Construction Reference Drawings definition

Construction Reference Drawings. : means those drawings referred to in Clause 2(8) of the Employer's Requirements - Design in respect of which a Notice has been issued.
Construction Reference Drawings means those drawings referred to in Clause 2(8) of the Authority's Requirements - Design in respect of which a Notice has been issued.
Construction Reference Drawings. : means those drawings referred to in Clause C2 (8) of the Employer's Requirements Section C - Design in respect of which a Notice to proceed has been issued.

Examples of Construction Reference Drawings in a sentence

  • They shall be endorsed by the Contractor as being in accordance with the Construction Reference Drawings.

  • The Design Phase will be complete upon the issue of a Notice by the Engineer in respect of the comprehensive and complete Construction Reference Drawings Submission for the whole of the Permanent Works like foundation, super structures, water tank, plumbing & sewerage works.

  • Submission / Construction Reference Drawings Submission No /Technical Submission No ] in respect of: The contents of this submission are scheduled in Section A below.

  • The Construction Reference Drawings shall form part of the Working Drawings to be used for construction purposes.

  • The first phase involved conducting a pretest of the survey instrument and conducting focus groups.

  • The Design Phase will be completed upon the issue of Notice by the Engineer in respect of the comprehensive and complete Construction Reference Drawings Submission on the last set of the Permanent Works.

  • Working drawings/ Shop drawings prepared by the contractor shall be endorsed/ approved by the Consultant as being in accordance with the Construction Reference Drawings/ Good for construction drawings.12.2 Construction Methods and Temporary WorksThe DDC shall review; update and issue the revised drawings based on material samples, mock-ups of civil, architectural finishes items of the construction contractor without any cost implications.

  • At first, he only wanted to bring his aunt, but because his mother insisted on coming too, Xiao Tian had no choice but to take her with them.When they arrived at Blue Ice Lotus gang headquarters, Ye Qingyu and Ye Xueyin opened their mouths in surprise.

  • The Working Drawings shall include the Construction Reference Drawings, which may be supplemented by further drawings developed in accordance with the Construction Reference Drawings such as site sketches, bar bending schedules, bar reference drawings, fabrication and shop drawings, construction erection sequences, finishes material list with accompanying specification, and the like.

  • The Design Phase will be complete upon the issue of a Notice in respect of the comprehensive and complete Construction Reference Drawings Submission for the whole of the Permanent Works.


More Definitions of Construction Reference Drawings

Construction Reference Drawings. : means those drawings referred to in Clause C2(8)

Related to Construction Reference Drawings

  • Construction Drawings means those drawings containing the technical details associated with the design, construction and installation of the Infrastructure;

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.

  • Contract Drawings means only those drawings specifically entitled as such and listed in the Specifications or in any Addendum, or any drawings furnished by the Commissioner, pertaining or supplemental thereto.

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Construction Budget means the fully-budgeted costs for the acquisition and construction of a given parcel of real property (including, without limitation, the cost of acquiring such parcel of real property, reserves for construction interest and operating deficits, tenant improvements, leasing commissions, and infrastructure costs) as reasonably determined by the Parent in good faith.

  • Construction Cost means and includes the cost of the entire construction of the Project, including all supervision, materials, supplies, labor, tools, equipment, transportation and/or other facilities furnished, used or consumed, without deduction on account of penalties, liquidated damages or other amounts withheld from payment to the contractor or contractors, but such cost shall not include the Consulting Engineer/Architect's fee, or other payments to the Consulting Engineer/Architect and shall not include cost of land or Rights-of-Way and Easement acquisition.

  • Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.

  • construction site means a workplace where construction work is being performed;

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • Construction Work means any work in connection with⎯

  • Construction Works means all works and things necessary to complete the Project in accordance with this Agreement;

  • Constructional Plant means all appliances or things whatever nature required in or about the execution, completion or maintenance of the works or temporary works (as hereinafter defined) but does not include materials or other things intended to form or forming part of the permanent work or temporary housing, hutting, office, stores, etc.,

  • Construction Schedule means a construction schedule indicating the planned start and completion dates of the major activities of the Work as set out in Appendix [ ], a future Appendix;

  • Construction Zone shall have the meaning set forth in Clause 8.3 (i);

  • Construction Costs means land costs, all costs paid to construct and complete the Improvements, as specified on Exhibit "B" attached hereto and made a part hereof.

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

  • Construction Fee means a fee or other remuneration for acting as general contractor and/or construction manager to construct improvements, supervise and coordinate projects or provide major repairs or rehabilitations on a Property.

  • Estimated Construction Cost or “ECC” means the amount calculated by Contractor for the total cost of all elements of the Work based on this Agreement available at the time(s) that the ECC is prepared. The ECC shall be based on current market rates with reasonable allowance for overhead, profit and price escalation and shall include and consider, without limitation, all alternates and contingencies, designed and specified by A/E and the cost of labor and materials necessary for installation of Owner furnished equipment. The ECC shall include all the cost elements included in the AACC, as defined above, and shall represent Contractor’s best current estimate of the Guaranteed Maximum Price it will propose for the Project based on the information then available. The ECC shall not include Contractor’s Pre-Construction Phase Fee, A/E’s Fees, the cost of the land and rights-of-way, or any other costs that are the direct responsibility of Owner.

  • Original construction ’ shall mean the first or initial construction

  • Residential construction means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes, and includes real property pursuant to chapter 499B.

  • Construction Debt means debt incurred to fund (a) all or a portion of a Capital Improvement, (b) interest payments (including periodic net payments under related interest rate swap agreements) and related fees on other Construction Debt or (c) distributions (including incremental Incentive Distributions) on Construction Equity.

  • Base Building shall include the structural portions of the Building, the public restrooms and the Building mechanical, electrical and plumbing systems and equipment located in the internal core of the Building on the floor or floors on which the Premises are located. Tenant shall promptly provide Landlord with copies of any notices it receives regarding an alleged violation of Law. Tenant shall comply with the rules and regulations of the Building attached as Exhibit E and such other reasonable rules and regulations adopted by Landlord from time to time, including rules and regulations for the performance of Alterations (defined in Section 9).

  • Working Drawings means the final working drawings approved by Landlord, as amended from time to time by any approved changes thereto, and “Work” means all improvements to be constructed in accordance with and as indicated on the Working Drawings, together with any work required by governmental authorities to be made to other areas of the Building as a result of the improvements indicated by the Working Drawings. Landlord’s approval of the Working Drawings shall not be a representation or warranty of Landlord that such drawings are adequate for any use or comply with any Law, but shall merely be the consent of Landlord thereto. Tenant shall, at Landlord’s request, sign the Working Drawings to evidence its review and approval thereof. After the Working Drawings have been approved, Tenant shall cause the Work to be performed in accordance with the Working Drawings.

  • As-built drawings, as used in this clause, means drawings submitted by the Contractor or subcontractor at any tier to show the construction of a particular structure or work as actually completed under the contract. “As-built drawings” shall be synonymous with “Record