Examples of Dry Utilities in a sentence
Developer shall obtain all proper conveyances and arrangements for the installation and provision of the Dry Utilities to serve the Development.
A plan sheet titled Dry Utilities shall be included with Construction Plan submittal and include all above mentioned utilities.
Water system expansions to individual projects are the responsibility of the developer with fees paid to cover major capital expenditures.• Dry Utilities – Gas, electricity, and telephone services are provided by Southern California Gas Company, Southern California Edison, AT&T, and Verizon Communications, respectively.
Refer to Section IV.M.4, Utility and Service Systems – Dry Utilities, of this Draft EIR, for an impact analysis discussion on electric power, natural gas, and telecommunication facilities.
Dry Utilities (Natural Gas, Electrical, Telecommunications, cable, etc.) This information can be included with street and storm sewer sheets if space allows.
Dry Utilities Plans that are part of a new residential or commercial development are to be submitted as a separate and distinct plan review.
Dry Utilities (Electricity, Natural Gas, and Communication Systems) BJ Palmer & Associates prepared a Dry Utility Analysis & Estimate of Costs (Dry Utility Report) (Appendix K-5) for the proposed project to determine the existing facilities that serve the project site; what additional facilities may be needed for the proposed project; and whether the utility demands of the proposed project can be accommodated by the various providers.
Unless otherwise agreed by the Town and Developer: (1) the Public Improvements shall be owned, operated and maintained by the Town; (2) the Private Improvements shall be owned, operated and maintained by the Developer, the homeowner’s association or a metropolitan district; and (3) the Dry Utilities shall be owned, operated and maintained, as appropriate and otherwise authorized, by the Developer, the homeowner’s association, a metropolitan or special district or the appropriate public utility company.
The estimated tonnage was then compared to the processing capacity at the Materials Recovery Facility and the remaining capacity of the landfill to determine whether additional capacity would be required.Electricity, Natural Gas, and TelecommunicationThe existing and future infrastructure electricity, natural gas, and telecommunications facilities area were evaluated in the Technical Dry Utilities Study for the Sierra Vista Specific Plan (Capitol Utility Specialists 2009).
Revise Section 9.0, Infrastructure, 9.1.4, Dry Utilities, 4th bullet as follows.