Design Freeze Date definition

Design Freeze Date means the date set forth in the Time Schedule prior to which a Consortium Member may change the design within or related to its Scope of Work without becoming liable hereunder due to the change.
Design Freeze Date means the date on which both Parties have agreed in Exhibit A that their respective Component Product(s) are ready for volume production and for the release of wafer orders to fabrication.
Design Freeze Date means the date in the column entitled "Design Freeze Date" in the table in appendix A to part 2 of schedule A4 (Assurance) corresponding to a particular Permitted Design Change being the final date on which RfL may instruct such change to the SP's designs as a Permitted Design Change under clause 17.8;

Examples of Design Freeze Date in a sentence

  • The Client shall ensure that all decisions which may result in an impact on previously-engineered infrastructure, ship-run cabling or mechanical integration onboard have been made or confirmed by or on behalf of the Client before the Design Freeze Date.

  • If such design change occurs prior to or on the Design Freeze Date, if any, as determined by the Steering Committee the Consortium Member effecting it shall not be liable to the other Consortium Members for any impacts.


More Definitions of Design Freeze Date

Design Freeze Date means the date as agreed in writing between the Builder and Purchaser where the scope and specifications of the Owner Nominated Equipment are finalized. The Design Freeze Date shall be no later than six (6) months after execution of this Contract.

Related to Design Freeze Date

  • Design flow means the average annual flow or average daily flow specified in an approved facilities plan or approved plans and specifications, the flow specified in a WPDES permit, or the flow required to meet performance standards.

  • Design Phase means the period during which the Transporter shall prepare a draft project proposal for publication in accordance with section 4.3;

  • Design Change is a change in work and/or materials shown in the Schedule of Items and described in Plans or specifications that has been mutually agreed to in writing or ordered by Contracting Officer. Changes of a minor nature (such as adjustment in horizontal and vertical alignment, that do not exceed specified tolerance, necessary to maintain or balance earthwork quantities substantially as designed) and variation in quantities, as described in B5.251, shall not be considered Design Changes.

  • Design-build means a project delivery method in which the detailed design and subsequent construction is provided through a single contract with a Design-Build firm; a team, partnership, or legal entity that includes design professionals and a builder. The Design-Build Project delivery shall be implemented in accordance with Tex. Gov’t Code § 2166.2531.2

  • Design Documentation means all schematics and test, assembly and package documentation relating to the Product, including all design, specification and assembly documentation and data files for Materials, which is necessary for the production, manufacture, qualification, testing and delivery of the Product to be attached as Exhibit A.

  • Live Date means the date on which the Trust is converted onto the Administrator’s system and the Administrator begins calculating the Trust’s official net asset values (“NAV”).

  • Design-Builder means the Person selected pursuant to the RFP that enters into the Contract with the Department to design and construct the Project (also referred to as the “Design-Build Team”).

  • Construction Completion Date means the date by which the overall development of the Project is completed in accordance with the provisions of this Agreement and when the Construction Completion Certificate is issued by the Independent Engineer as per Article 14.1.

  • Design Criteria Package means concise, performance-oriented drawings or specifications for a public construction project. The purpose of the Design Criteria Package is to furnish sufficient information to permit Design-Build Firms to prepare a bid or a response to the District’s Request for Proposals, or to permit the District to enter into a negotiated Design- Build Contract. The Design Criteria Package must specify performance- based criteria for the public construction project, including the legal description of the site, survey information concerning the site, interior space requirements, material quality standards, schematic layouts and conceptual design criteria of the project, cost or budget estimates, design and construction schedules, site development requirements, provisions for utilities, stormwater retention and disposal, and parking requirements applicable to the project. Design Criteria Packages shall require firms to submit information regarding the qualifications, availability, and past work of the firms, including the partners and members thereof.

  • Construction Commencement Date means the date set out in the Addendum, if applicable, by which you must commence construction of the Hotel. For the Hotel to be considered under construction, youmust have begun to pour concrete foundations for the Hotel or otherwise satisfied any site-specific criteria for “under construction” set out in the Addendum.

  • Completion Date means the date of completion of the Services by the Service Provider as certified by the Procuring Entity

  • Rear fog lamp means the lamp used to make the vehicle more easily visible from the rear in dense fog;

  • Design-build team means an entity that consists of:

  • Practical Completion means that stage in the execution of a Named Project when the Works have been completed in accordance with the terms of the relevant Building Contract and/or the terms of this Agreement such that the AHP Dwellings comprised within the Named Project are fit for beneficial occupation as a residential development in accordance with applicable NHBC or equivalent requirements current at the date of inspection subject only to the existence of minor defects and/or minor omissions at the time of inspection which are capable of being made good or carried out without materially interfering with the beneficial use and enjoyment of the Named Project and which would be reasonable to include in a snagging list, and Practically Complete shall be construed accordingly; Process has the meaning ascribed to it in the DPA; Procurement Law means (as the case may be):

  • Mechanical Completion means that (a) all components and systems of the Project have been properly constructed, installed and functionally tested according to EPC Contract requirements in a safe and prudent manner that does not void any equipment or system warranties or violate any permits, approvals or Laws; (b) the Project is ready for testing and commissioning, as applicable; (c) Seller has provided written acceptance to the EPC Contractor of mechanical completion as that term is specifically defined in the EPC Contract.

  • Final Completion Date means the date on which Final Completion occurs.

  • Design-Build Agreement means the design and construction agreement between Project Co and the Design-Builder, a certified copy of which has been delivered by Project Co to the Authority, as amended, supplemented or replaced from time to time in accordance with this Agreement;

  • Project Completion Date means the date on which the Completion Certificate is issued;

  • Programme Date means the date of this Base Prospectus.

  • Improvement Plan means the plan required by the Authority from the Supplier which shall detail how the Supplier will improve the provision of the Goods and/or Services pursuant to Clause 29.1.1 (Authority Remedies);

  • Installation Date means the date specified in the Statement of Work by which the Contractor must have the ordered Equipment ready (certified) for use by the State.

  • As-built drawings, as used in this clause, means drawings submitted by the Contractor or subcontractor at any tier to show the construction of a particular structure or work as actually completed under the contract. “As-built drawings” shall be synonymous with “Record

  • Milestone Date means the date set against the relevant Milestone in the Implementation Plan;

  • Design torso angle means the angle measures between a vertical line through the "R" point and the torso line in a position which corresponds to the design position of the seat-back established by the vehicle manufacturer;

  • Supply Start Date means the date(s) specified in clause 2.8;

  • Commissioning Date means that date when construction of the contemplated Project is complete, and the Maintenance Term commences;