicle Industry Repair Service and Retail Award 1983 [Print H5658 (V0019)].
AutoNDA by SimpleDocs

Related to Windscreen fitting

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Fire Fighting Costs of operating and maintaining the fire-fighting equipments and personnel, if any.

  • Installation Services 3.1 The Bitstream 2a Service includes a Standard Install as set out below (in each case to the extent that the relevant provisioning works are not already complete for the relevant Service Order).1

  • Utility Infrastructure During the term of this Agreement, Company will have the right to receive water, sanitary sewer, electric, storm drainage, telecommunication and data services at the Premises.

  • Outdoor Lighting 3.8.1 Lighting shall be directed to driveways, parking areas, loading area, building entrances and walkways and shall be arranged so as to divert the light away from streets, adjacent lots and buildings.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Cheating Cheating is prohibited, and will result in immediate action and termination without compensation.

  • Retaining Walls Prepare preliminary retaining concepts to be shown on schematics, typical sections, and cross sections. • Determine if any additional walls are required and verify the need for and length of the retaining wall as shown on the ultimate schematic. • Compute and tabulate retaining wall quantities for preliminary design milestone plans submittal.

  • Moonlighting 24.01 The Company and the Union agree in principle to eliminate the practice commonly referred to as moonlighting.

Time is Money Join Law Insider Premium to draft better contracts faster.