Work and Tripartite Dialogue Sample Clauses

Work and Tripartite Dialogue. Objective: Decent work promoted and tripartite cooperation improved between employers’ organisations, trade unions and public authorities in supporting equitable and sustainable economic and social development Outcomes: Improved social dialogue and tripartite dialogue structures and practices Programme Operator: Innovation Norway
AutoNDA by SimpleDocs

Related to Work and Tripartite Dialogue

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • General Scope of Work The Scope of Work and projected level of effort required for these SERVICES is described in Exhibit “A” attached hereto and by this reference made a part of this AGREEMENT. The General Scope of Work was developed utilizing performance based contracting methodologies.

  • Shiftwork (A) Where the Employee would have received shift loadings had the Employee not been on leave during the relevant period and such loadings would have entitled the Employee to a greater amount than a loading of 17.5% of the payment under clause 23.1(c), then the shift loadings must be added to the payment under clause 23.1(c)(i) instead of the 17.5% loading. (B) Provided further that if the shift allowance would have entitled the Employee to a lesser amount than the loading of 17.5% then such loading of 17.5% shall be used for the purpose of calculating annual leave loading in lieu of the shift allowance.

  • Scoring The number of routes each company operates (Route # 0001-2999, 8000-8199) will be multiplied by 2 to determine the daily number of trips. (Only accidents, breakdowns and service reports related to routes falling in this range will be used for the evaluation). The daily number of trips will be multiplied by 175 to arrive at the annual number of trips. The number of accidents, breakdowns and service complaints will be divided by the total number of trips to calculate a percent figure. Each company’s percentage will be compared to the total average. See below for a sample. BUS COMPANY NUMBER OF TOTAL BKDN PERCENT ACCIDENTS PERCENT2 SERVICE PERCENT3 ROUTES TRIPS BKDN ACCIDENTS REPORTS COMPLAINTS TO TRIPS TO TRIPS TO TRIPS A 360 58680 3 0.01% 27 0.05% 46 0.08% B 48 7824 3 0.04% 4 0.05% 39 0.50% C 123 20049 11 0.05% 9 0.04% 27 0.13% D 91 14833 0.00% 10 0.07% 11 0.07% E 124 20212 20 0.10% 19 0.09% 18 0.09% TOTALS 746 121598 37 0.03% 69 0.06% 141 0.12% To score, if a company’s percentage is less than or equal to the total percentage for that category, the company will be awarded 6 points per category. Percentages greater than the total percentage for each distinct category (Accident, Breakdown, Service Complaints) will be scored according to the following scale: Less than-Equal to Ave. 6 points 0-3% above average 5 points 4-7% above average 4 points 5-8% above average 3 points 9-12% above average 2 points 13-16% 1 points Greater than 17% 0 points Any circumstance whereby a Breakdown or Accident is found by PTS to be ‘Non Reported’ by vendor within the required timeframe (see G-36) will count as (20) ‘Reported’ instances for the purpose of this Contractor Evaluation Scoring.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When Southern Telecom or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port. 3.8.2 An unloaded 2-wire copper Loop must serve the End User. The meet point for the Voice CLEC and the Data LEC is the point of termination on the MDF for the Data LEC's cable and pairs. 3.8.3 The foregoing procedures are applicable to migration to Line Splitting Service from a UNE-P arrangement, BellSouth Retail Voice Service, BellSouth High Frequency Spectrum (CO Based) Line Sharing. 3.8.4 For other migration scenarios to line splitting, BellSouth will work cooperatively with CLECs to develop methods and procedures to develop a process whereby a Voice CLEC and a Data LEC may provide services over the same Loop.

  • Synchronization The Licensor hereby grants limited synchronization rights for One (1) music video streamed online (Youtube, Vimeo, etc..) for up to 500,000 non-monetized video streams on all total sites. A separate synchronisation license will need to be purchased for distribution of video to Television, Film or Video game.

  • Architecture The Private Improvements shall have architectural features, detailing, and design elements in accordance with the Project Schematic Drawings. All accessory screening walls or fences, if necessary, shall use similar primary material, color, and detailing as on the Private Improvements.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!