Winter 2016 programme Sample Clauses

Winter 2016 programme audience 1 Achieve audience target figures set in Strategic Plan to sustain the business plan. Attendances As above Annual review meeting The season of 98 performances in the Festival Theatre and 68 in the Xxxxxxx Theatre, exceeded its Box Office target by 11%.
AutoNDA by SimpleDocs

Related to Winter 2016 programme

  • Programme 13.1 Within the time stated in the Contract Data, the Contractor shall submit to the Engineer for approval a Programme showing the general methods, arrangements,' order and timing for all the activities for the construction of works. 13.2 The program shall be supported with all the details regarding key personnel, equipment and machinery proposed to be deployed on the works for its execution. The contractor shall submit the list of equipment and machinery being brought to site, the list of key personnel being deployed, the list of machinery/equipment being placed in field laboratory and the location of field laboratory along with the Programme.

  • CFR 200 328. Failure to submit such required Performance Reports may cause a delay or suspension of funding. 30 ILCS 705/1 et seq.

  • Maintenance Programme (i) The Contractor shall prepare a monthly maintenance programme (the “Maintenance Programme”) in consultation with the Authority’s Engineer and submit the same to the Authority’s Engineer not later than 10 (ten) days prior to the commencement of the month in which the Maintenance is to be carried out. For this purpose a joint monthly inspection by the Contractor and the Authority’s Engineer shall be undertaken. The Maintenance Programme shall contain the following: (a) The condition of the road in the format prescribed by the Authority’s Engineer; (b) the proposed maintenance Works; and (c) deployment of resources for maintenance Works.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.

  • Training Program It is agreed that there shall be an Apprenticeship Training Program, the provisions of which are set forth in Exhibit "D", which is attached hereto and forms part of this Agreement.

  • Safety Program The Contractor shall design a specific safety program for the Work for the site(s). The Contractor shall establish and require all Subcontractors to establish reasonable safety programs. The Contractor shall also submit its standard monthly safety reports to the Owner and Design Professional. No imposition of responsibility on the Contractor for safety under this Contract shall relieve any subcontractor of its responsibility for safety of persons or property on or near the Project Site. The Contractor shall include in his plant he names of the person in charge of Safety.

  • Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester. 7.2.2 No later than thirty (30) Days prior to the earlier of the Scheduled Substantial Completion Date or Substantial Completion, Design-Builder shall provide to Owner for review a detailed testing plan for the Performance Tests (other than for air emissions). Owner and Design-Builder shall agree upon a testing plan that shall be consistent with the Performance Test Protocol contained in Exhibit A hereto. After such agreement has been reached, Design-Builder shall notify the Owner five (5) business days prior to the date Design-Builder intends to commence the Performance Tests and shall notify the Owner upon commencement of the Performance Tests. Owner and Independent Engineer each have the right to witness all testing, including the Performance Tests and any equipment testing, whether at the Site or at the Subcontractor’s or equipment supplier’s premises during the course of this Agreement. Notwithstanding the foregoing sentence, Owner shall bear the costs of providing a witness to any such testing and all such witnesses shall comply at all times with Design-Builder’s, Subcontractor’s or equipment supplier’s safety and security procedures and other reasonable requirements, and otherwise conduct themselves in a manner that does not interfere with Design-Builder’s, Subcontractor’s or equipment supplier’s activities or operations. 7.2.3 Design-Builder shall provide to Owner a Performance Test report (excluding results from air emissions testing), including all applicable test data, calculations and certificates indicating the results of the Performance Tests and, within five (5) business days of Owner’s receipt of such results, Owner, Independent Engineer and Design-Builder will jointly inspect such Work and review the results of the Performance Tests to verify that the Performance Guarantee Criteria have been met. If Owner or Independent Engineer reasonably determines that the Performance Guarantee Criteria have not been met, Owner shall notify Design-Builder the reasons why Owner determined that the Performance Guarantee Criteria have not been met and Design-Builder shall promptly take such action or perform such additional work as will achieve the Performance Guarantee Criteria and shall issue to the Owner another notice in accordance with Section 7.2.2; provided however that if the notice relates to a retest, the notice may be provided no less than two (2) business days prior to the Performance Tests. Such procedure shall be repeated as necessary until Owner and Independent Engineer verifies that the Performance Guarantee Criteria have been met. 7.2.4 If Owner, for whatever reason, prevents Design-Builder from demonstrating the Performance Guarantee Criteria within thirty (30) Days of Design-Builder’s notice that the Plant is ready for Performance Testing, then Design-Builder shall be excused from demonstrating compliance with the Performance Guarantee Criteria during such period of time that Design-Builder is prevented from demonstrating compliance with the Performance Guarantee Criteria; provided however that Design-Builder will be deemed to have fulfilled all of its obligations to demonstrate that the Plant meets the Performance Guarantee Criteria should such period of time during which Design-Builder is prevented from demonstrating the Performance Criteria exceed thirty (30) Days or extend beyond the Final Completion Date.

  • Training Programs All employees shall successfully complete all necessary training prior to being assigned work (e.g., all employees will complete health and safety training prior to being assigned to task). Nothing in this Article or provision shall constitute a waiver of either party’s bargaining obligations or defenses. The Employer still has an obligation to notify and bargain changes in terms and conditions of employment with the exclusive representative.

