Examples of Elevation certificate in a sentence
Include static pressure for the required fire sprinkler system installation.□□Form #310 – Statement of Special Inspections (2 paper copies) - Must be completed by the design engineer (or architect if no engineer or applicant if no design professional).□□Floodplain Elevation Certificate or Letter of Map Revision (LOMR) (1 paper copy for both ePlan and paper submittals) - Elevation certificate stamped and signed by licensed surveyor.
Elevation certificate to be prepared by an Oregon licensed architect, engineer, or surveyor Submit the elevation certificate to the city’s Floodplain Administrator and the City’s Building Official.
Elevation certificate for buildings, mobile homes, and above ground gas or liquid storage tanks in area of special flood hazard (SJCC Chapter 15.12).
Elevation certificate – An official form (FEMA Form 81-31, 08/99 as amended) that:a.
Elevation certificate required following construction: Following construction of a structure within the floodplain where the base flood elevation is provided, the applicant shall be required to submit to the Administrator an as-built elevation certificate from a licensed professional land surveyor that records the elevation of the lowest floor.