Final Safety Analysis Report definition

Final Safety Analysis Report or "FSAR" means the report, as updated, -------------------------------------- that is required to be maintained for NMP-2 in accordance with the requirements of 10 C.F.R. (S) 50.71(e).
Final Safety Analysis Report or "FSAR" means the report, as updated, that is required for the Facility in accordance with the requirements of 10 C.F.R. ss. 50.71(e).
Final Safety Analysis Report means the final safety analysis report to be submitted by Owners pursuant to 10 C.F.R. § 52.79(b) and as more specifically defined in 10 C.F.R. § 50.34(b). “[***]” has the meaning set forth in Section 7.3(c).

Examples of Final Safety Analysis Report in a sentence

  • Additionally, the inspectors reviewed the Updated Final Safety Analysis Report (UFSAR) and performance requirements for systems selected for inspection, and verified that operator actions were appropriate as specified by plant specific procedures.

  • During the inspection, the inspectors focused on plant specific design features and the licensee’s procedures used to mitigate or respond to adverse weather conditions.Additionally, the inspectors reviewed the Updated Final Safety Analysis Report (UFSAR) and performance requirements for systems selected for inspection, and verified that operator actions were appropriate as specified by plant specific procedures.

  • A preliminary architecture diagram for each site, such as those shown in Section 4, can be used to visualize the overall arrangement of and connections between network devices and SRS equipment (e.g., video cameras, door sensors, motion sensors, water quality analyzers).

  • Any changes to the Initial Test Program described in Section 14 of the Final Safety Analysis Report made in accordance with the provisions of 10 CFR 50.59 shall be reported in accordance with 50.59(b) within one month of such change.

  • Revisions have been made to this COLA in Part 1 and in Part 2 Chapters 1, 13, and 17 of the Final Safety Analysis Report, in order to properly reflect the division of responsibility under the licenses as between NINA and STPNOC.

  • Additionally, the inspectors reviewed the Updated Final Safety Analysis Report (UFSAR) and performance requirements for systems selected for inspection, and verified that operator actions were appropriate as specified by plant-specific procedures.

  • The inspectors reviewed applicable operating procedures, system diagrams, Updated Final Safety Analysis Report, technical specification requirements, administrative technical specifications, outstanding work orders, condition reports, and the impact of ongoing work activities on redundant trains of equipment in order to identify conditions that could have rendered the systems incapable of performing their intended functions.

  • As specified by Appendix D to 10 CFR 52, IV.A.2.a, the plant-specific Final Safety Analysis Report (FSAR), has retained the organization and numbering of AP1000 Design Control Document (DCD), except where departures are taken and justified.

  • A.19 Updated Final Safety Analysis Report (electronic format only).

  • Additionally, for the purpose of this evaluation and the NRC staff’s interim staff evaluation (ISE), licensee statements, commitments, and references to existing programs that are subject to routine NRC oversight (Updated Final Safety Analysis Report (UFSAR) program, procedure program, quality assurance program, modification configuration control program, etc.) will generally be accepted.


More Definitions of Final Safety Analysis Report

Final Safety Analysis Report or ("FSAR") means the report, as updated, that is required to be maintained for TMI-1 in accordance with the requirements of 10 CFR Section 50.71(e).
Final Safety Analysis Report or "FSAR" means the report, as updated, that is required for the Facilities in accordance with the requirements of 10 C.F.R. (S) 50.71(e). "FIRPTA Affidavit" means the affidavit to be delivered by each Seller at the Closing at which it is transferring its Ownership Shares in substantially the form of Exhibit G attached hereto. "Fitchburg" has the meaning set forth in the preamble to this Agreement. "Fuel Purchase Price" has the meaning set forth in Section 2.5(a). "Fuel Purchase Price Adjustment" has the meaning set forth in Section 2.6(c)(ii). "Fuel Trust" means the Niantic Bay Fuel Trust financing arrangements entered into by CL&P and WMECO. "GAAP" means United States generally accepted accounting principles as in effect from time to time. "Good Utility Practices" means any of the practices, methods and acts engaged in or approved by a significant portion of the electric utility industry during the relevant time period, or any of the practices, methods or acts which, in the exercise of reasonable judgment in light of the facts known at the time the decision was made, could have been expected to accomplish the desired result at a reasonable cost consistent with good business practices, reliability, safety and expedition. Good Utility Practices are not intended to be limited to the optimum practice, method or act to the exclusion of all others, but rather to be acceptable practices, methods or acts generally accepted in the region. "Governmental Authority" means any federal, state, local or other governmental, regulatory or administrative agency, commission, department, board, or other governmental subdivision, court, tribunal, arbitral body or other governmental authority. "Xxxx-Xxxxx-Xxxxxx Act" means the Xxxx-Xxxxx-Xxxxxx Antitrust Improvements Act of 1976, as amended. "Hazardous Material" or "Hazardous Materials" means oil and hazardous materials or wastes, air emissions, hazardous or toxic substances, wastewater discharges and any chemical, material or substance or other emissions that may give rise to Liability under, or is listed or regulated under, applicable Environmental Laws as a "hazardous" or "toxic" substance or waste, -104-
Final Safety Analysis Report or "FSAR" means the report, as updated, that is required to be maintained for VYNPS in accordance with the requirements of 10 C.F.R. Section 50.71(e).