  • Originating Switched Access Detail Usage Data A category 1101XX record as defined in the EMI Telcordia Practice BR-010-200- 010.

  • PROPOSED MOBILITY PROGRAMME The proposed mobility programme includes the indicative start and end months of the agreed study programme that the student will carry out abroad. The Learning Agreement must include all the educational components to be carried out by the student at the receiving institution (in table A) and it must contain as well the group of educational components that will be replaced in his/her degree by the sending institution (in table B) upon successful completion of the study programme abroad. Additional rows can be added as needed to tables A and B. Additional columns can also be added, for example, to specify the study cycle-level of the educational component. The presentation of this document may also be adapted by the institutions according to their specific needs. However, in every case, the two tables A and B must be kept separated, i.e. they cannot be merged. The objective is to make clear that there needs to be no one to one correspondence between the courses followed abroad and the ones replaced at the sending institutions. The aim is rather that a group of learning outcomes achieved abroad replaces a group of learning outcomes at the sending institution, without having a one to one correspondence between particular modules or courses. A normal academic year of full-time study is normally made up of educational components totalling 60 ECTS* credits. It is recommended that for mobility periods shorter than a full academic year, the educational components selected should equate to a roughly proportionate number of credits. In case the student follows additional educational components beyond those required for his/her degree programme, these additional credits must also be listed in the study programme outlined in table A. When mobility windows are embedded in the curriculum, it will be enough to fill in table B with a single line as described below: Component code (if any) Component title (as indicated in the course catalogue) at the sending institution Semester [autumn / spring] [or term] Number of ECTS* credits Mobility window … Total: 30 Otherwise, the group of components will be included in Table B as follows: Component code (if any) Component title (as indicated in the course catalogue) at the sending institution Semester [autumn / spring] [or term] Number of ECTS* credits Course x … 10 Module y … 10 Laboratory work … 10 Total: 30 The sending institution must fully recognise the number of ECTS* credits contained in table A if there are no changes to the study programme abroad and the student successfully completes it. Any exception to this rule should be clearly stated in an annex of the Learning Agreement and agreed by all parties. Example of justification for non-recognition: the student has already accumulated the number of credits required for his/her degree and does not need some of the credits gained abroad. Since the recognition will be granted to a group of components and it does not need to be based on a one to one correspondence between single educational components, the sending institution must foresee which provisions will apply if the student does not successfully complete some of the educational components from his study programme abroad. A web link towards these provisions should be provided in the Learning Agreement. The student will commit to reach a certain level of language competence in the main language of instruction by the start of the study period. The level of the student will be assessed after his/her selection with the Erasmus+ online assessment tool when available (the results will be sent to the sending institution) or else by any other mean to be decided by the sending institution. A recommended level has been agreed between the sending and receiving institutions in the inter-institutional agreement. In case the student would not already have this level when he/she signs the Learning Agreement, he/she commits to reach it with the support to be provided by the sending or receiving institution (either with courses that can be funded by the organisational support grant or with the Erasmus+ online tutored courses). All parties must sign the document; however, it is not compulsory to circulate papers with original signatures, scanned copies of signatures or digital signatures may be accepted, depending on the national legislation. * In countries where the "ECTS" system it is not in place, in particular for institutions located in partner countries not participating in the Bologna process, "ECTS" needs to be replaced in all tables by the name of the equivalent system that is used and a weblink to an explanation to the system should be added. The section to be completed during the mobility is needed only if changes have to be introduced into the original Learning Agreement. In that case, the section to be completed before the mobility should be kept unchanged and changes should be described in this section. Changes to the mobility study programme should be exceptional, as the three parties have already agreed on a group of educational components that will be taken abroad, in the light of the course catalogue that the receiving institution has committed to publish well in advance of the mobility periods and to update regularly as ECHE holder. However, introducing changes might be unavoidable due to, for example, timetable conflicts. Other reasons for a change can be the request for an extension of the duration of the mobility programme abroad. Such a request can be made by the student at the latest one month before the foreseen end date. These changes to the mobility study programme should be agreed by all parties within four to seven weeks (after the start of each semester). Any party can request changes within the first two to five-week period after regular classes/educational components have started for a given semester. The exact deadline has to be decided by the institutions. The shorter the planned mobility period, the shorter should be the window for changes. All these changes have to be agreed by the three parties within a two-week period following the request. In case of changes due to an extension of the duration of the mobility period, changes should be made as timely as possible as well. Changes to the study programme abroad should be listed in table C and, once they are agreed by all parties, the sending institution commits to fully recognise the number of ECTS credits as presented in table C. Any exception to this rule should be documented in an annex of the Learning Agreement and agreed by all parties. Only if the changes described in table C affect the group of educational components in the student's degree (table B) that will be replaced at the sending institution upon successful completion of the study programme abroad, a revised version should be inserted and labelled as "Table D: Revised group of educational components in the student's degree that will be replaced at sending institution". Additional rows and columns can be added as needed to tables C and D. All parties must confirm that the proposed amendments to the Learning Agreement are approved. For this specific section, original or scanned signatures are not mandatory and an approval by email may be enough. The procedure has to be decided by the sending institution, depending on the national legislation.