Equipment Procurement Schedule definition

Equipment Procurement Schedule has the meaning set out in Appendix 2E [Equipment and Furniture];
Equipment Procurement Schedule means the schedule attached as Attachment 3 to this Appendix, as updated in accordance with Section 8.5 of this Appendix;
Equipment Procurement Schedule means the Equipment procurement schedule attached as Attachment 4 to Appendix 2D [Equipment and Furniture], as updated in accordance with Section 9.5 of Appendix 2D [Equipment and Furniture];

Examples of Equipment Procurement Schedule in a sentence

  • Project Co will, as required from time to time until Service Commencement, but no less than once per calendar month by the 15th day of each month, in consultation with the Authority, update the Equipment Procurement Schedule so that it is at all times an accurate, reasonable and realistic representation of Project Co’s plans for the procurement of the Project Co Procured Equipment in accordance with the requirements of this Agreement.

  • Project Co will require the Equipment Procurement Schedule to allow adequate time to achieve the matters contemplated by this Appendix without any adverse effect on Design and Construction (including Design and Construction to accommodate the Project Co Procured Equipment) and without any adverse effect on Project Co’s ability to achieve Service Commencement by the applicable Target Service Commencement Date.

  • Project Co will, as required from time to time until Service Commencement, but no less than once per calendar month by the 15th day of each month, in consultation with the Authority, update the Equipment Procurement Schedule so that it is at all times an accurate, reasonable and realistic representation of Project Co's plans for the procurement of the Project Co Procured Equipment in accordance with the requirements of this Agreement.

  • Project Co will be responsible for ensuring the Equipment Procurement Schedule addresses the time periods required for such training, but will not be responsible for delay in training resulting from the failure of the Owner to make the applicable Owner staff available for training in accordance with the Equipment Procurement Schedule, nor for the unavailability of training personnel to be supplied by the respective equipment manufacturers or suppliers in breach of their respective contracts.

  • The Owner is responsible to ensure the applicable staff is available for the training described above, in accordance with the Equipment Procurement Schedule.

  • Those eligible subjects who are met the inclusion criteria were invited to participate in the study as the voluntary.

  • Project Co will, as required from time to time until Service Commencement, but no less than once per calendar month by the 15th day of each month, in consultation with the Owner, update the Equipment Procurement Schedule so that it is at all times an accurate, reasonable and realistic representation of Project Co's plans for the procurement of the Cash Allowance Equipment in accordance with the requirements of this Agreement.

  • In orange crosses, we show post-AIC binaries that are undergoing an LMXB phase, having since initiated a phase of RLOF between a WD and an NS.

  • The Equipment Procurement Schedule must be part of an integrated install and commissioning schedule that sequences IT systems and infrastructure required for other equipment to be installed.

  • Unless otherwise defined, all capitalised terms used herein shall bear the same meaning as ascribed to them in the announcement dated 19 June 2015 (the “Announcement”).


More Definitions of Equipment Procurement Schedule

Equipment Procurement Schedule means Appendix 2J, as revised and finalized in accordance with Section 6.2 of this Appendix; and

Related to Equipment Procurement Schedule

  • Contract Schedule means a schedule to this Contract;

  • Project Schedule means a document that, with respect to each Phase of the Project, identifies, coordinates and integrates the anticipated design and construction schedules, the Contracting Authority’s and Owner's responsibilities, government authority reviews and other activities as are necessary for the timely completion of the Work.

  • Construction Schedule means a construction schedule indicating the planned start and completion dates of the major activities of the Work as set out in Appendix [ ], a future Appendix;

  • Procurement Plan means the Recipient’s procurement plan for the Project, dated April 2, 2010, and referred to in paragraph 1.16 of the Procurement Guidelines and paragraph 1.24 of the Consultant Guidelines, as the same shall be updated from time to time in accordance with the provisions of said paragraphs.

  • Project Completion Schedule means the progressive Project Milestones set forth in Schedule-J for completion of the Project Highway on or before the Scheduled Completion Date;

  • Tourism destination project means a qualified non-gaming business facility that will be among the most visited privately owned or operated tourism or recreation sites in the State, and which is located within the qualified incentive area and has been determined by the authority to be in an area appropriate for development and in need of economic development incentive assistance, including a non-gaming business within an established Tourism District with a significant impact on the economic viability of that District.

  • Payment Schedule ’ means a schedule which sets out—

  • Specification Schedule means the Schedule containing details of the Specification.

  • Standard equipment means the basic configuration of a vehicle which is equipped with all the features that are required under the regulatory acts of the Contracting Party including all features that are fitted without giving rise to any further specifications on configuration or equipment level.

  • Delivery Schedule means the schedule for the delivery of Services as set forth in attached Annex 3.

  • Completion Schedule means the fulfilment of the Related Services by the Supplier in accordance with the terms and conditions set forth in the Contract;

  • e-Procurement means the use of information and communication technology (especially the internet) by the Procuring Entity in conducting its procurement processes with bidders for the acquisition of goods (supplies), works and services with the aim of open, non discriminatory and efficient procurement through transparent procedures;

  • MSAA Indicator Technical Specifications document means, as the context requires, either or both of the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Indicator Technical Specifications November 5, 2018 Version 1.3” and the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Target and Corridor-Setting Guidelines” as they may be amended or replaced from time to time;

  • Baseline Schedule means the initial time schedule prepared by Contractor for Owner’s information and acceptance that conveys Contractor’s and Subcontractors’ activities (including coordination and review activities required in the Contract Documents to be performed by A/E and ODR), durations, and sequence of work related to the entire Project to the extent required by the Contract Documents. The schedule clearly demonstrates the critical path of activities, durations and necessary predecessor conditions that drive the end date of the schedule. The Baseline Schedule shall not exceed the time limit current under the Contract Documents.

  • Large Facility Interconnection Procedures or “LFIP”) shall mean the interconnection procedures applicable to an Interconnection Request pertaining to a Large Generating Facility that are included in Attachment X of the ISO OATT. Standard Large Generator Interconnection Agreement (“LGIA”) shall mean this Agreement, which is the form of interconnection agreement applicable to an Interconnection Request pertaining to a Large Generating Facility, that is included in Appendix 4 to Attachment X of the ISO OATT. System Deliverability Upgrades shall mean the least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements, to make the modifications or additions to Byways and Highways and Other Interfaces on the existing New York State Transmission System and Distribution System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Deliverability Interconnection Standard at the requested level of Capacity Resource Interconnection Service. System Protection Facilities shall mean the equipment, including necessary protection signal communications equipment, required to (1) protect the New York State Transmission System from faults or other electrical disturbances occurring at the Large Generating Facility and (2) protect the Large Generating Facility from faults or other electrical system disturbances occurring on the New York State Transmission System or on other delivery systems or other generating systems to which the New York State Transmission System is directly connected. System Upgrade Facilities shall mean the least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements, to make the modifications to the existing transmission system that are required to maintain system reliability due to: (i) changes in the system, including such changes as load growth and changes in load pattern, to be addressed in the form of generic generation or transmission projects; and (ii) proposed interconnections. In the case of proposed interconnection projects, System Upgrade Facilities are the modifications or additions to the existing New York State Transmission System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Minimum Interconnection Standard. Tariff shall mean the NYISO Open Access Transmission Tariff (“OATT”), as filed with the Commission, and as amended or supplemented from time to time, or any successor tariff. Trial Operation shall mean the period during which Developer is engaged in on-site test operations and commissioning of the Large Generating Facility prior to Commercial Operation.

  • Implementation Schedule means the Implementation Schedule in Section VII of the tendering documents.