Related to Final Safety Analysis Report

  • Operating Statement Analysis Report format substantially in the form of and containing the information called for therein for the Mortgage Loans, or such other form for the presentation of such information as may be approved from time to time by the CREFC® for commercial mortgage securities transactions generally.

  • CREFC® Operating Statement Analysis Report The monthly report in the “Operating Statement Analysis Report” format substantially in the form of and containing the information called for therein for the Mortgage Loans, or such other form for the presentation of such information as may be approved from time to time by the CREFC® for commercial mortgage securities transactions generally.

  • CMSA Operating Statement Analysis Report means a report substantially in the form of, and containing the information called for in, the downloadable form of the "Operating Statement Analysis Report" available as of the Closing Date on the CMSA Website or in such other form for the presentation of such information and containing such additional information as may from time to time be approved by the CMSA for commercial mortgage-backed securities transactions generally.

  • Root Cause Analysis Report means a report addressing a problem or non-conformance, in order to get to the ‘root cause’ of the problem, which thereby assists in correcting or eliminating the cause, and prevent the problem from recurring.

  • Material safety data sheet or "MSDS" means the chemical, physical, technical, and safety information document supplied by the manufacturer of the coating, solvent, or other chemical product, usually through the distribution network or retailers.

  • Market Analysis means a technique used to identify market characteristics for specific goods or services “National Treasury” has the meaning assigned to it in section 1 of the Municipal Finance Management Act, 2003 (Act No. 56 of 2003);

  • health and safety file means a file, or other record containing the information in writing required by these Regulations "health and safety plan" means a site, activity or project specific documented plan in accordance with the client's health and safety specification;

  • Asset adequacy analysis means an analysis that meets the standards and other requirements referred to in 5.34(5)“d.”

  • Project Management Report means each report prepared in accordance with Section 4.02 of this Agreement;

  • GLJ Report means the independent engineering reserves evaluation of certain oil, NGL and natural gas interests of the Company prepared by GLJ dated February 11, 2022 and effective December 31, 2021.

  • Development Report means a written account of Licensee’s progress under the Development Plan having at least the information specified on Appendix B to this Agreement, and shall be sent to the address specified on Appendix B.

  • Forensic analysis means the practice of gathering, retaining, and analyzing computer-related data for investigative purposes in a manner that maintains the integrity of the data.

  • risk analysis the analysis required under Rule 17f-7(a)(1)(i)(A).

  • Test Report means a written report issued by The Sequoia Project that documents the outcomes of the Testing Process; that is, the Applicant’s compliance with the Specifications and Test Materials.

  • Evaluation Report means a report on the evaluation of tenders prepared under CSO 12

  • Sustainability Report the annual non-financial disclosure report prepared in accordance with the Standard for Sustainability Reporting publicly reported by the Borrowers and published on an Internet or intranet website to which each Bank and the Administrative Agent have been granted access free of charge (or at the expense of the Borrowers).

  • Acoustic Assessment Report means the report, prepared in accordance with Publication NPC-233 and Appendix A of the Basic Comprehensive User Guide,by HGC Engineering and dated August 22, 2008 submitted in support of the application, that documents all sources of noise emissions and Noise Control Measures present at the Facility and includes all up-dated Acoustic Assessment Reports as required by the Documentation Requirements conditions of this Certificate to demonstrate continued compliance with the Performance Limits following the implementation of any Modification.

  • Final Report means the report described as a final report in 14 RCW 42.17.080(2).

  • Risk assessment means a programme to determine any risk associated with any hazard at a construction site , in order to identify the steps needed to be taken to remove, reduce or control such hazard;

  • Certificate of Analysis means a document signed by an authorized representative of Manufacturer, describing Specifications for, and testing methods applied to, Product, and the results of testing.

  • Cost Report means a report detailing all costs incurred in relation to the Activity, to be submitted by the Incubatee to the Incubator.

  • health and safety specification means a site, activity or project specific document prepared by the client pertaining to all health and safety requirements related to construction work;

  • MI Report means a report containing Management Information submitted to the Authority in accordance with Framework Schedule 8 (Management Information);

  • Compliance Statement is that certain statement in the form attached hereto as Exhibit B.

  • SOS Reports means the official reports from the Secretaries of State of each Collateral State, Chief Executive Office State and the Borrower State and other applicable federal, state or local government offices identifying all current security interests filed in the Collateral and Liens of record as of the date of such report.

  • ESDM Report means the Emission Summary and Dispersion Modelling Report prepared in accordance with the Procedure Document by Envision Compliance and dated July 3, 2007 submitted in support of the application, and includes any amendments to the ESDM Report listed in Schedule A and all up-dated ESDM Reports prepared as required by the Documentation Requirements conditions of this Certificate.