Examples of Free Power in a sentence
Net Present Value of all the cash flows on accout of value of Free Power to be realised(inflow), and the payment of Terminal Price(out flow) to be paid at the end of 35th anniversary of the Scheduled COD shall be calculated as on the Scheduled COD based on the Bid Variables quoted in format at Error! Reference source not found.
Further, the Contracted Capacity comprising of Free Power, LADF and power to be procured by the Procurer shall however be as per the revised Installed Capacity and not the Installed Capacity indicated herein.
The Free Power to be supplied by the Seller calculated at the rate of Rs. 2.000 per kWh shall be considered as inflow to the Procurer for the term of PPA starting from Scheduled COD till the thirty fifth (35th) anniversaryof the Scheduled COD and payment of Terminal Price shall be outflow of the Procurer in the 35th year..
Further, the Procurer intends to procure from the Seller for the term of PPA thirty(30) Per Cent of Net Energy from the Project after adjusting for Free Power and One Per Cent (1%) of power towards LADF .
The Seller shall be responsible for supply of Free Power and LADF power.
Besides working on Free Power Resources, JREDA has been instrumental in envisioning the policy architecture for implementation of Renewable Energy Policy and formulates innovative policies that transform challenges into opportunities and in turn in the success to overcome the barriers.
The Commission continued with the above methodology for determination of Free Power rate for FY15, FY16, FY17, FY18 & FY19 and fixed the rate of Free Power at Rs. 2.87, Rs. 2.80, Rs. 2.92, Rs. 2.63 and Rs. 2.48 per unit respectively.
In these conditions, an optimization realized with GasTurb11 allowed toassume the geometry and performances of the DRAGON’s turboshaft using a hypothetical 2 spool machine with an additional Free Power Turbine (FPT) working independently from the compression stages.
The Commission while determining the Free Power rate for FY15 decided that it will continue with the this methodology for determining the rate of free power during the Third MYT Control Period from FY15 to FY19 because this approach allows best possible rate of power to the State Govt.
However, the royalty shall not be payable if: • If NEA is in default of its payment obligations under the Domestic PPA;• Any payments received from GON or NEA in the circumstances described in the following PDA sections: Section 6.1 (GON rights and obligations), 12.7 (Staggered Remedies) or 12A.6 (Change in Law) or Local Free Power.