Final Survey definition
Examples of Final Survey in a sentence
A Final Survey shall not be approved until all pins and benchmarks are placed and placement of same is certified by the Surveyor.
The Contractor shall conduct the Route Survey and select the cable route for the System in accordance with the information in the Final Survey Report.
A copy of the restrictions, if any, within the community shall accompany the Final Survey, shall be notarized and filed for record in the office of the County Clerk.
Feedback from Students (data from Final Survey) show that: •some appreciated the opportunity to attend the class from any place and were able to follow lectures and productively participate in class;•others were bothered and felt distracted by the dynamics imposed by technology (switching from Zoom, to a PowerPoint, to SacCT), the lack of many students’ participation in group activities, and the inability to see me physically in class.
Any matters shown on the Final Survey that are not on the Initial Survey and are objected to by Buyer shall be corrected at Seller's sole cost prior to the Closing Date, except that Seller shall not be obligated to correct survey matters arising solely from changes enacted by governmental authorities after the date of the Initial Survey (e.g. changes in setback requirements).
The updated survey (the "Final Survey") shall be in a form acceptable to the Title Company for the deletion of the standard survey exceptions without the addition of further exceptions to title and shall disclose no title defects, encroachments or other matters not shown on the Initial Survey, unless the same are acceptable to Buyer in its sole and absolute discretion.
Any and all other information necessary to duplicate the Final Survey and IDP on the ground is required.
Final Survey No later than the date [eighteen (18)] months prior to the Expiry Date, the Authority shall be entitled to carry out or procure the carrying out of a final survey of the Sites to assess whether they have been and are being maintained by the Contractor in accordance with its obligations under clause 23.1 (Maintenance).
Submit the Final Survey Report to the KYTC Survey Coordinator in the Division of Highway Design and the Engineer.Reset all monuments disturbed or destroyed during or prior to construction, with the same accuracy as stated previously.
Update the Control Monument Information Sheet with any new data and include in the Final Survey Report.