Frontage Roads definition
Examples of Frontage Roads in a sentence
In addition, Developer will have the right to conduct a speed study of the Managed Lanes, General Purpose Lanes and Frontage Roads earlier than the three-year interval, but in no event sooner than 18 months after completion of the immediately preceding speed study for the same portion of the Managed Lanes, General Purpose Lanes or Frontage Roads, if Developer in good faith believes that significant changes have occurred in the interim that will or may affect posted speed limits.
In addition, Developer will have the right to conduct a speed study of the Managed Lanes, General Purpose Lanes and Frontage Roads in the Facility earlier than the three-year interval, but in no event sooner than 18 months after completion of the immediately preceding speed study for the same portion of the Managed Lanes, General Purpose Lanes or Frontage Roads, if Developer in good faith believes that significant changes have occurred in the interim that will or may affect posted speed limits.
In addition, Developer will have the right to conduct a speed study of the Toll Lanes, General Purpose Lanes and Frontage Roads earlier than the three-year interval, but in no event sooner than 18 months after completion of the immediately preceding speed study for the same portion of the Toll Lanes, General Purpose Lanes or Frontage Roads, if Developer in good faith believes that significant changes have occurred in the interim that will or may affect posted speed limits.
The ENGINEER will provide engineering services required for the preparation of plans, specifications and estimates (PS&E) and related documents, for State Highway 99 (SH 99) from Highland Knolls / Bay Hill Boulevard to South Fry Road Frontage Roads Project Segment for North Bound Mainlanes Bridge Widening and Retaining Walls at Highland Knolls in Fort Bend County.
The ENGINEER will provide a single stand-alone PS&E delivery package for SH 99 delivered in conjunction and coordination with the State Highway 99 (SH 99) from Highland Knolls / Bay Hill Boulevard to South Fry Road Frontage Roads Project.
When Frontage Roads are shown in the Contract Documents, they shall be constructed prior to the closing of any access routes unless other approved access is provided and is acceptable to the property owner.
No additional measurement will be made for ramps, Auxiliary ▇▇ ▇▇▇▇▇, service roads, Frontage Roads, or Shoulders.
No additional measurement will be made for ramps, Auxiliary ▇ ▇▇▇▇▇, service roads, Frontage Roads, or Shoulders.
Thereafter, Buyer shall pay and discharge all such Specified Liabilities as and when such Specified Liabilities become due and owing.
Unless decided differently in the Pavement Design Concept Conference, the design alternatives shall be provided as follows: • Mainlanes (CRCP) for up to 4 different subgrade conditions ❖ PCC over HMAC base ❖ PCC over CTB base • Frontage Roads (HMAC) for up to 4 different subgrade conditions ❖ HMAC over HMAC base ❖ HMAC over FLEX base • County Roads, FM Roads and US Highway intersections (HMAC) estimated at but not limited to 12 pavement designs with 1 subgrade condition each.