Equivalent Unplanned Outage Hours definition

Equivalent Unplanned Outage Hours refers to the sum of Unplanned Outage hours and unplanned Equivalent Unit Derated Hours.
Equivalent Unplanned Outage Hours refers to the sum of Unplanned Outage 2 As for hydropower station, the restrictions shall include the restrictions on the unit output by river, shipping, etc. hours and unplanned Equivalent Unit Derated Hours.

Related to Equivalent Unplanned Outage Hours

  • Planned Outage means the removal of equipment from service availability for inspection and/or general overhaul of one or more major equipment groups. To qualify as a Planned Outage, the maintenance (a) must actually be conducted during the Planned Outage, and in Seller’s sole discretion must be of the type that is necessary to reliably maintain the Project, (b) cannot be reasonably conducted during Project operations, and (c) causes the generation level of the Project to be reduced by at least ten percent (10%) of the Contract Capacity.

  • Unplanned Outage refers to the unavailable status of the units of the Power Plant other than Planned Outage. Based on the urgency of the needs of outage, the Unplanned Outage can be classified into five categories: (1) immediate outage; (2) the outage which could be delayed for a short while but the units must exit within six hours; (3) the outage which could be postponed over six hours but the units must exit within seventy-two hours; (4) the outage which could be deferred over seventy-two hours but the units must exit before the next Planned Outage; and (5) the prolonged outage which is beyond the period of the Planned Outage.

  • Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.

  • Excused Outage means any disruption to or unavailability of Services caused by or due to (i) Scheduled Maintenance,

  • Planned Downtime means scheduled maintenance and Software or application upgrades; or setting up a new customer or service and service modifications;

  • Downtime means the Total Minutes in the Month during which the Cloud Service (or Servers for Server Provisioning) does not respond to a request from SAP’s Point of Demarcation for the data center providing the Cloud Service (or Server for Server Provisioning), excluding Excluded Downtime.

  • Generator Forced Outage means an immediate reduction in output or capacity or removal from service, in whole or in part, of a generating unit by reason of an Emergency or threatened Emergency, unanticipated failure, or other cause beyond the control of the owner or operator of the facility, as specified in the relevant portions of the PJM Manuals. A reduction in output or removal from service of a generating unit in response to changes in market conditions shall not constitute a Generator Forced Outage.

  • Forced Outage means any unplanned reduction or suspension of the electrical output from the Project or unavailability of the Project in whole or in part from a Unit in response to a mechanical, electrical, or hydraulic control system trip or operator-initiated trip in response to an alarm or equipment malfunction and any other unavailability of a Unit for operation, in whole or in part, for maintenance or repair that is not a Planned Outage and not the result of Force Majeure.

  • Core Hours means the period beginning at 8am and ending at 6.30pm on any day from Monday to Friday except Good Friday, Christmas Day or bank holidays;

  • Support Hours means 24 hours per day with the exception of first and second Christmas Day, and New Year’s Day;

  • Outage has the meaning set forth in the CAISO Tariff.

  • Scheduled Outage has the meaning given to it in the Grid Code;

  • Excused Downtime means the number of minutes in the Charging Period, rounded to the nearest minute that the link state of Customer’s Port is ‘down’ due to:

  • Service Outage means an instance when the Customer is unable to route traffic to one or more Customer Sites via the Network, which results in Service Downtime;

  • Kilowatt-hour or “kWh” shall mean three decimal six million (3.6 10E6) Joule

  • Network Termination Point (NTP) means the physical point at which a subscriber is provided with access to a public communications network; in the case of networks involving switching or routing, the NTP is identified by means of a specific network address, which may be linked to a subscriber number or name;

  • Generator Maintenance Outage means the scheduled removal from service, in whole or in part, of a generating unit in order to perform necessary repairs on specific components of the facility, if removal of the facility meets the guidelines specified in the PJM Manuals.

  • Work Day means any day that an Employee is regularly scheduled to work and for which the Employee receives payment from the Employer.